RNP2025-3 Paving of Taylor Farm Parking Lot (Base Bid) and Drainage System Overflow (Alternate 1)
| Agency: | City of Norwalk |
|---|---|
| State: | Connecticut |
| Type of Government: | State & Local |
| NAICS Category: |
|
| Posted Date: | Aug 6, 2025 |
| Due Date: | Aug 21, 2025 |
| Solicitation No: | 4466 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
Project Description: The proposed work for the Base Bid project is a pavement rehabilitation project of the existing park parking lot and a proposed extension to accommodate more visitors. This project consists of a 2" mill and overlay of the existing parking lot, resetting of existing structures as depicted, removing a portion of the existing concrete curb, installation of a new catch basin to connect to a new stormwater detention system, formation of sub-grade and 2" overlay for the proposed parking lot extension, and installation of pavement markings. Visitor access to the park must be maintained during construction. The proposed work for the Alternate 1 project is the addition of a drainage overflow for the stormwater detention system.
See Also
Number 8749 Title ADA Compliant Bathrooms at the Mattatuck Historical Society Available Date
City of Waterbury
Due by 9/23/2026
Heroes Tunnel Rehabilitation and Route 15 Interchange 46 Improvements Start Date : August
State Government of Connecticut
Due by 9/24/2026
Willow Brook Park Tennis Court Rehabilitation The scope of work generally consists of
State Government of Connecticut
Due by 9/25/2026
Invitation to Bid for Construction Services Old New-Gate: Viets Rehabilitation 106 New Gate
State Government of Connecticut
Due by 10/14/2026