RMCD ROAR 2
| Agency: | DEPT OF DEFENSE |
|---|---|
| State: | Georgia |
| Type of Government: | Federal |
| FSC Category: |
|
| Posted Date: | May 11, 2026 |
| Due Date: | May 26, 2026 |
| Solicitation No: | FA8525-26-RMCDROAR2 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
- Contract Opportunity Type: Sources Sought (Original)
- Original Published Date: May 11, 2026 08:33 am EDT
- Original Response Date: May 26, 2026 04:00 pm EDT
- Inactive Policy: 15 days after response date
- Original Inactive Date: Jun 10, 2026
-
Initiative:
- None
- Original Set Aside:
- Product Service Code:
- NAICS Code:
-
Place of Performance:
Marietta , GA 30063USA
C-5M Replacement Multi-Functional Controls and Displays (RMCD) Program
Request for Information
The Government is conducting market research to identify possible sources that have the knowledge and experience to deliver a hardware and software system solution to perform all the functions of the legacy Multi-Function Display Units (MFDUs) classified as the C-5M Replacement Multi-Functional Controls and Displays (RMCD) program. This new solution will resolve known diminishing manufacturing source issues with this Line Replaceable Unit (LRU), avoid projected aircraft Mission Incapable for Parts-based grounding issues, and improve overall aircraft availability metrics. This effort would require up to a Secret security clearance.
The Contractor shall ensure that their solution conforms to applicable military and aviation standards to ultimately gain military airworthiness certification upon integration onto the aircraft. The Contractor shall prioritize the use of the Modular Open Systems Approach (MOSA).
The Contractor shall provide sufficient system quantities to support integration activity at both Contractor and Government Systems Integration Laboratories (SIL) as well as to support follow-on prototype installations and subsequent ground and flight testing.
The Contractor shall provide a product baseline to include documentation describing all of the physical characteristics of their C-5M RMCD design and configuration items and the physical characteristics designated for pre-production acceptance testing, as well as product support documentation necessary for installation, test, operation, support, training, and disposal of the configuration items. The EMD-approved product baseline includes “build-to” specifications for hardware (e.g., product, process, material specifications, engineering drawings, and other related data) and software. It is noted that the software development will proceed according to an agile at scale framework (e.g. SAFe) whose incremental approach does not follow the traditional waterfall milestone progression.
The Contractor shall furnish all material, support equipment, tools, test equipment, and services. The Contractor is responsible for providing, maintaining, and calibrating all support equipment required at their facility or a subcontractor’s facility. Contractor-furnished material or parts used for replacement shall equal or exceed the quality of the original material or parts.
Contractors/Institutions responding to this market research are placed on notice that participation in this survey may not ensure participation in future solicitations or contract awards. The Government will not reimburse participants for any expenses associated with their participation in this survey.
- CP 478 926 0055 235 BYRON ST BLDG 300 STE 19A
- ROBINS AFB , GA 31098-1670
- USA
- Maria George
- maria.george.1@us.af.mil
- Myoshe Johnson
- myoshe.johnson@us.af.mil
- May 11, 2026 08:33 am EDTSources Sought (Original)
See Also
Event ID Event Title Government Entity Start Date (ET) End Date (ET) PE-66243-NONST-2027-000000091
State Government of Georgia
Due by 9/23/2026
IWQ 135541 Dispensers Buyer Contact : Casey.Beauston@GwinnettCounty.com Opening Date : 11/27/2026 03:00 PM
Gwinnett County
Due by 11/27/2026
Event ID Event Title Government Entity Start Date (ET) End Date (ET) PE-77023-NONST-2027-000000725
State Government of Georgia
Due by 9/21/2026
Event ID Event Title Government Entity Start Date (ET) End Date (ET) PE-77523-NONST-2026-000000085
State Government of Georgia
Due by 9/24/2026