RNP2025-3 Paving of Taylor Farm Parking Lot (Base Bid) and Drainage System Overflow (Alternate 1)
| Agency: | City of Norwalk |
|---|---|
| State: | Connecticut |
| Type of Government: | State & Local |
| NAICS Category: |
|
| Posted Date: | Aug 6, 2025 |
| Due Date: | Aug 21, 2025 |
| Solicitation No: | 4466 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
Project Description: The proposed work for the Base Bid project is a pavement rehabilitation project of the existing park parking lot and a proposed extension to accommodate more visitors. This project consists of a 2" mill and overlay of the existing parking lot, resetting of existing structures as depicted, removing a portion of the existing concrete curb, installation of a new catch basin to connect to a new stormwater detention system, formation of sub-grade and 2" overlay for the proposed parking lot extension, and installation of pavement markings. Visitor access to the park must be maintained during construction. The proposed work for the Alternate 1 project is the addition of a drainage overflow for the stormwater detention system.
See Also
Invitation to Bid for Construction Services Rowland Government Center - Energy Audit Implementation
State Government of Connecticut
Due by 12/15/2026
Project ID: Title: RFP027-35 Evansville East Well Rehabilitation Addenda: 0 Release Date: 10/30/2026
City of Meriden
Due by 11/20/2026
Window Replacement Services Addendum #1 Addendum #2
Town of Plainfield
Due by 11/10/2026
NUMBER TITLE STATUS BID TYPE NAME CONTACT INFORMATION AVAILABLE DATE CLARIFICATION DEADLINE DUE
Regional Water Authority
Due by 11/12/2026