RFQ #24-032 Soil & Material Testing

Agency: Wake County
State: North Carolina
Type of Government: State & Local
NAICS Category:
  • 541330 - Engineering Services
  • 541380 - Testing Laboratories
Posted Date: Apr 4, 2024
Due Date: Apr 26, 2024
Solicitation No: RFQ #24-032
Bid Source: Please Login to View Page
Contact information: Please Login to View Page
Bid Documents: Please Login to View Page

RFQ #24-032 Soil & Material Testing

RFQ #24-032 Soil & Material Testing and Inspection Services and Special Inspections

Due Date/Time: April 26, 2024, by noon

Contact: Paulo Lopez paulo.lopez@wake.gov

Attachment Preview

April 4, 2024
REQUEST FOR QUALIFICATIONS
FOR
SOIL AND MATERIAL TESTING AND INSPECTION SERVICES
AND SPECIAL INSPECTIONS
FOR
WAKE COUNTY
FACILITIES DESIGN & CONSTRUCTION PROJECTS
RFQ #24-032
I. Project
Wake County Facilities Design & Construction Projects.
II. Project Team
Wake County is the Owner of the projects. Design Professionals are selected in accordance with
the Wake County Board of Commissioners' Policy for Selecting Design Consultants.
III. Project Summary
Wake County Facilities Design & Construction plans and implements the Capital Improvement
Program for County departments and the Board of Commissioners. Generally, the types of
capital projects include libraries, public safety facilities, human services buildings, detention
facilities, parks, office buildings, historic building restorations, emergency communications
facilities, water and sewer projects, solid waste facilities, site development, building renovations
and major preventive maintenance projects. Design, construction work, materials testing, and
various other services are outsourced to private firms through competitive procurement methods
as allowed by NC General Statutes. Projects in this request will have a construction cost range
between $50,000 and $100 million each.
IV. Request
Wake County Government hereby requests proposals from Soil & Material Testing & Inspection
firms to provide soil and material testing and inspection services, geotechnical engineering, and
special inspections as required to assure compliance with Contract Documents for the duration of
Wake County Facilities Design & Construction projects.
1 of 6
V. Consultant Qualifications
The Soil & Material Testing & Inspection firm and staff proposed to be assigned responsibilities
on these projects, must be highly qualified and have extensive experience in all aspects of soil
and material testing and inspection services, geotechnical engineering, and special inspections on
similar projects. They must also have the proven capability to effectively and efficiently work
with a project team in development and implementation of a construction quality control
program.
VI. Scope of Work
The scope of work shall include all independent soil and material testing and inspection services,
geotechnical engineering and special inspections outlined in the Quality Control Plan (refer to
Article VIII B.) and as required by the project specifications.
VII. Project Schedule
The duration of projects varies from several months to 1-2 years, depending on size, complexity
and logistical requirements. The contract documents for each project specifies the construction
period and requires the awarded contractor for each project to develop a detailed construction
schedule.
VIII. Proposal Format Requirements
All proposals shall be submitted on 8½” x 11" paper, side bound with Table of Contents and
reference tabs for key sections. The total submittal shall not exceed either twenty (20) double-
sided or forty (40) single-sided pages with text, consecutively numbered. An electronic copy
submitted on a thumb drive must also be included. Submittals must include, at a minimum, the
following:
A. Project Organization and Staffing
1. Organization/Staffing Chart listing all staff to be assigned to the Project.
2. Detailed resumes of all staff listed.
3. Description of responsibilities to be fulfilled by each assigned staff member.
4. Current and proposed weekly contract commitments of assigned staff to other
projects.
5. Listing and brief description of three representative projects completed by the firm;
provide references and phone numbers for each project; identify staff who were
involved in each project.
B. Quality Control and Documentation Plan
Respondents must describe their proposed plan for assisting the Project Team in assuring
a high standard of quality is achieved and documented. Soil and material testing and
inspection services, geotechnical engineering, and special inspections services are to be
included in the Quality Control and Documentation Plan. The following key items of
2 of 6
work are also to be included in the Quality Control Plan along with any additional items
deemed appropriate by the testing and inspection consultant.
Subsurface soil investigation and analysis
Excavating and backfilling
Mass earthwork and rock excavation
Special retaining wall structures
Pile and cap foundations
Cast-in-place concrete construction
Pre-cast concrete panels
Post tension concrete slabs
Masonry construction
Masonry wall systems and materials
Damp proofing and waterproofing
Structural steel
Metal decking
Metal wall panels
Fireproofing of structural steel and metal decking
Roofing systems, flashing and sheet metal
Hot-mixed asphalt paving, stone base and subgrade preparation
Seismic requirements
At the conclusion of testing for each category and with the issuance of each report, a
certification by a Professional Engineer duly licensed by the State of North Carolina will
be required stating that all work or portions thereof have been tested and/or inspected and
that work conforms to the contract documents.
In accordance with Chapter 17 of the current North Carolina State Building Code, Special
Inspections shall be included in this Scope of Services. Special Inspections may consist
of inspection/testing of soils, cast-in-place concrete, masonry, structural steel, and certain
seismic requirements, to the extent defined by the Construction Documents, and as
required by local authorities having jurisdiction.
C. Consultant Professional Fees
Provide hourly rates, unit laboratory testing costs, unit prices and any other billable costs
for each service anticipated by the Firms’ proposed Quality Control Program for this
project. As these fees are to be used for the selection process only and are not associated
with any fixed price or bid, per ncbels.org they are allowed to be included.
IX. Selection of Soil & Material Testing & Inspection Firms
A. Process
Procedures similar to those followed by Wake County in the selection of design
consultants will be followed. This will ensure that the Soil & Material Testing &
Inspection firms are selected in a fair and uniform manner and have appropriate
qualifications and experience.
3 of 6
The Facilities Design and Construction Director has appointed a Selection Committee
comprised of County staff. Upon receipt of proposals from respondents, Selection
Committee members will review the proposals in detail and identify (“short list”) those
firms that appear to be most qualified to provide services for the project. Separate
presentation and interview sessions will then be scheduled with the “short-listed” firms to
permit the Selection Committee to further evaluate each firm’s qualifications and
proposal. After interviews, the Selection Committee will make their selection and
provide written recommendations to the Director for his approval. Following the
Director’s approval, the Facilities Design & Construction office will be directed to
negotiate terms, conditions and fees of an agreement with each selected firm. In the
event negotiations of specific contract terms and conditions prove unsuccessful with a
selected firm, the Selection Committee will select another firm with which to begin
contract negotiations.
B. Timeline
The key activities and milestone dates for the selection process of the Soil & Material
Testing & Inspection Firms are listed below, but are subject to change as conditions
warrant:
Activity
RFQ Published and Distributed
Deadline for Respondent Questions
Proposal Submission Deadline
Selection Committee meeting to determine short list
Selection Committee presentation/interviews sessions
Firm Selection
Milestone Date
April 8, 2024
April 19, 2024
April 26, 2024
May 9, 2024*
May 22, 2024*
May 31, 2024*
*Dates are subject to change
X. Evaluation Criteria
A. The following criteria will be the basis on which firms will be selected for further
consideration:
1. Qualifications and expertise of firm’s personnel to be assigned to the Project.
2. Proposed Quality Control Plan.
3. Proposed Documentation Plan.
4. Experience and past performance on similar projects.
5. Current workload of firm’s personnel.
6. Firm’s unit rates for performing required work.
7. Compliance with Proposal format requirements.
8. Proximity to and familiarity with Wake County area.
9. Other factors that may be appropriate for the Project.
4 of 6
Although required information is listed in the Proposal Format Requirements, the
selection criteria is listed above, and for evaluation purposes the proposals should
conform and match the items listed in numerical order above.
XI. Submission of Proposals
Five (5) complete packages, and (1) electronic copy on a thumb drive must be received at the
following address by noon on Friday, April 26, 2024:
To:
County of Wake,
Facilities Design & Construction
Attention: Paulo López, Facilities Project Manager
Email: paulo.lopez@wake.gov
Phone: (919) 856-6351
Mailing Address:
PO Box 550
Raleigh, NC 27602
Delivery Address:
336 Fayetteville St; Suite 1100
Raleigh, NC 27601
XII. Professional Services Agreement
The County’s Standard Form of Contract for Testing and Inspection Services will be used. The
term of the Agreement will be a five-year period. Wake County will retain the option to renew
at the end of the five-year term.
XIII. General Comments
A. Any cost incurred by respondents in preparing or submitting a proposal for the Project
shall be the respondents' sole responsibility.
B. All responses, inquiries or correspondence relating to this RFQ will become the property
of Wake County when received.
C. Any specific questions regarding the Request for Proposal should be directed to Paulo
López, Facilities Project Manager, Wake County Facilities Design & Construction
(paulo.lopez@wakegov.com). If a question of general concern is asked by any firm with
regards to this RFQ, a copy of the written response will be sent to all firms.
D. The Selection Committee intends to select multiple firms to provide soil and material
testing and inspection services, geotechnical engineering, and special inspections for
Wake County Facilities Design & Construction projects.
E. Please refer to the following website location for a copy of the Request for Qualifications
and Proposal and any other related information. If a question of general concern is asked
by any firm, an addendum will be issued to include a copy of the written response.
5 of 6

Sign-up for a Free Trial, Government Bid Alerts

With Free Trial, you can:

You will have a full access to bids, website, and receive daily bid report via email and web.

Try One Week FREE Now

See Also

Bid Number 2629 Old Charlotte Rd. Waterline Replacement Submissions Due: 5-15-2024 02:00 PM

City of Concord

Bid Due: 5/15/2024

H961--Emergency Power System Maintenance Active Contract Opportunity Notice ID 36C24624Q0525 Related Notice 36C24624Q0525

Federal Agency

Bid Information Type Request for Proposal (Offline) Status Issued Number RFP 24-030R1 (Eddy

Durham County

Bid Due: 5/07/2024

Solicitation Number Project Title Description Opening Date Posted Date Status Department 78-78-202400424 Aurora

State Government of North Carolina

Bid Due: 5/28/2024