River Infrastructure Locating and Assessment

Agency: Pierce County
State: Washington
Type of Government: State & Local
NAICS Category:
  • 541330 - Engineering Services
  • 541512 - Computer Systems Design Services
  • 541611 - Administrative Management and General Management Consulting Services
  • 541620 - Environmental Consulting Services
  • 541690 - Other Scientific and Technical Consulting Services
  • 541990 - All Other Professional, Scientific, and Technical Services
Posted Date: Jun 14, 2026
Due Date: Jun 26, 2026
Original Source: Please Login to View Page
Contact information: Please Login to View Page
Bid Documents: Please Login to View Page


Project ID:

Title: River Infrastructure Locating and Assessment

Addenda: 0

Release Date: 6/12/2026

Due Date: 6/26/2026

Follow
River Infrastructure Locating and Assessment
Request For Qualification
Planning and Public Works
Project ID: 2026-RFQ-142
Release Date: Friday, June 12, 2026
· Due Date: Friday, June 26, 2026 1:00pm
Posted Friday, June 12, 2026 9:00am
All dates & times in Pacific Time
Draft Response No Bid
Time Remaining: 11 days, 18 hours, 30 minutes


Post Information

Posted At:Fri, Jun 12, 2026 9:00 AM
Sealed Bid Process:Yes (Bids Sealed / Pricing Sealed)
Private Bid:No
Overview


Summary

Pierce County is seeking a Geotechnical Engineering firm that demonstrates knowledge and expertise in locating hidden, obscured, and buried flood risk reduction assets, such as revetments and levee features, for Phase 1 of a "State of the System" study. The Consultant will use repeatable, scalable, and defensible methods that can be applied to similar flood risk reduction assets along the managed river system. The proposed work will be conducted along selected segments of the Puyallup and White Rivers.



Background

Pierce County Planning and Public Works is responsible for the ownership, operation, and maintenance of over 70 miles of riverine flood risk reduction infrastructure in the form of levees and revetments. The majority of the infrastructure was constructed between 1915 and the mid-1960’s. The levee prisms or levee core were constructed of earthen materials. The earthen materials primarily consisted of in-situ river-wash silts and gravels. The levee prism was then typically armored with concrete panels to protect the levee prism. Revetment were constructed by shaping the bank line and armoring with concrete panels. The concrete may or may not contain steel reinforcement. Over time portions of the infrastructure have become hidden, obscured or buried due to natural river processes such as vegetation growth and sediment deposition. Other causes may be attributed to encroachments from development activities.

Pierce County Planning and Public Works is starting a process to initiate a “State of the System” study to better understand flood risk reduction infrastructure condition and performance along the managed riverine system. A critical dependency of that effort is accurate knowledge of the location of the existing flood risk reduction assets. Several segments of the flood risk reduction assets are currently hidden, buried, undocumented, or poorly represented in existing records. Without first locating, documenting, and assessing these assets, a “State of the System” effort cannot be successful or credible.



Timeline

Release Project Date:
June 12, 2026
Question Submission Deadline:
June 19, 2026, 4:00pm
Proposal Submission Deadline:
June 26, 2026, 1:00pm
Proposal Evaluation:
Approximately three weeks after proposal submission deadline, proposals will be evaluated and interviews may be held if multiple proposers are deemed capable of meeting the requirements.
Estimated Notice of Intention to Negotiate a Contract:
Approximately six weeks after proposal submission deadline.
Estimated Date of Contract Execution :
Approximately eight weeks After proposal submission deadline.
* Disclaimer: This website provides information about bids, requests for proposals (RFPs), or requests for qualifications (RFQs) for convenience only and does not serve as an official public notice. Individuals who wish to respond to or inquire about bids, RFPs, or RFQs should contact the relevant government department directly.

Sign-up for a Free Trial, Government Bid Alerts

With Free Trial, you can:

You will have a full access to bids, website, and receive daily bid report via email and web.

Try One Week FREE Now

See Also

Project ID: CTY-CR-2025-12 Title: CITYWIDE CONSULTANT ROSTER: Audit, Financial, and Asset Management Consulting

City of Seattle

Bid Due: 12/30/2030

Project ID: CTY-CR-2025-15 Title: CITYWIDE CONSULTANT ROSTER: General Project and Program Management Consulting

City of Seattle

Bid Due: 12/30/2030

0% Number 12-16 Title On-Call IT Consulting Services (Continuous) Available Date 8/26/2016 2:37

Community Transit

Bid Due: 12/31/2028

Solicitation Close Date: 07/28/26 Title: Youth Advisory Committee Coordination Ref #:26-DCYF-OJJ-103 Contact: Jenny

State Government of Washington

Bid Due: 7/28/2026