RFQ: Pottsville Street Stormwater Improvements

Agency: The Enterprise Center
State: Pennsylvania
Type of Government: State & Local
NAICS Category:
  • 237990 - Other Heavy and Civil Engineering Construction
Posted Date: Jun 27, 2025
Due Date: Jul 22, 2025
Original Source: Please Login to View Page
Contact information: Please Login to View Page
Bid Documents: Please Login to View Page

Description

RFQ: Pottsville Street Stormwater Improvements
June 27, 2025

Project: Pottsville Street Stormwater Improvements
Location: Pottsville Street, Herndon Borough, Northumberland County, PA
Solicited by: Tonia Troup, Project Coordinator, SEDA-COG
?? 201 Furnace Road, Lewisburg, PA 17837
?? (570) 524-4491
?? www.seda-cog.org
?? Publication Date: June 27, 2025
?? Submission Deadline: July 22, 2025, by 10:00 AM (prevailing time)

Submission Instructions
  • Submit three (3) sealed hard copies

  • Clearly mark envelope:
    "Engineering Services Quotation – Pottsville Street"

  • Deliver to:
    Tonia Troup, Project Coordinator
    SEDA-COG, 201 Furnace Road, Lewisburg, PA 17837

  • No faxed or emailed submissions accepted

Project Overview
  • Funded by a Community Development Block Grant (CDBG)

  • Purpose: Mitigate stormwater issues on Pottsville Street and restore roadway

  • Scope includes:

    • 2 new box inlets

    • 18" corrugated plastic piping

    • 4" rolled curb on both sides

    • Milling and resurfacing with base and wearing courses

    • Re-grading for proper drainage

Engineer Responsibilities
  • Full design and documentation

  • All necessary permits (excluding surveys/environmental/historic reviews)

  • Bidding coordination and contract administration

  • Pre- and post-construction meetings

  • Site visits and final inspection

  • “As Built” drawings (1 hard copy + 1 digital)

  • Adherence to PA Prevailing Wage Rates

Required Meetings
  1. Kick-off

  2. Two development meetings

  3. Final design approval/ad readiness

  4. Preconstruction coordination

  5. Optional pre-bid meeting

  6. Bid opening and award recommendation

  7. Preconstruction conference

Indicate any additional meetings and associated costs on the estimate form.

Bidding & Contract Coordination
  • Prepare and distribute bid documents (up to 10 sets)

  • Manage ad placements (ad costs reimbursed by Borough)

  • Provide bid tabulation, award recommendation, contract execution support

  • Issue:

    • Notice of Intent to Award

    • Notice to Proceed

    • Final completion documents

Construction Supervision
  • Minimum 2 site visits + final inspection

  • Monitor conformance, review submittals, disapprove non-compliant work

  • Review and approve payment requests

  • Serve as Borough’s site representative

  • Frequency of visits must be estimated in quotation based on projected timeline
    (Costs will not be adjusted if duration changes)

Deliverables
  • Project design and construction documents

  • Cost estimates at preliminary and final stages

  • Project design timeline with milestones

  • List of subconsultants (if applicable)

  • Final “As Built” drawings (physical + digital)

Terms of Payment
  • Lump sum contract (includes all services and reimbursables)

  • Monthly billing based on percentage completed

  • Payment contingent on DCED disbursement

Compliance RequirementsMBE/WBE Participation Goals
  • MBE: 5%

  • WBE: 3%
    (for projects with CDBG/ESG/HOME funds)

Section 3 Participation (24 CFR Part 75)
  • Applies only to construction contracts over $200,000

  • Engineer should support client’s compliance with:

    • 25% of labor hours = Section 3 workers

    • 5% of labor hours = Targeted Section 3 workers

    • Professional services labor hours may count but must be reported separately

Evaluation Criteria

Quotations will be scored on:

  1. Responsiveness to RFQ

  2. Relevant experience and past performance

  3. Quality of previous work

  4. Resources and track record of timely completion

  5. Cost

  6. Commitment to MBE/WBE participation

Required Documentation
  • Completed Standard Engineering Estimate

  • Minimum of two (2) references (similar projects, last 3 years)

  • MBE/WBE Certification (if applicable)

  • Solicitation & Commitment Statement

  • Professional Liability Insurance coverage limits

Contact for Questions

Tonia Troup
?? ttroup@seda-cog.org
?? (570) 524-4491

Related Links
Attachment Size
RFQ ENGINEERING SERVICES_0.pdf 155.41 KB
Get Government Bids Like This by Email Receive daily bid alerts that match your keywords, business categories, and target regions.

See Also

Facility: David L. Lawrence Convention Center Project: Exterior Loading Dock Roll Door Replacement

Sports & Exhibition Authority of Pittsburgh and Allegheny County (SEA)

Due by 9/22/2026

ABK Daycare (Envision Center) Emergency Egress Project IFB#600-22-26 OPEN The Housing Authority of

Housing Authority of the City of Pittsburgh

Due by 9/30/2026

Follow JP Martha Float Mooring Bitts Retrofit Active Contract Opportunity Notice ID W911WN26CA015

DEPT OF DEFENSE

Homewood North Community Center HVAC Replacement, AMP-20 IFB#600-28-26 OPEN The Housing Authority of

Housing Authority of the City of Pittsburgh

Due by 10/07/2026

* Disclaimer: This website provides information about bids, requests for proposals (RFPs), or requests for qualifications (RFQs) for convenience only and does not serve as an official public notice. Individuals who wish to respond to or inquire about bids, RFPs, or RFQs should contact the relevant government department directly.