Salt Lake Aqueduct Replacement Reaches 2 and 3 Project Scoping
| Agency: | State Government of Utah |
|---|---|
| State: | Utah |
| Type of Government: | State & Local |
| NAICS Category: |
|
| Posted Date: | Mar 27, 2025 |
| Due Date: | Apr 15, 2025 |
| Solicitation No: | SA063 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
Project Description: As the first step to addressing the finished water reach of the SLA, Metro Water is currently engaged in the construction of the Salt Lake Aqueduct Replacement (SLAR) Reach 1 – a 72”, 66”, and 60” diameter welded steel pipeline from the Little Cottonwood Water Treatment Plant (LCWTP) to Fort Union Boulevard (approximately 7000 South). Despite its name, the SLAR is not intended to outright replace the SLA, but to provide resiliency, reliability, and redundancy for Metro Water and its member cities. The SLAR Reach 1 is also connected to Salt Lake City’s Big Cottonwood Water Treatment Plant through the 36” diameter Cottonwoods Connector Reach 1.
Metro Water is also engaged in an effort to address the seismic resiliency of the SLA. This project – called the Salt Lake Aqueduct Hardening – considers a combination of replacement and sliplining the SLA. The SLA Hardening project will affect the hydraulic capacity of the SLA.
To better plan for the timing, finances, and staffing of these and other projects, Metro Water desires to study the SLAR Reaches 2 and 3.
See Also
Project: DFCM Construction - Prequalified Mechanical Stage II - Uintah Basin Technical College
State Government of Utah
Due by 10/06/2026
Project: DFCM Construction - Prequalified Mechanical Stage II - Utah Schools for the
State Government of Utah
Due by 10/01/2026
Project: DFCM Construction - Prequalified Electrical Stage II - Administrative Office of the
State Government of Utah
Due by 10/07/2026
Project: DFCM Construction - Prequalified General Stage II - DOC - CUCF Monroe
State Government of Utah
Due by 10/21/2026