Rotating Drum Replacement Project

Agency: The New York State Contract Reporter
State: New York
Type of Government: State & Local
NAICS Category:
  • 236220 - Commercial and Institutional Building Construction
Posted Date: Oct 25, 2024
Due Date: Nov 22, 2024
Original Source: Please Login to View Page
Contact information: Please Login to View Page
Bid Documents: Please Login to View Page

Description

Issue Date: 10/25/2024 Contract Number: Prop SW3-24
Rotating Drum Replacement Project
Description:

The items of work include, but are not necessarily limited to the following:
Contract No.1 – General Construction: This work shall include providing all
shipping, labor, materials, machinery, tools, equipment, and other means of
construction necessary and incidental to the completion of the Rotating Drum
Replacement. The project includes the work shown on the Plans, and described in
the Specifications consisting of general construction. General construction
includes, but is not limited to, all work necessary for the removal and replacement
of the existing steel drum Rotating Drum and accessories with new as shown on
the Plans, and as specified, and shall consider use of the following existing
Rotating Drum equipment and parts for operation of the new replacement
Rotating Drum. The cost of any equipment, material, and labor necessary for the
removal and re-installation of the following existing equipment and parts shall be
included in the general construction work:
1. Ring gear
2. Roller bands (tires)
3. Electric drive motor
4. Transmission cooling system
5. Transmission
6. Pinion gear/shaft/pillow blocks
7. Trunnions/trunnion wheels and retainer rollers
8. Steel framed grillage support of equipment items 1 Thru 7
9. Existing Rotating Drum foundations
10. Hydraulic gate control – terminal adaptor/contacts - copper conductor
plates and accessories
Any metals scheduled to be removed and/or damaged during construction may be
handed over to the Owner for disposal. The Owner will direct the Contractor
where on site to stockpile said material.

Contract No. 2 – Electrical Construction: This work shall include providing all
labor, materials, machinery, tools, equipment, and other means of construction
necessary and incidental to the completion of the Rotating Drum Replacement.
The project includes the work shown on the Plans, and described in the
Specifications consisting of electrical construction. Electrical construction
includes, but is not limited to, all work necessary for temporary removal of
electrical equipment, devices, cable tray, and circuiting in the project area limits
of construction. All removed electrical equipment and devices are to be stored
and placed back in operation at project completion. New circuiting including
conduit, wiring, and junction boxes are required to complete the work. The
equipment and devices to be removed and replaced include lighting, emergency
stops, receptacles, control circuiting, and fire alarm.

Due Date: 11/22/2024 2:00 PM

Contract Term: 245 calendar days from notice to proceed

Location: 32230 State Hwy 10, Walton, NY 13856

Ad Type: General

Technical contact: Barton & Loguidice


David Mitchell
Chief Engineer
443 Electronics Parkway
Liverpool, NY 13088
United States
Ph: 315-457-5200
Fax:
dmitchell@bartonandloguidice.com
Primary Contact: Delaware County
Public Works

Tyson Robb
Solid Waste Coordinator
P.O. Box 311
2 Bridge Street
Delhi, NY 13753
United States
Ph: 607-832-5828
Fax: 607-832-6071
tyson.robb@co.delaware.ny.us
Secondary contact: Delaware County
Public Works

Lisa Henderson
Asst. to the Commissioner
P.O. Box 311
2 Bridge Street
Delhi, NY 13753
United States
Ph: 607-832-5800 ext.5821
Fax: 607-832-6071
dpw@co.delaware.ny.us
Get Government Bids Like This by Email Receive daily bid alerts that match your keywords, business categories, and target regions.

See Also

Bid Number: RFP 2025-15 Bid Title: RFP 2025-15 Purchase of 96 4th St

City of Albany

Due by 11/27/2026

Title: Emergency Sewer Work Procurement Section Design and Construction (DDC) Agency Name .

The City of New York

Due by 12/31/2040

SBU/ RRAMP LAB (Interior Fit Out, Elevator and Structural Package) SBU/ RRAMP LAB

State University of New York

Due by 10/09/2026

18 Title: 38 Catherine St , Interior Renovations, Schuyler Mansion State Historic Site

The New York State Contract Reporter

Due by 9/24/2026

* Disclaimer: This website provides information about bids, requests for proposals (RFPs), or requests for qualifications (RFQs) for convenience only and does not serve as an official public notice. Individuals who wish to respond to or inquire about bids, RFPs, or RFQs should contact the relevant government department directly.