Runway Pavement Rehabilitation at the Billy Mitchell Airport (HES) in Dare County for the NCDOT Division of Aviation Addendum 1

Agency: Division of Highways
State: North Carolina
Type of Government: State & Local
NAICS Category:
  • 237310 - Highway, Street, and Bridge Construction
  • 238990 - All Other Specialty Trade Contractors
Posted Date: Jun 15, 2026
Due Date: Jun 17, 2026
Original Source: Please Login to View Page
Contact information: Please Login to View Page
Bid Documents: Please Login to View Page

Description

Attachment Preview

JOSH STEIN
GOVERNOR
STATE OF NORTH CAROLINA
DEPARTMENT OF TRANSPORTATION
DANIEL H. JOHNSON
SECRETARY
ADDENDUM NO. 1
June 10, 2026
Contract No.
TIP No.:
Federal Aid No.:
WBS Element:
County:
Description:
Letting Date:
DA00681
N/A
State Funded
36244.73.1.1
Dare
Runway Pavement Rehabilitation at the Billy Mitchell Airport (HES)
June 17, 2026
To Whom It May Concern:
This Addendum is issued to modify or clarify the bid documents previously furnished for the
above-referenced project. The following changes shall be incorporated into the contract
documents:
In response to questions during the pre-bid meeting, and to ensure consistent information for all
parties, we have listed the inquiries and answers below.
Questions:
1) Can more time be allotted for the bid option due to crack seal time frame?
Answer: The contract time will remain as defined in the contract documents. If the
contractor experiences delays to the project due to circumstances outside of their
contract, including delays associated with the crack seal, the contractor shall not be
penalized for those delays. It shall be the contractor's responsibility to document those
delays in writing to the project representative during and immediately after the delay.
2) How will payment for patching with ABC be handled for the removal of tie downs by
contractor?
Answer: Cost of stone or other approved method for replacing/repairing the stone at the
area for the tie down removal shall be considered incidental to the tie down removal.
Mailing Address:
NC DEPARTMENT OF TRANSPORTATION
DIVISION OF HIGHWAYS DIVISION 1
113 AIRPORT DIVE, SUITE 100
EDENTON, NC 27932
Telephone: (252) 482-1850
Fax: (252) 482-8722
Customer Service: 1-877-368-4968
Website: www.ncdot.gov
Location:
113 AIRPORT DRIVE, SUITE 100
EDENTON, NC 27932
DA00681 Addendum #1
3) At what depth should the subgrade stabilization, if required, be for estimating purposes?
Answer: If the underlying material is deemed not suitable then the Contractor shall
stabilize the subgrade per Type I subgrade stabilization as outlined in Section 505 of the
2024 NCDOT SSRS. Per Section 505 of the 2024 NCDOT SSRS, Type 1 A 6- to 24-
inch-thick aggregate subgrade with Class IV subgrade stabilization compacted to 92% of
AASHTO T 180 as modified by the Department or to the highest density that can be
reasonably obtained.
4) How will contract time be addressed if something happens outside of the contractors’
control?
Answer: See Answer to Question 1.
5) What is the depth of the existing asphalt section?
Answer: 3.5” - 6” on the runway.
6) Is funding already secured for this project?
Answer: Yes.
7) Do the joints for the paved areas need cut back?
Answer: All joints left exposed for more than four (4) hours, or the surface temp has
cooled to less than 1750F must be cut back a max of 3”.
8) Is a shuttle buggy or MTV required for this project?
Answer: Yes
9) What methods can be used for the tie down removal and will they need to be salvaged.
Answer: Tie downs can be removed six inches below bottom of stone by cutting or
grinding and leaving the anchor in place. The tie downs do not need to be salvaged.
10) What are the work restrictions for the project?
Answer: Work can be seven (7) days a week, sunrise to sunset.
Other Notes from the Pre-bid Meeting:
Closure markers are provided by NPS. Airport to be closed throughout the duration of the
project. Contractor to monitor CTAF.
Airport gate is to remain closed and locked when not in use. Contractor to be responsible
for security while onsite. If you see something, the contractor should notify the appropriate
parties. Contractor to contact 911 or emergency services for emergencies.
NOTAMs are to be coordinated and issued by NPS.
Page 2 of 3
DA00681 Addendum #1
All other terms and conditions of the original bidding documents remain unchanged.
Sincerely,
Mark S. Winslow
Division Contract Engineer
cc: R. K. Sawyer, PE
M. B. Gill, PE
B. N. Braswell, PE
D. B. Otts, PE
C. A. Spear, PE
J. B. Schronce
K. I. Long
Page 3 of 3
This page summarizes the opportunity, including an overview and a preview of the attached documents.
Get Government Bids Like This by Email Receive daily bid alerts that match your keywords, business categories, and target regions.

See Also

Bid Opportunity: W. Stinson Street Sewer Replacement Pre-Bid Meeting: Non-Mandatory: September 3, 2026

Carrboro OWASA (Water and Sewer Authority)

Due by 9/21/2026

Solicitation Number: 194-210-RFP_HCHS Project Title: 210-RFP-HCHS- Stair Removal and Replacement Description: Request for

State Government of North Carolina

Due by 9/28/2026

Follow Atlantic Intracoastal Waterway Maintenance Dredging Active Contract Opportunity Notice ID GROUP1-24-R-W001 Related

DEPT OF DEFENSE

Due by 10/05/2026

Bid Number: IF2745 Bid Title: Barbara Jane Avenue Sidewalk Project Category: Informal Bids

City of Winston-Salem

Due by 9/24/2026

* Disclaimer: This website provides information about bids, requests for proposals (RFPs), or requests for qualifications (RFQs) for convenience only and does not serve as an official public notice. Individuals who wish to respond to or inquire about bids, RFPs, or RFQs should contact the relevant government department directly.