Rood Hall Bus Stop Site Improvements
| Agency: | City of Kalamazoo |
|---|---|
| State: | Michigan |
| Type of Government: | State & Local |
| NAICS Category: |
|
| Posted Date: | Jun 25, 2026 |
| Due Date: | Jul 16, 2026 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
Closing date
July 16, 2026, 03:30 PM
- Reference number 91244-053.0
- Status Open
- Summary Complete in a professional manner the ROOD HALL BUS STOP SITE IMPROVEMENTS, per specifications and plans. The Scope of the work is to construct the new Rood Hall Bus Stop on the Western Michigan University Campus for METRO Transit.
91244-053.0-bid document (PDF, 4MB)
91244-053.0-Attachment A: Plans (PDF, 2MB)
91244-053.0-Attachment-B: Specifications (PDF, 816KB)
91244-053.0-Attachment C (PDF, 211KB)
91244-053.0-distribution list (PDF, 110KB)
SCOPE OF WORK
Complete in a professional manner the ROOD HALL BUS STOP SITE IMPROVEMENTS, per specifications and plans. The Scope of the work is to construct the new Rood Hall Bus Stop on the Western Michigan University Campus for METRO Transit.
The project work includes the removal of the existing concrete bus pads, which currently house three bus shelters. Note that the bus shelters and the benches will be removed by others in advance of this construction project. The project includes grading the area to place a granular material subbase surface to prepare the area for concrete. The Contractor will place the foundations for the bus shelters and bike shelter. The Contractor will place the concrete pad to receive the bus and bike shelters. The Contractor will place soil erosion and sediment control as required and will restore the topsoil and establish turf in the disturbed areas.
Areas noted on Phase 2 will be included in the work if funding permits.
Phase 2 areas are shown for information only. Phase 2 areas may be added or may be a part of a future project. Phase 2 areas include similar work as noted above. Phase 2 work includes the removal of the turf and mulch surface. The Phase 2 project includes grading the area to place a granular material subbase surface to prepare the area for concrete. Place the Phase 2 area concrete sidewalk.
These Specifications
• Attachment A&B –
Western Michigan University
Rood Hall Bus Stop Site Improvements
KALAMAZOO, MICHIGAN 49008
SECTION 20, T01S, R11W
2101 WILBUR STREET
TIMELINE
The project must be completed by: 25 days after Notice to Proceed. If you cannot meet this deadline, please fill out the “Statement of No Bid” form included in this packet, stating this as the reason.
See Also
General Information Document ID RFP-PPP-260000002639-1 Status Open Description Reconstruction of MS Tennis Courts
State of Michigan
Due by 10/01/2026
Fire Station 4 Trench Drain Replacement and Floor Restoration 1 document Fire Station
Orion charter township
Due by 10/13/2026
General Information Document ID RFP-KSD-260000002546-1 Status Open Description Kent ISD - KCTC Mechanical
State of Michigan
Due by 9/22/2026
General Information Document ID RFP-MASO-260000002613-1 Status Open Description High School Roof Replacement Department
State of Michigan
Due by 10/08/2026