Agency: | DEPT OF DEFENSE |
---|---|
State: | Kentucky |
Type of Government: | Federal |
FSC Category: |
|
NAICS Category: |
|
Posted Date: | Apr 12, 2024 |
Due Date: | Apr 29, 2024 |
Solicitation No: | W912QR24BRRDM |
Bid Source: | Please Login to View Page |
Contact information: | Please Login to View Page |
Bid Documents: | Please Login to View Page |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
Rough River Dam Safety Modification Phase 2: New Outlet Works and Cutoff Wall Project
A market survey is being conducted to determine if there are a reasonable number of interested small business concerns to set this future project aside for them. If your firm is a Small Business, certified HUBZone, 8A, Woman-Owned Small Business or Service-Disabled Veteran Owned Business and you are interested in this project please respond appropriately. If interested in subcontracting opportunities rather than performing as the Prime Contractor on this procurement, please be sure to identify the feature(s) of work you are interested in and your socio-economic category (small business, veteran-owned small business, service-disabled veteran owned small business, HUBZone small business, small-disadvantaged business, and women-owned small business).
Project Location: Rough River Dam; Falls of Rough, KY; Grayson County/Breckinridge County
Project Description: The Rough River Dam Safety Modification Phase II Project includes the construction of a new left abutment outlet works in order to facilitate cutoff wall construction. Completion of the new outlet works must require a new approach channel, control tower, service bridge, outlet conduit tunnel, stilling basin, and retreat channel along with commissioning of the new control tower. Completion of the cutoff wall requires abandonment of the existing right abutment outlet works, construction of a work platform, slurry control grouting, construction of a cutoff wall into the dam foundation and through the existing outlet conduit, abandonment of the existing control tower, backfilling the existing retreat channel, instrumentation installation/relocations, and relocation of Highway 79 back to the dam crest.
Construction duration is estimated at 2,190 calendar days. The estimated cost rage is between $250,000,000.00 and $500,000,000.00. NAICS code is 237990 All interested Small Business, certified HUBZONE, 8(a), Women-Owned Small Businesses or Service-Disabled Veteran Owned Small Business contractors should respond to this survey by email on
Responses should include:
Projects similar in size and scope to this project include:
Based on definitions above, for each project submitted should include:
Small Business are reminded under FAR 52.219-14, Limitations on Subcontracting; they must perform 15% of the cost of the contract, not including the cost of materials, with the firm’s own employees for general construction-type procurement. Include the percentage of work that will be self-performed on the project, and how it will be accomplished.
NOTE: Total submittal package shall be no longer than 8 pages. Please only include a narrative of the requested information; additional information will not be reviewed.
Email responses and any questions to Andrew.J.Fleming@usace.army.mil. This is NOT a Request for Proposal and does not constitute any commitment by the Government. Responses to this sources sought notice will be used by the Government to make appropriate acquisition decisions. All interested sources must respond to future solicitation announcements separately from responses to this market survey.
NOTICE: The following information is provided for situational awareness and is not required to respond to this Sources Sought.
All contractors must be registered in the System for Award Management (www.SAM.gov) prior to award of a contract. All proposed contractors are highly encouraged to review FAR Clause 52.232-33 Payments by Electronic Funds Transfer – System for Award Management, which indicated “All payments by the Government under this contract shall be made by electronic funds transfer (EFT).” Those not currently registered can obtain registration by going to the website hhtp://www.SAM.gov. The process can usually be completed from 24 to 48 after submission. Contractors will need to obtain a Unique Entity Identifier (formerly DUNS number) for processing their registration. If you do not already have a Unique Entity Identifier, one can be obtained from hhtp://www.SAM.gov. Refer to www.SAM.gov for information formerly found in CCR, EPLS, ORCA, and FedReg.
Please begin the registration process immediately in order to avoid delay of the contract award should your firm be selected.
ALERT: You must submit a notarized letter appointing the authorized Entity Administrator before registration will be activated. This requirement now applies to both new and existing entities. Effective 29 April 2018, the notarized letter process is now mandatory on all CURRENT registrants at SAM who have a requirement to update data on their SAM record. The notarized letter is mandatory and is required before the GSA Federal Service Desk (FSD) will activate the entity's registration.
Effective 29 June 2018, vendors creating or updating their registration can have their registration activated prior to the approval of the required notarized letter. However, the signed copy of the notarized letter must be sent to the GSA Federal Service Desk (FSD) within 30 days of activation or the vendor risks no longer being active in SAM.
Vendors can check whether an account is active by performing a query by their CAGE or Unique Entity Identifier (known as DUNS). The new registration process may now take several weeks, so vendors are highly encouraged to begin registering as soon as possible to avoid any possible delays in future contract awards. Remember, there is no cost to use SAM.
To find out additional information about the changes of the SAM registration process, contractors should visit the Frequently Asked Questions (FAQ) link located at the top of the SAM homepage (www.sam.gov).
Apr 22, 2024 | [Sources Sought (Updated)] Rough River Dam Safety Modification Phase 2: New Outlet Works and Cutoff Wall Project |
With Free Trial, you can:
You will have a full access to bids, website, and receive daily bid report via email and web.
Description Department/Buyer Solicitation Number / Type / Category Closing Date and Time/Status RFB-240-24
State Government of Kentucky
Bid Due: 5/09/2024
CCK-2557.0-1-24 Good Samaritan Hospital Emergency Generator Upgrade Pre-Bid: 5-1-24 Written Questions: 5-6-24 5-16-24
UNIVERSITY OF KENTUCKY
Bid Due: 5/01/2024
Description Department/Buyer Solicitation Number / Type / Category Closing Date and Time/Status RFB-236-24
State Government of Kentucky
Bid Due: 5/03/2024
Description Department/Buyer Solicitation Number / Type / Category Closing Date and Time/Status RFB-234-24
State Government of Kentucky
Bid Due: 5/01/2024