RWP Independent Air Supply
| Agency: | DEPT OF DEFENSE |
|---|---|
| State: | Tennessee |
| Type of Government: | Federal |
| FSC Category: |
|
| NAICS Category: |
|
| Posted Date: | Aug 18, 2026 |
| Due Date: | Sep 18, 2026 |
| Solicitation No: | FA9101269IAS |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
- Contract Opportunity Type: Presolicitation (Original)
- Original Published Date: Aug 18, 2026 03:17 pm CDT
- Original Response Date: Sep 18, 2026 02:00 pm CDT
- Inactive Policy: 15 days after response date
- Original Inactive Date: Oct 03, 2026
-
Initiative:
- None
- Original Set Aside:
- Product Service Code: 4310 - COMPRESSORS AND VACUUM PUMPS
-
NAICS Code:
- 541330 - Engineering Services
-
Place of Performance:
, TN 37389USA
Request for White Papers
Project Title: Independent Air Supply
Authority: 10 U.S.C. § 4022
Primary NAICS Code: 541330 — Engineering Services (Military and Aerospace Equipment)
Primary PSC Code: 4310 — Compressors and Vacuum Pumps
Arnold Engineering Development Complex (AEDC) at Arnold AFB, TN, is issuing this Request for Whitepapers (RWP) through the AEDC Velocity Alliance Consortium and SAM.gov. The strategic objective of this project is to establish an independent, secondary, and dedicated conditioned air supply to an existing test cell.
The scope of this project encompasses all design, analysis, procurement, documentation, fabrication, installation, inspection, demonstration, and testing necessary to provide a complete and functional pressure and temperature-controlled air supply to the test cell.
The Government reserves the right to award up to two prototype agreements for the initial proof of concept milestones (1-3).
Note to interested parties: Some documents in this posting are labeled Distribution D and export controlled. For access to these requirements, contact the Contracting/Agreements Officer with your company's CAGE. Once Joint Certification Program and CMMC status are verified, the documents will be sent via DoD SAFE.
- ADMIN ONLY NO REQTN CP 931 454 7841 100 KINDEL DR STE A332
- ARNOLD AFB , TN 37389-1332
- USA
- Haley Smith
- haley.smith.10@us.af.mil
- Paytonne Szatkowski
- paytonne.szatkowski@us.af.mil
- Aug 18, 2026 03:17 pm CDTPresolicitation (Original)
- May 02, 2026 10:55 pm CDT Sources Sought (Updated)
Related Document
| Sep 8, 2026 | [Presolicitation (Updated)] RWP Independent Air Supply |
See Also
Bid Title: Miles Johnson Water Booster Station Pump Addition Category: Construction Projects Status:
Spring Hill city
Due by 11/10/2026