S222--600 | Metal Recycling | POP 2026-2031
| Agency: | VETERANS AFFAIRS, DEPARTMENT OF |
|---|---|
| State: | Federal |
| Type of Government: | Federal |
| FSC Category: |
|
| NAICS Category: |
|
| Posted Date: | Aug 11, 2026 |
| Due Date: | Aug 14, 2026 |
| Solicitation No: | 36C26226Q0908 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
- Contract Opportunity Type: Combined Synopsis/Solicitation (Updated)
- Updated Published Date: Aug 11, 2026 10:35 am PDT
- Original Published Date: Jul 30, 2026 10:23 am PDT
- Updated Date Offers Due: Aug 14, 2026 12:00 pm PDT
- Original Date Offers Due: Aug 14, 2026 12:00 pm PDT
- Inactive Policy: Manual
- Updated Inactive Date: Oct 13, 2026
- Original Inactive Date: Nov 21, 2026
-
Initiative:
- None
- Original Set Aside:
- Product Service Code: S222 - HOUSEKEEPING- WASTE TREATMENT/STORAGE
-
NAICS Code:
- 562111 - Solid Waste Collection
-
Place of Performance:
Department of Veterans Affairs Long , 90822-5201USA
RFQ 36C26226Q0908 Scrap Metal Recycling
Question 1: Pricing Structure (Section B.2 / SOW Section 8(4)): Section B.2 requests a unit price for "Collection, transport and disposition of scrap and miscellaneous metal," suggesting a service fee to be paid by the VA. However, SOW Section 8(4) states that "payments for recycled scrap metal shall be submitted along with weight tickets and disposal receipts to the POC within three days of pick-up," with checks payable to the VA. Please clarify:
Question 1.a.: Is the unit price requested in Section B.2 intended to represent a service fee paid by the VA to the Contractor, a value paid by the Contractor to the VA for the recycled material, or a net figure combining both?
Answer: The receipt is to identify the weight of scrap metal being picked up by the vendor and the amount paid by the vendor to the VA.
Question 1.b.: How should offerors structure their pricing in Section B.2 to properly reflect both the service cost and the recycling value of the scrap metal?
Answer: Separate documents will be needed to indicate itemized service cost to be invoiced and recycling value to be paid to the VA. Receipt of recycling value will be separated per bin, list weight collected, and value per weight.
Question 2: ISO Certification Requirement: Section E.1 (Special Certification) and Section E.3 (Evaluation) both require offerors to submit documentation for ISO 9001, ISO 14001, ISO 45001, and ISO 27001 certifications with their bid submittal. Given that ISO 27001 (Information Security Management) does not appear directly relevant to scrap metal collection and disposal services, could you please confirm whether all four certifications are required as written, or whether this list was carried over from a different solicitation in error?
Answer: Yes, ISO 27001 was inserted in error. This requirement is not required for the requirement.
Question 3: Is this a brand-new contract, if not brand new, please provide the current / previous contract number and what the total contract value was?
Answer: Incumbent is SA Recycling Inc.; please visit SAM.gov for details.
Question 4: The SOW does not state a bin quantity. Please confirm two (2) bins are required; one at east side of Bldg. 149 and one at south side of Bldg. 7. Are both bins always kept on-site?
Answer: Two bins are required for this request. One at east side of Bldg. 149 and one at south side of Bldg. 7, both always kept on-site.
Question 5: The SOW lists bin size as 40'. Please confirm the container type and capacity (40-cubic-yard roll-off vs. 40-foot trailer or other).
Answer: 40-cubic-yard roll-off
Question 6: What's the estimated tonnage or weight per pickup for each bin?
Answer: Estimated average 9,000 lbs. per pickup for both bins combined.
Due Date for Responses: August 14, 2026, by Noon PST.
- 335 E. German Rd SUITE 301
- Gilbert , AZ 85297
- USA
- Naomi Meza
- naomi.meza@va.gov
- Phone Number (520) 792-1450 x 13785
- Aug 11, 2026 10:35 am PDTCombined Synopsis/Solicitation (Updated)
- Jul 30, 2026 10:23 am PDT Combined Synopsis/Solicitation (Original)
Related Document
| Jul 30, 2026 | [Combined Synopsis/Solicitation (Original)] S222--600 | Metal Recycling | 2026-2031 |
See Also
Follow S--NOTICE OF INTENT TO SOLE SOURCE FOR REFUSE SERVICE Active Contract Opportunity
INTERIOR, DEPARTMENT OF THE
Follow S--Janitorial Services for the Crow Agency Active Contract Opportunity Notice ID 140A0426Q0016
INTERIOR, DEPARTMENT OF THE
Due by 10/09/2026
Follow Snow Removal Services, Westville Lake, Southbridge, MA Active Contract Opportunity Notice ID
DEPT OF DEFENSE
Due by 10/06/2026
Follow CHESAPEAKE & OHIO CANAL NATIONAL HISTORICAL PARK - Active Contract Opportunity Notice
INTERIOR, DEPARTMENT OF THE
Due by 9/22/2026