RFQ 40758_Water_Control_Underwater_Inspection
| Agency: | State Government of Florida |
|---|---|
| State: | Florida |
| Type of Government: | State & Local |
| Posted Date: | Dec 19, 2024 |
| Due Date: | Jan 16, 2025 |
| Solicitation No: | RFSQ-11245 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
| Code | Description |
| 71122309 | Subsea well production equipment monitoring and inspection service |
| 78141600 | Inspection |
| 81103000 | Marine operation and inspection services |
Project Description
The objective of the project (Project) is to inspect all underwater culvert/structures identified in Attachment A – Statement of Work, Appendix A - Underwater Inspection List, to assess their current condition and provide critical information for repair and maintenance activities. Inspection Reports will be supplied to the United States Army Corps of Engineers (USACE).
Consultant shall provide an underwater inspection team and qualified divers to inspect all structure elements which are primarily below-water. The underwater inspection team shall include individuals qualified by experience and training in the inspection, design, construction and understanding of the operation of flood control structures. A minimum of one (1) member of the inspection team shall be a professional engineer licensed in the State of Florida under Chapter 471, Florida Statute. The professional engineer, as a member of the inspection team, shall be responsible for the overall underwater inspection findings and recommendations.
All dive operations shall meet the requirements and qualifications of OSHA 29 CFR Part 1910, Subpart T - Commercial Diving Operations. Underwater inspectors must be familiar with the principles of general civil, geotechnical, structural, electrical and mechanical engineering.
In addition to OSHA 29 CFR Part 1910, Consultant shall ensure that all other applicable federal and state safety regulations are met. This includes providing staff and equipment to meet the requirements.
Structure underwater inspections shall be based on USACE’s manual EM 1110-2-2902 Conduits, Pipes, and Culverts Associated with Dams and Levee Systems, Chapter 6: Inspections, Condition Assessments, and Prioritized Mitigation Plans. Other federal or industry standards of practice may be utilized for specific activities if appropriate. The following list presents a partial listing of inspection standards; other standards may also apply. Consultant shall use the most recent version of referenced standards.
- Underwater Inspection of Bridges FHWA-NHI-10-027; U.S. DOT/FHWA
- Underwater Investigations Standard Practice Manual, Level 1 Inspections, American Society of Civil Engineer’s (ASCE)
| Description | Date/Time |
| RFQ 40758_Water_Control_Underwater_Inspection | Dec 20, 2024, 6:15:51 AM |
See Also
Follow HPLC Core System Active Contract Opportunity Notice ID 1178021 Related Notice Department/Ind.
AGRICULTURE, DEPARTMENT OF
Due by 11/25/2026
Project: Brake Dyno Calibration Ref. #: SS 26-582170 Type: SS Status: Open Open
Pinellas Suncoast Transit Authority
Due by 11/16/2026
Follow H265--DIAGNOSTIC IMAGING EQUIPMENT TESTING Active Contract Opportunity Notice ID 36C24827Q0077 Related Notice
VETERANS AFFAIRS, DEPARTMENT OF
Due by 11/17/2026
Advertisement Detail Department of Transportation Invitation to Bid Inspection and Roof Repair Systems-Florida's
State Government of Florida
Due by 11/12/2080