San Pedro Waterfront-Harbor Blvd Roadway & 22nd St Parking Lot Improvements
| Agency: | City of Los Angeles |
|---|---|
| State: | California |
| Type of Government: | State & Local |
| NAICS Category: |
|
| Posted Date: | May 12, 2026 |
| Due Date: | Jun 11, 2026 |
| Solicitation No: | 229927 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
San Pedro Waterfront-Harbor Blvd Roadway & 22nd St Parking Lot Improvements
| Status |
|
Stage
Open
|
|
Posted
5/12/2026
|
|
Bid Due
6/11/2026, 02:45 PM PDT
|
|
Partner
No |
| Contact |
|
Organization
City of Los Angeles
|
|
Department
Harbor Department, Port of Los Angeles
|
|
Name
Jill De Montagnac
|
|
Email
Email
jdemontagnac@portla.org
|
|
Phone
|
|
Technical Assistance Deadline
|
- Summary
- More Tabs
Opportunity ID
Organization
229927
City of Los Angeles
Category
Bid Method
Type
Construction
Whole Item
RFB - Request For Bid
Description
San Pedro Waterfront – Harbor Boulevard Roadway and 22nd Street Parking Lot
Improvements Project consists of developing and redeveloping 17.5 acres of
parking improvements for a total of approximately 1,900 parking stalls and
roadway improvements at Harbor Boulevard (formerly known as Sampson Way) from SP Slip to 22nd Street. The 208 East 22nd Street Parking Lot Improvements and Public Access Improvements (Drawing Nos. 1-3514 and 1-3536) Project consists of demolition of the Red Car maintenance and storage facility and fisherman storage areas and other existing improvements including clearing and grubbing, grading, asphalt concrete paving, and striping; installation of site lighting and conduit for future cabling; security fencing and cameras; parking ticket dispensers, pay stations, and gate arms; cast-in-place concrete retaining walls; construction of a concrete masonry unit (CMU) restroom building with utilities; and other improvements. The Harbor Boulevard from SP Slip to 22nd Street Roadway
Improvements (Drawing No. 1-3597) Project includes reconfiguration and
expansion of a section of Harbor Boulevard from SP Slip to 22nd Street to include 2 travel lanes in each direction, a scenic pedestrian walkway, and pedestrian
access. Improvements include demolition and removal Work; removal and
relocation of existing utilities; construction of curb and gutter; grading new
boulevard alignment; placing crushed miscellaneous base; cold milling existing
pavement; paving; pavement markings; relocation of existing and installation of
new signage; sidewalks; street trees and landscaping; lighting; site cleanup; and
other improvements.
Improvements Project consists of developing and redeveloping 17.5 acres of
parking improvements for a total of approximately 1,900 parking stalls and
roadway improvements at Harbor Boulevard (formerly known as Sampson Way) from SP Slip to 22nd Street. The 208 East 22nd Street Parking Lot Improvements and Public Access Improvements (Drawing Nos. 1-3514 and 1-3536) Project consists of demolition of the Red Car maintenance and storage facility and fisherman storage areas and other existing improvements including clearing and grubbing, grading, asphalt concrete paving, and striping; installation of site lighting and conduit for future cabling; security fencing and cameras; parking ticket dispensers, pay stations, and gate arms; cast-in-place concrete retaining walls; construction of a concrete masonry unit (CMU) restroom building with utilities; and other improvements. The Harbor Boulevard from SP Slip to 22nd Street Roadway
Improvements (Drawing No. 1-3597) Project includes reconfiguration and
expansion of a section of Harbor Boulevard from SP Slip to 22nd Street to include 2 travel lanes in each direction, a scenic pedestrian walkway, and pedestrian
access. Improvements include demolition and removal Work; removal and
relocation of existing utilities; construction of curb and gutter; grading new
boulevard alignment; placing crushed miscellaneous base; cold milling existing
pavement; paving; pavement markings; relocation of existing and installation of
new signage; sidewalks; street trees and landscaping; lighting; site cleanup; and
other improvements.
Proposal Submission Method
Links
Compliance Document List
Please login to find compliance document list
| Prime NAICS | Industry |
| 238190: Other Foundation, Structure, and Building Exterior Contractors | Construction |
| 238110: Poured Concrete Foundation and Structure Contractors | Construction |
| 236220: Commercial and Institutional Building Construction | Construction |
| 562112: Hazardous Waste Collection | Administrative and Support and Waste Management and Remediation Services |
| 237990: Other Heavy and Civil Engineering Construction | Construction |
| 237110: Water and Sewer Line and Related Structures Construction | Construction |
| 237130: Power and Communication Line and Related Structures Construction | Construction |
| 237310: Highway, Street, and Bridge Construction | Construction |
| 238120: Structural Steel and Precast Concrete Contractors | Construction |
| 238130: Framing Contractors | Construction |
| 238140: Masonry Contractors | Construction |
| 238160: Roofing Contractors | Construction |
| 238210: Electrical Contractors | Construction |
| 238220: Plumbing, Heating, and Air-Conditioning Contractors | Construction |
| 238330: Flooring Contractors | Construction |
| 238910: Site Preparation Contractors | Construction |
| 238990: All Other Specialty Trade Contractors | Construction |
| 484230: Specialized Freight (except Used Goods) Trucking, Long-Distance | Transportation and Warehousing |
| 561730: Landscaping Services | Administrative and Support and Waste Management and Remediation Services |
| 561990: All Other Support Services | Administrative and Support and Waste Management and Remediation Services |
| 562910: Remediation Services | Administrative and Support and Waste Management and Remediation Services |
| Sub NAICS | Industry |
Meetings
| Date | Location | Description |
|
5/28/2026, 09:00 AM PDT
|
Microsoft Teams:
Microsoft Teams |
Virtual Pre-Bid
A virtual pre-bid conference shall be held on May 28, 2026, at 9:00 a.m. via Microsoft Teams; https://teams.microsoft.com/meet/2166773873533?p=zw9NVyFs2VMaYggf58. Please RSVP to Graciel Batz at GBatz@portla.org if you plan to attend. The agenda and related materials shall be posted to CDBON and shall be discussed in detail at the meeting.
|
Documents
| Name | Uploaded | Size |
| 2822 - NIB | 5/12/2026, 09:50 AM PDT | 549.1 kB |
Get Government Bids Like This by Email
Receive daily bid alerts that match your keywords, business categories, and target regions.
See Also
Basic Information Title IFB 133887 Airfield South Perimeter Fence Replacement Agency California Military
State Government of California
Due by 11/24/2026
Basic Information Title Simpkins Stadium Center Roof & HV Replacement Agency CSU, San
State Government of California
Due by 12/10/2026
RFQ/P #26-27-12 Franklin High School Building "A" HVAC Project Franklin_HVAC_DSA_Approved_DRAWING_A Franklin_Building_A_HVAC_Project_Manual_LLB_Documents_and_SPECS A
Stockton Unified School District
Due by 11/19/2026
Project: FY2023-24 Culvert Replacements - Lincoln Rd at Snake River Ref. #: ST31002440N
Sutter County
Due by 11/10/2026
* Disclaimer: This website provides information about bids, requests for proposals (RFPs), or requests for qualifications (RFQs) for convenience only and does not serve as an official public notice. Individuals who wish to respond to or inquire about bids, RFPs, or RFQs should contact the relevant government department directly.