Rogue River South Jetty Partial Repair 2025
| Agency: | DEPT OF DEFENSE |
|---|---|
| State: | Federal |
| Type of Government: | Federal |
| FSC Category: |
|
| NAICS Category: |
|
| Posted Date: | Apr 15, 2025 |
| Due Date: | May 4, 2025 |
| Solicitation No: | PANNWD2002246 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
- Contract Opportunity Type: Sources Sought (Updated)
- Updated Published Date: Apr 15, 2025 11:25 am EDT
- Original Published Date: Apr 14, 2025 03:19 pm EDT
- Updated Response Date: May 04, 2025 03:00 pm EDT
- Original Response Date: May 04, 2025 03:00 pm EDT
- Inactive Policy: 15 days after response date
- Updated Inactive Date: May 19, 2025
- Original Inactive Date: May 19, 2025
-
Initiative:
- None
- Original Set Aside:
- Product Service Code: Z2KZ - REPAIR OR ALTERATION OF OTHER CONSERVATION AND DEVELOPMENT FACILITIES
-
NAICS Code:
- 237990 - Other Heavy and Civil Engineering Construction
-
Place of Performance:
Golden BeachUSA
The project is located on the Southern Oregon Coast at the inlet to Rogue River in Gold Beach, Curry County, Oregon. The project consists of procurement, delivery, and placement of jetty armor stone between stations 7+10 and 10+80. The mandatory work includes toe and side slope repairs to address a channel-side damage zone from 8+20 to 9+80 with a 50-foot buffer on either side for a total construction length of approximately 260 ft. Optional repairs include an additional 60 ft of repair from 7+60 to 8+20 and reworking the jetty from 9+80 to 10+30. Due to apparent instability of the core and lack of interlocking on the south side of the cross-section, rework and/or reconstruction of the full cross-section may be needed along at least a partial length of the mandatory repair zone. To accomplish that effectively, the toe of the jetty on the south side may need to be excavated and the stone/cross-section reset. Design stone W50 is 18 tons, with a minimum density of 170 pcf. The repair work is expected to be carried out between August 2025 and January 2026.
- KO CONTRACTING DIVISION 333 SW FIRST AVE
- PORTLAND , OR 97204-3495
- USA
- Christopher Burroughs
- christopher.d.burroughs@usace.army.mil
- Brian Johnson
- brian.m.johnson@usace.army.mil
- Phone Number 5039958330
- Apr 15, 2025 11:25 am EDTSources Sought (Updated)
- Apr 14, 2025 03:19 pm EDT Sources Sought (Original)
Related Document
| Apr 14, 2025 | [Sources Sought (Original)] Rogue River South Jetty Partial Repair 2025 |
| Apr 23, 2025 | [Sources Sought (Updated)] Rogue River South Jetty Partial Repair 2025 |
See Also
Follow Z--REPLACE PHYSICAL SECURITY ALARM SYSTEM Active Contract Opportunity Notice ID 140P6326B0010 Related
INTERIOR, DEPARTMENT OF THE
Follow Fuel Tank Inspection, Test and Maintenance Service at Osan AB, Korea Active
DEPT OF DEFENSE
Due by 10/07/2026
Follow Z--GOGA 336173 - Repair Conzelman Road Active Contract Opportunity Notice ID 140P2026R0106
INTERIOR, DEPARTMENT OF THE
Due by 10/29/2026
Follow SPD-AF Fuels Maintenance and Repair Active Contract Opportunity Notice ID W912DY26RA006 Related
DEPT OF DEFENSE
Due by 9/24/2026