Salt Lake Aqueduct Replacement Reaches 2 and 3 Project Scoping

Agency: City of West Valley City
State: Utah
Type of Government: State & Local
NAICS Category:
  • 236220 - Commercial and Institutional Building Construction
  • 237990 - Other Heavy and Civil Engineering Construction
Posted Date: Apr 4, 2025
Due Date: Apr 15, 2025
Solicitation No: SA063
Original Source: Please Login to View Page
Contact information: Please Login to View Page
Bid Documents: Please Login to View Page

Description

Project: Salt Lake Aqueduct Replacement Reaches 2 and 3 Project Scoping
Ref. #: SA063
Department: SPECIAL SERVICE DISTRICTS - Metropolitan Water District of Salt Lake & Sandy
Type: RFSQ
Status:
Open
Open Date: Mar 27th 2025, 1:00 PM MDT
Questions Due Date: Apr 8th 2025, 2:00 PM MDT
Close Date: Apr 15th 2025, 2:00 PM MDT

Project Description: As the first step to addressing the finished water reach of the SLA, Metro Water is currently engaged in the construction of the Salt Lake Aqueduct Replacement (SLAR) Reach 1 – a 72”, 66”, and 60” diameter welded steel pipeline from the Little Cottonwood Water Treatment Plant (LCWTP) to Fort Union Boulevard (approximately 7000 South). Despite its name, the SLAR is not intended to outright replace the SLA, but to provide resiliency, reliability, and redundancy for Metro Water and its member cities. The SLAR Reach 1 is also connected to Salt Lake City’s Big Cottonwood Water Treatment Plant through the 36” diameter Cottonwoods Connector Reach 1.
Metro Water is also engaged in an effort to address the seismic resiliency of the SLA. This project – called the Salt Lake Aqueduct Hardening – considers a combination of replacement and sliplining the SLA. The SLA Hardening project will affect the hydraulic capacity of the SLA.
To better plan for the timing, finances, and staffing of these and other projects, Metro Water desires to study the SLAR Reaches 2 and 3.


Get Government Bids Like This by Email Receive daily bid alerts that match your keywords, business categories, and target regions.

See Also

Project: DFCM Construction - Prequalified Mechanical Stage II - Uintah Basin Technical College

State Government of Utah

Due by 10/06/2026

Project: DFCM Construction - Prequalified Electrical Stage II - Administrative Office of the

State Government of Utah

Due by 10/07/2026

Project: DFCM Construction - Prequalified General Stage II - DOC - CUCF Monroe

State Government of Utah

Due by 10/21/2026

Project: Natural Surface Trail Construction Ref. #: DF26-34 Department: COUNTIES - Tooele County

State Government of Utah

Due by 10/02/2026

* Disclaimer: This website provides information about bids, requests for proposals (RFPs), or requests for qualifications (RFQs) for convenience only and does not serve as an official public notice. Individuals who wish to respond to or inquire about bids, RFPs, or RFQs should contact the relevant government department directly.