Shenandoah County, Virginia
600 North Main Street, Suite 102
Woodstock, Virginia 22664
REQUEST FOR QUOTES (RFQ)
for
Structured Cabling Replacement &
Infrastructure Consolidation
at
Shenandoah County Government Center
Project Name:
Shenandoah County Government Center Structured Cabling Project
Location:
600 North Main Street, Woodstock, VA 22664
Issue Date:
Wednesday, November 25, 2026
Due Date for Quotes: Tuesday, December 29, 2026 at 2:00 pm (EST)
All quotes and inquiries for information shall be submitted in writing and be directed to:
Mandy R. Belyea, Deputy County Administrator
600 North Main Street, Suite 102
Woodstock, Virginia 22664
mbelyea@shenandoahcountyva.us
www.shenandoahcountyva.gov
Quotes may be delivered in person, by mail or courier service, or by email as noted above. Quotes received after the
announced time and date for receipt will remain unopened. Quotes must be prepared in complete conformance
with all enclosed information and requirements, which is hereby incorporated into this RFQ. Failure to meet any
standard set forth in this RFQ may result in rejection of the quote. Quoted prices must be held firm for forty-five
(45) days. Please clearly mark your quote as Shenandoah County Government Center Structured Cabling
Project.
1
1. ANTICIPATED SOLICITATION SCHEDULE
The County reserves the right to adjust these dates as necessary.
Event
RFQ Release Date
Non-Mandatory Meeting & Walkthrough
Shenandoah County Government Center
Board Room
600 N Main St, Woodstock, VA
County Responses to Questions from
Non-Mandatory Meeting & Walkthrough
Deadline for Written Questions
County Responses to Written Questions
Receipt of Quotes
Anticipated Contract Award
Date & Time
Wednesday, November 25, 2026
Monday, December 7, 2026
10:00 AM
Friday, December 11, 2026
by 4:30 pm
Wednesday, December 16, 2026
by 4:30 PM
Monday, December 21, 2026
by 4:30 pm
Tuesday, December 29, 2026
by 2:00 PM
Week of January 4, 2027
2. PROJECT OVERVIEW & BACKGROUND
Shenandoah County Government is soliciting competitive quotes from qualified, licensed low-voltage contractors to
provide a turnkey structured cabling solution for the Shenandoah County Government Center located at 600 N Main
Street, Woodstock, VA 22664.
The facility houses:
● 1st Floor: Shenandoah County Government Offices
● 2nd Floor: Shenandoah County School Board Offices
The primary objective of this project is to replace all existing Category/Data cabling throughout both floors,
consolidate the existing Main Distribution Frames (MDFs) and Intermediate Distribution Frames (IDFs)
infrastructure into a single consolidated MDF, provide fiber optic interconnectivity for transition and future server
operations, and systematically remove all abandoned cable after transition.
3. SCOPE OF WORK
3.1 Workstation, Horizontal, & Specialized Cabling
• Standard Drop Configuration: Each designated wall plate location shall receive two (2) Cat6 network data
drops.
• Total Cat6 Drop Quantities:
○ Shenandoah County Government (1st Floor): Total of 250 wall plate locations, totaling 500 Cat6
drops (includes 13 ceiling drops for Wireless Access Points (APs)). Plus an additional 10% cable
allowance to be installed by contractor if needed for missed or supplemental runs.
○ Shenandoah County Schools (2nd Floor): Total of 107 wall plate locations, totaling 214 Cat6 drops
(includes 10 ceiling drops for Wireless Access Points (APs)). Plus 1 additional Board Room ceiling
2
drop on the 1st floor that runs to the school system’s patch panel. Plus an additional 10% cable
allowance to be installed by contractor if needed for missed or supplemental runs.
• Dedicated Fax Lines: Contractor shall install dedicated voice/fax lines punched down separately for each
entity within the consolidated MDF:
○ Shenandoah County Government Fax Lines: Total of 9 lines.
○ Shenandoah County Schools Fax Lines: Total of 4 lines.
• Pathways & Outlets: The contractor shall utilize existing cable pathways and existing back-boxes/wall plates
where available and feasible.
• Markings & Floor Plans: Floor plan drawings detailing every network drop, ceiling AP location, and fax
line location are provided in Appendix B of this document.
3.2 Physical Access Control System (PACS) Cabling
● Access Control Runs: Contractor shall install home-run access control cable from the consolidated MDF to
each of the 55 door locations setup with electronic door access as indicated on the provided building drawings.
● Cable Specifications: Contractor shall supply composite access control cabling suitable for access control
panel-to-door hardware connections. The County specifies Windy City Wire 4461030: 4 Element Comp Cable
CMP Yellow Jacket at each door location.
● Non-Terminated Service Loops: Cabling for access control shall NOT be terminated at either the door
location or inside the MDF patch panels/racks.
● Ceiling Coil/Service Loop Requirements:
○ At each designated door location, contractor shall leave a 20-foot service coil neatly bundled and
secured in the ceiling space directly above or adjacent to the doorway.
○ At the MDF end, contractor shall leave a 20-foot service coil neatly bundled and labeled in the ceiling
above the MDF rack area for future termination by the access control vendor.
● Identification: Both ends of all access control cabling must be clearly and permanently tagged.
• Markings & Floor Plans: Floor plan drawings detailing network drops, ceiling AP locations, fax lines, and
door locations are all combined and provided in Appendix B of this document.
3.3 Infrastructure Consolidation & MDF Racking
● Existing network distribution (MDF/IDFs across 1st and 2nd floors) will be consolidated into a single primary
MDF servicing both floors.
● Contractor shall furnish and install equipment racks, vertical/horizontal cable management, and patch panels
inside the consolidated MDF room.
● Network Separation: The single MDF must be physically and logically structured to keep the County
Government Network and the School Board Office Network distinctly separated (rack layout, patch
panels, cabling hierarchy, labeling, etc.). Refer to Appendix A (enclosed) for specific rack elevations and physical
separation requirements.
3.4 Fiber Optic Backbone & Cutover Interconnections
To maintain zero/minimal network downtime during the transition phase, the contractor shall run temporary
or permanent fiber optic interconnects as follows:
3
1. Transition Fiber Runs: Run fiber from current 1st floor MDF closet locations to the new consolidated
MDF closet and the current 2nd floor MDF to the new consolidated MDF closet to keep both County and
School Board networks fully operational during the transition.
○ New MDF to 1st Floor MDF
i. Route: Connect current 1st Floor MDF to the New MDF Closet as marked on reference map
“Shenandoah County Government Center – 1st Floor – North.”
ii. Cable Specification: 12-Strand OM4 Multimode Fiber (50/125 µm), OFNP Plenum-rated
jacket.
iii. Terminations: LC Duplex connectors landed in 1U/2U rack-mounted fiber enclosures at
both MDFs.
iv. Execution & Testing: Route in protective innerduct. Provide ANSI/TIA-606-C labeling and
certified Tier 1/Tier 2 test results with final as-built documentation.
○ New MDF to 2nd Floor MDF
i. Route: Connect current 2nd Floor MDF as marked on reference map “Shenandoah County
Government Center 2nd Floor – School Board Office” to the New MDF Closet as marked on reference
map “Shenandoah County Government Center – 1st Floor – North.”
ii. Cable Specification: 12-Strand OM4 Multimode Fiber (50/125 µm), OFNP Plenum-rated
jacket.
iii. Terminations: LC Duplex connectors landed in 1U/2U rack-mounted fiber enclosures at
both MDFs.
iv. Execution & Testing: Route in protective innerduct. Provide ANSI/TIA-606-C labeling and
certified Tier 1/Tier 2 test results with final as-built documentation.
2. Future Server Room Fiber Run: Run fiber optic cable from the new consolidated MDF to the designated
future server room elsewhere in the building.
○ Route: Run two (2) separate fiber cables from the New MDF Closet to the Future Server Room as
marked on reference map “Shenandoah County Government Center – 1st Floor – North.”
○ Cable Specification: Two (2) 12-Strand OM4 Multimode Fiber cables (50/125 µm), OFNP Plenum-
rated jacket.
○ Termination (MDF End):
i. Cable 1 (12 strands): Terminated with LC Duplex connectors in the New MDF on the County
Government Network Racks.
ii. Cable 2 (12 strands): Terminated with LC Duplex connectors in the New MDF on the School
Board Office Network Racks.
○ Termination (Server Room End): Leave both 12-strand cables un-terminated, coiled (minimum 20
ft service loop) in the ceiling space directly above the Future Server Room, and clearly labeled with
their respective network origins.
○ Execution & Testing: Route in protective innerduct. Provide ANSI/TIA-606-C labeling and
certified Tier 1/Tier 2 test results for the terminated MDF ends.
3.5 Phasing, Transition, & Abandoned Cable Removal
● 8-Week Transition Window: The County requires an 8-week transition window between the successful
activation of the new cabling/MDF infrastructure and the complete decommission/cutover of active network
hardware from the old cabling.
4
● Removal of Abandoned Cabling: Once the new network is fully operational and the old network
infrastructure is formally abandoned by County/School IT staff, the contractor shall return to the facility to
completely remove all abandoned cabling from pathways, ceilings, and risers to comply with local building
and NEC fire codes.
4. TECHNICAL STANDARDS & SPECIFICATIONS
All work, materials, and testing shall comply with the latest industry standards (including TIA/EIA-568-D, TIA/EIA-
569-D, ANSI/TIA-606-C, TIA/EIA-607-C, and National Electrical Code / NFPA 70):
● Cable Rating: All horizontal cabling installed in plenum ceiling spaces must be CMP (Plenum) rated.
● Pathway Management: Cable run through ceiling space shall be supported using J-hooks or existing cable
trays every 4–5 feet. Cables shall not rest on ceiling tiles or be attached to grid wires/sprinkler systems.
● Firestopping: Any penetration through fire-rated walls or floors shall be sealed using code-compliant firestop
putty/sealants.
● Labeling: Machine-printed labels (ANSI/TIA-606-B standard) must be affixed to all faceplates, cable ends
(within 6 inches of termination point), and patch panel ports.
● Testing & Certification: 100% of horizontal copper links and fiber runs shall be tested and certified using
a Level V tester (e.g., Fluke DSX). Digital test results organized by closet and drop ID must be provided prior
to final acceptance.
5. CONTRACTOR QUALIFICATIONS & REQUIREMENTS
● Licensing: Vendor must hold a valid Virginia Class A Contractor License with low-
voltage/telecommunications endorsements.
● Experience: Minimum of 3–5 years of documented experience executing structured cabling installations of
similar size and complexity.
● Warranty: Contractor must provide a minimum 1-year labor/workmanship warranty in addition to standard
manufacturer warranties on materials (cable, patch panels, jacks).
6. PROPOSAL SUBMISSION & EVALUATION
6.1 Required Submission Documents
Interested contractors shall submit a quote containing the following:
1. Itemized Cost Breakdown:
a. Materials (Cable, Racks, Patch Panels, Fiber, Connectors)
b. Labor & Installation (MDF Consolidation, Drop Installation, Fiber Pulls)
c. Phased Removal of Abandoned Cabling
2. Bill of Materials (BOM): List of proposed manufacturers, part numbers, and cable specifications.
3. Project Timeline & Phasing Plan: Highlighting adherence to the 8-week transition period.
4. References: At least three (3) references from commercial or local government projects of similar scope
completed within the last 5 years.
5. Proof of Licensing & Insurance
6.2 Evaluation Criteria
Quotes will be evaluated based on the following criteria: