RTU HVAC Replacements at Edgewood and Lincoln Bassett Schools-NHPS
| Agency: | State Government of Connecticut |
|---|---|
| State: | Connecticut |
| Type of Government: | State & Local |
| NAICS Category: |
|
| Posted Date: | Aug 19, 2025 |
| Due Date: | Sep 2, 2025 |
| Solicitation No: | 31957 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
The project consists of the turn-key replacement of fifteen (15) HVAC units, nine (9) at Edgewood School and six (6) at Lincoln Bassett School. Most are Roof Top Units (RTUs), some are Remote Condenser Units (RCUs) with section coils in nearby Air Handler Units (AHUs). The project will be design-build with "like-for-like" replacements. If like-for-like replacements are not available, a compatible solution must be proposed. Drawings and submittals must satisfy permitting and Connecticut Administrative Services requirements. The scope includes, but not limited to - removal and disposal, furnish and install, permitting, rigging, controls integration, and engineered drawings as applicable. Since work will occur when buildings are occupied, careful coordination will be required - including after school dismissal arrangements. All work must be completed and invoiced by December 19, 2025.
Shawn Garris 200 Orange Street New Haven CT, 06510 United States Tel: 203-946-8202 Fax: sgarris@newhavenct.gov
See Also
Follow Boiler Maintenance & Repair Active Contract Opportunity Notice ID N4008526R0173 Related Notice
DEPT OF DEFENSE
Due by 9/24/2026
Route 82 Water Main Lining Project Description The work required under this contract
State Government of Connecticut
Due by 9/30/2026
Follow Boiler Maintenance & Repair Active Contract Opportunity Notice ID N4008526R0173 Related Notice
DEPT OF DEFENSE
Due by 9/24/2026
Seymour No. 4 Dam Improvements Replace the existing spillway with a concrete drop
State Government of Connecticut
Due by 10/06/2026