Rock Creek Road Maintenance
| Agency: | AGRICULTURE, DEPARTMENT OF |
|---|---|
| State: | New Mexico |
| Type of Government: | Federal |
| FSC Category: |
|
| NAICS Category: |
|
| Set Aside: | Total Small Business Set-Aside (FAR 19.5) |
| Posted Date: | Mar 9, 2026 |
| Due Date: | Apr 10, 2026 |
| Solicitation No: | 127EAX26Q0014 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
- Contract Opportunity Type: Combined Synopsis/Solicitation (Original)
- Original Published Date: Mar 09, 2026 03:15 pm CDT
- Original Date Offers Due: Apr 10, 2026 01:00 pm CDT
- Inactive Policy: 15 days after date offers due
- Original Inactive Date: Apr 25, 2026
-
Initiative:
- None
- Original Set Aside: Total Small Business Set-Aside (FAR 19.5)
- Product Service Code: Z1LB - MAINTENANCE OF HIGHWAYS/ROADS/STREETS/BRIDGES/RAILWAYS
-
NAICS Code:
- 237310 - Highway, Street, and Bridge Construction
-
Place of Performance:
Tres Piedras , NM 87577USA
The Carson National Forest is pursuing road maintenance activities to be accomplished on the Tres Piedras Ranger
District. Base items include drain dip construction, road widening, curve widening, road obliteration, new construction, rip rap placement, road reconditioning, and culvert installation. Drain dip construction will involve excavation and compaction of approximately 180 cubic yards of native material. Road widening will involve approximately 1390 cubic yards of excavation and compaction and will result in total road widths of twelve (12) feet. New construction will involve 0.6 miles of clearing and grubbing and approximately 600 cubic yards of excavation and compaction. Road reconditioning will involve ditch maintenance, shoulder maintenance, roadbed maintenance, and aggregate surface maintenance where applicable. Lastly, culvert installation will involve the placement of a 57” x 38” arched corrugated metal pipe thirty (30) feet in length on top of approximately 30 cubic feet of uncompacted bedding material.
- 333 Broadway BLVD SE
- Albuquerque , NM 871023498
- USA
- Troy A. McCullough
- troy.mccullough@usda.gov
- Mar 09, 2026 03:15 pm CDTCombined Synopsis/Solicitation (Original)
Related Document
| Mar 12, 2026 | [Combined Synopsis/Solicitation (Updated)] Rock Creek Road Maintenance |
See Also
Project: General Contractor On-Demand for Construction Services Ref. #: RFP 07-27-DC Type: RFP
Bernalillo County
Due by 10/08/2026
Project ID: Title: Primary Clarifier #1 Rehabilitation Project Addenda: 0 Release Date: 8/27/2026
City of Santa Fe
Due by 9/30/2026
Follow GAOA Coyote Roof Replacement Active Contract Opportunity Notice ID 127EAX26Q0080 Related Notice
AGRICULTURE, DEPARTMENT OF
Due by 10/01/2026
Follow Solicitation is Restricted to the Current Region 3, Zone 5 FERM BPA
AGRICULTURE, DEPARTMENT OF
Due by 10/09/2026