Sam Gordy's Slough Dredging and Habitat Project

Agency: State Government of Wisconsin
State: Wisconsin
Type of Government: State & Local
NAICS Category:
  • 237990 - Other Heavy and Civil Engineering Construction
Posted Date: Feb 12, 2025
Due Date: Mar 11, 2025
Solicitation No: 25-500-20
Original Source: Please Login to View Page
Contact information: Please Login to View Page
Bid Documents: Please Login to View Page
Solicitation Reference #: 25-500-20
Title: Sam Gordy's Slough Dredging and Habitat Project
Available Date: 2/12/2025
Due Date: 3/11/2025 2:00:00 PM
Bid Synopsis: All referenced figures can be found in the attached Narrative file, found in the supplementary documents section.
Mississippi River backwaters within Pool 6 are currently a high priority resource for WI DNR due to a general lack of deep, backwater habitat within the pool (Figure 2). Recent flood and high discharge conditions have resulted in declining water quality conditions due to an influx of channel sand into the main inlet to the complex. The channel inlet at RM 624.5 is currently blocked by sediment during normal and low flow conditions. This channel flows under a bridge into the middle of the complex during above normal river stages and can have a positive influence on WQ conditions in deeper water located along the tracks in the lower portion of the complex when flow is present. However, reduced flow delivery to the system results in periods when winter water quality conditions are outside temperature and dissolved oxygen ranges required for overwintering backwater fish communities. Recent surveys conducted under near-median discharge conditions indicated widespread hypoxia in the complex (Figure 3). Fish kills in Sam Gordy’s Slough are likely to occur in the coming years if no action is taken.
Water Quality monitoring conducted by the WI DNR identifies hydraulic connectivity as the primary water quality driver in Sam Gordy’s Slough. A detailed rating curve has been developed for inflows into Sam Gordy’s Slough (Figure 4). When main channel water input to the slough is low, dissolved oxygen declines precipitously. A low-cost project to optimize multi-season connectivity (summer and winter) will produce substantial water quality and ecological benefits within this complex.
An optional site visit is scheduled for February 27, 2025 at 12:30PM. Questions from vendors are due February 28, 2025 at 4:30 PM and the bids are due by March 11, 2025 at 2:00 PM.
Agency Contact: Konrad Plachetta,

Phone: 608-400-9460
eSupplier: https://esupplier.wi.gov
* Disclaimer: This website provides information about bids, requests for proposals (RFPs), or requests for qualifications (RFQs) for convenience only and does not serve as an official public notice. Individuals who wish to respond to or inquire about bids, RFPs, or RFQs should contact the relevant government department directly.

Sign-up for a Free Trial, Government Bid Alerts

With Free Trial, you can:

You will have a full access to bids, website, and receive daily bid report via email and web.

Try One Week FREE Now

See Also

Solicitation Reference #: 10294538 Title: Well Facility #12 Available Date: 7/24/2026 Due Date:

State Government of Wisconsin

Bid Due: 8/11/2026

Sennett Middle School (Ref 2024 - New Building Construction) Bid Pack 1 |

Madison Metropolitan School District

Bid Due: 7/29/2026

CONTRACT NUMBER: 9782 CONTRACT: South Point Public Works Facility Percentage of Contract Completed:

City of Madison

Bid Due: 8/27/2026

Cherokee Heights Middle School (Ref 2024 - New Building Construction) Bid Pack 1

Madison Metropolitan School District

Bid Due: 7/29/2026