RFQ - Richardson Water Treatment Plant Sulfuric Acid Tank Replacement
| Agency: | State Government of North Carolina |
|---|---|
| State: | North Carolina |
| Type of Government: | State & Local |
| NAICS Category: |
|
| Posted Date: | Aug 18, 2025 |
| Due Date: | Sep 18, 2025 |
| Solicitation No: | 345-08/18/2025 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
| Solicitation Number: | 345-08/18/2025 |
| Project Title: | RFQ - Richardson Water Treatment Plant Sulfuric Acid Tank Replacement |
| Description: | Cape Fear Public Utility Authority (CFPUA) requests Statements of Qualifications (SOQ) from consulting engineering firms for the design and permitting services of tank replacement, improvements to the Sulfuric Acid Room, and associated equipment at the Richardson Water Treatment Plant. The Richardson Water Treatment Plant (RWTP) was built in 2009 and currently produces about 7 million gallons of drinking water per day (mgd). The Richardson WTP Sulfuric Acid Room and associated equipment (Tanks, Pumps, Chemical Coating System, and Chemical Feed Lines) were installed during the initial plant construction completed in 2009. Each aspect of the system is in the various stages of deterioration up-to and including end-of-life. |
| Opening Date: | 9/18/2025 2:00 PM |
| Posted Date: | 8/19/2025 |
| Status: | Open |
| Department: | CAPE FEAR PUBLIC UTILITY AUTHORITY |
|
Solicitation Number
*
345-08/18/2025
|
Department
CAPE FEAR PUBLIC UTILITY AUTHORITY
|
Status Reason
Open
|
|
|
Opening Date
2025-09-18T14:00:00.0000000
|
Posted Date
*
2025-08-18T19:00:25.0000000Z
|
Commodity Code
Civil engineering
|
|
|
Mandatory Conference/Site Visit
—
—
|
Special Instructions
No pre-submittal conference to be held
|
||
|
Description
Cape Fear Public Utility Authority (CFPUA) requests Statements of Qualifications (SOQ) from consulting engineering firms for the design and permitting services of tank replacement, improvements to the Sulfuric Acid Room, and associated equipment at the Richardson Water Treatment Plant. The Richardson Water Treatment Plant (RWTP) was built in 2009 and currently produces about 7 million gallons of drinking water per day (mgd). The Richardson WTP Sulfuric Acid Room and associated equipment (Tanks, Pumps, Chemical Coating System, and Chemical Feed Lines) were installed during the initial plant construction completed in 2009. Each aspect of the system is in the various stages of deterioration up-to and including end-of-life.
|
|||
|
Attachments
|
|||
Get Government Bids Like This by Email
Receive daily bid alerts that match your keywords, business categories, and target regions.
See Also
Bid Number: 27-1091 Bid Title: EGI-2025-01: Highway 55 Sidewalk Extension Category: Construction Bids
City of Durham
Due by 9/25/2026
Solicitation Number: 354-RFB-27-08 Project Title: Fluorosilicic Acid Description: The Town of Cary is
State Government of North Carolina
Due by 9/23/2026
Bid Number: Bid# 26-1062 Bid Title: NOI: Brown Water Treatment Plant Filtrate and
City of Durham
Due by 9/25/2026
IFB 2026-078 IFB Sodium Hypochlorite 12.5% Department: Procurement & Contract Management Category: Bids
Union County
Due by 10/06/2026
* Disclaimer: This website provides information about bids, requests for proposals (RFPs), or requests for qualifications (RFQs) for convenience only and does not serve as an official public notice. Individuals who wish to respond to or inquire about bids, RFPs, or RFQs should contact the relevant government department directly.