| Agency: | San Diego County |
|---|---|
| State: | California |
| Type of Government: | State & Local |
| NAICS Category: |
|
| Posted Date: | Apr 2, 2026 |
| Due Date: | Apr 16, 2026 |
| Solicitation No: | BPM013131 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
| RFx Name: | BPM013131 |
| RFx Begin Date (UTC+0): | RFQ - 2026 OR NEWER/UNUSED PETERBILT 537 XL MECHANIC TRUCK |
| RFx End Date (UTC+0): | 1 |
| Commodities: | 1 |
| RFx Status: | Motor vehicles |
| Solicitation Code: | 4/2/2026 11:15:00 AM |
| Lot #: | 4/16/2026 5:00:00 PM |
| Round #: |
13
d 08 h 41 min 48 s |
|
Code
BPM013131
|
|
RFx Name
RFQ - 2026 OR NEWER/UNUSED PETERBILT 537 XL MECHANIC TRUCK
|
|
Lot #
1
|
|
Round #
1
|
|
RFx Begin Date
4/2/2026 11:15:00 AM
|
|
RFx End Date
4/16/2026 5:00:00 PM
|
|
Summary
|
|
Contact
YK Hou, Procurement Specialist Cell: 619-964-0529 | Yu-Kuang.Hou@sdcounty.ca.gov |
|
Q&A Start Date
(M/d/yyyy)
4/2/2026
11:15:00 AM
|
|
Q&A End Date
(M/d/yyyy)
4/7/2026
5:00:00 PM
|
1 Record(s)
|
| County of San Diego | Date Issued: | April 2, 2026 | |||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| REQUEST FOR QUOTATION | |||||||||||
| (this RFQ is a request for information, not an order) |
County of San Diego Date Issued: April 2, 2026
REQUEST FOR QUOTATION
(this RFQ is a request for information, not an order)
RFQ Number: 13131 CONTRACTING OFFICER:
2026 or Newer Peterbilt 537 XL
RFQ TITLE: Yu-Kuang Hou, Procurement Specialist
Mechanic Truck
QUOTATIONS
April 16, 2025 ;5:00 PM Phone: (619) 964 - 0529
DUE:
QUESTIONS DUE: April 7, 2025 ;5:00 PM Email: Yukuang.Hou@sdcounty.ca.gov
SUBMITTING YOUR QUOTATION: AWARD: Will be based on:
Submit your response, including completed forms via BuyNet EACH ITEM EACH LOT
or via email to the contracting officer listed in this RFQ. TOTAL (ALL ITEMS)
DESCRIPTION
THE COUNTY OF SAN DIEGO IS SEEKING QUOTES FROM QUALIFIED FIRMS (OFFERORS) TO PROVIDE ONE
(1) 2026 OR NEWER PETERBILT 537 XL MECHANIC TRUCK IN ACCORDANCE WITH THE TERMS &
CONDITIONS CONTAINED WITHIN.
SEE THE STATEMENT OF WORK FOR A DETAILED DESCRIPTION OF THE COUNTY'S REQUIREMENTS.
THIS REQUEST FOR QUOTATION INCLUDES AN RFQ SUBMISSION CHECKLIST TO BE COMPLETED BY
OFFERORS.
SUBMITTALS WILL BE EVALUATED BASED UPON PRICE AND PERFORMANCE FACTORS INCLUDING THE
OFFEROR'S EXPERIENCE, QUALIFICATIONS, TECHNICAL APPROACH, ACCEPTANCE OF THE COUNTY'S
DRAFT AGREEMENT, PHYSICAL AVAILABILITY OF VEHICLE, VEHICLE SPECS, AND DELIVERY LEAD
TIME.
COUNTY OF SAN DIEGO
REQUEST FOR QUOTATION (RFQ) 13131 - 2026 OR NEWER PETERBILT 537 XL MECHANIC TRUCK
SUBMISSION CHECKLIST
SUBMISSION CHECKLIST
Submit a completed and signed Offeror's Cover Page (PC600) form
* https://www.sandiegocounty.gov/content/dam/sdc/purchasing/docs/PC600_dpc_Offerors_Cover_Page.pdf
Submit a completed and signed Representations and Certifications form (PC601)
* https://www.sandiegocounty.gov/content/dam/sdc/purchasing/docs/PC601_dpc_Reps_and_Certs.pdf
Submit a completed and signed Small-Local Business Self-Certification Form (PC610)
* All Offerors are encouraged to complete this form to support County data collection.
* https://www.sandiegocounty.gov/content/dam/sdc/purchasing/docs/PC610_dpc_Small_Local_Self_Cert.pdf
Submit a completed and signed Nondisclosure Indemnification Agreement (PC620) (if applicable).
* Required if submitting Confidential/Proprietary Information (see information in Terms and Conditions below)
* https://www.sandiegocounty.gov/content/dam/sdc/purchasing/docs/PC620_dpc_Nondisclosure_Indemnity.pdf
Submit a completed Pricing Schedule.
* (Page 9),
Page 2 of 15
| RESPONSES: Your response is due through electronic upload to BuyNet on the specified close date and time, local San |
|---|
| Diego time. If Offeror is unable to submit via BuyNet for any reason, Offeror may submit by email or mail to the listed |
| Contracting Officer, or by personal delivery to the Purchasing and Contracting front desk. Please use these methods only |
| if unable to submit through BuyNet. If mailed or delivered, the above RFQ No. should be included on the front of the |
| envelope. |
COUNTY OF SAN DIEGO
REQUEST FOR QUOTATION (RFQ) 13131 - 2026 OR NEWER PETERBILT 537 XL MECHANIC TRUCK
TERMS AND CONDITIONS OF REQUEST FOR QUOTATION
RESPONSES: Your response is due through electronic upload to BuyNet on the specified close date and time, local San
Diego time. If Offeror is unable to submit via BuyNet for any reason, Offeror may submit by email or mail to the listed
Contracting Officer, or by personal delivery to the Purchasing and Contracting front desk. Please use these methods only
if unable to submit through BuyNet. If mailed or delivered, the above RFQ No. should be included on the front of the
envelope.
It is the Offeror's responsibility to submit based on the most current RFQ, addenda thereto, responses to Questions, any
other information posted on BuyNet, and any diligence material made available by the County. Offerors are advised to
regularly check BuyNet for information. The County has no obligation to contact Offerors directly with any such RFQ-
related information.
* In order to see all information related to this RFQ, to submit Questions, and to receive notifications of updates,
Offerors must select "Participate in RFx" for this solicitation in BuyNet.
Forms required to be submitted with Offeror's Quotation are included in this RFQ or posted on the County's web site at
https://www.sandiegocounty.gov/content/sdc/purchasing/purchasing-forms.html. Posted forms may be updated from time
to time. Unless otherwise specified, Offerors may submit the version of a form in place as of the date of RFQ issuance or
any later version.
This is a request for information, and quotations furnished are not offers.
QUESTIONS: Please submit questions and requests for clarification related to definition or interpretation of this RFQ in
writing to the contracting officer before the Questions Due date/time listed in this RFQ. Those received after this date
may not be answered at the discretion of the County.
PRICING: The County may award a contract on the basis of initial quotations. Your price(s) should be the lowest
possible for the RFQ requirements. Omit Sales and Use Taxes unless otherwise specified.
The Estimated Quantities in the Pricing Schedule are provided solely for evaluation of quotations. They represent
approximate anticipated use based on historical consumption. If the County's actual requirements do not result in orders
in the quantities described as "estimated" in the Schedule, that fact shall not constitute the basis for price adjustment.
EVALUATION AND AWARD. Quotations are subject to acceptance at any time within 90 days after submission due
date/time, unless otherwise stipulated by the County. This RFQ is an informal negotiated procurement process. Lowest
price may not always be the sole criteria for award of an RFQ. The County reserves the right to waive a variation in
specification if, in the opinion of the County, such variation does not materially change the item or its performance within
parameters acceptable to the County. The County reserves the right to reject any or all quotations and to accept or reject
any item(s) thereon, or waive any informality in the quotation. The County reserves the right to perform a pre-award
survey of the offeror to determine capability to perform, including but not limited to facilities, financial responsibility,
materials/supplies, and past performance. The determination of the County as to an Offeror's prospective ability to
perform the contract shall be conclusive.
SAMPLES: Samples, at Offeror's expense, may be required for evaluation by the County. Delivery of sample must be
scheduled with contracting officer and provided within required timeline. The County shall have the right to review
sample and to determine if such sample is acceptable. The County's decision to award is contingent upon its acceptance
of the products provided in the sample. During the term of the award, the County must approve any substitutions from the
initial sample in writing in advance of substitution. In no event shall the supplier be permitted to increase prices on the
basis of substituted item(s).
Sample, if not destroyed by tests, will, upon request, be returned at Offeror's expense. Offeror must advise contracting
officer at time of sending sample that they must be returned, provide return address and Federal Express account number.
BRAND NAME OR EQUAL: If items called for in this Request for Quotation have been identified in the schedule by a
"brand name or equal" description, such identification is intended to be descriptive, but not restrictive, and is to indicate
the quality and characteristics of products (including products of brand name manufacturer s other than the one described
Page 3 of 15
COUNTY OF SAN DIEGO
REQUEST FOR QUOTATION (RFQ) 13131 - 2026 OR NEWER PETERBILT 537 XL MECHANIC TRUCK
by the brand name) to be considered for award if such products are determined by the County to meet fully the salient
characteristic requirements listed in the request.
Unless the offeror clearly indicates in the quotation that an "or equal" product is being offered, quotation shall be
considered as offering the brand name product specified.
If the offeror proposes to furnish an "equal" product, the brand name, if any, of the product to be furnished shall be
inserted in the space provided in the request for quotation, or such product shall be clearly identified in the quotation. The
evaluation of the quotation and the determination as to equality of the product offered shall be the responsibility of the
County and will be based upon the information furnished by the offeror, or identified in the quotation as well as other
information reasonably available to the purchasing activity. Caution to offerors: the purchasing activity is not responsible
for locating or securing any information which is not identified in the quotation and reasonably available to the purchasing
activity. Accordingly, to insure that sufficient information is available, the offeror must furnish, as part of the quotation,
all descriptive material (such as cuts, illustrations, drawings, or other information) necessary for the purchasing activity to
(i) determine whether the product offered meets the salient characteristic requirements of the request for quotation, and
(ii) establish exactly what the offeror proposes to furnish and what the County is binding itself to purchase by making an
award. The information furnished may include specific references to information previously furnished or to information
otherwise available to the purchasing activity.
If the offeror proposes to modify a product so as to make it conform to the requirements of the Request for Quotation, he
shall (i) include in the quotation a clear description of such modifications and (ii) clearly mark any description to show the
proposed modifications.
DUTY TO INQUIRE: Should the Offeror find discrepancies in or omissions from the RFQ, plans, specifications or other
documents, or should the Offeror be in doubt as to their meaning, the Offeror must at once notify the Buyer, in writing. If
the point in question is not clearly and fully set forth, a written addendum will be issued and emailed to Offerors.
CONFIDENTIAL/PROPRIETARY INFORMATION: If confidential/proprietary is contained within the submission:
1) It must be submitted in a separate file or document marked as EXHIBIT-CONFIDENTIAL/PROPRIETARY;
2) Responses to solicitation requirements that include the confidential/proprietary information, shall refer to the
response contained within the EXHIBIT-CONFIDENTIAL/PROPRIETARY (for example: If submittal
requirement #1 requires staff Social Security Numbers, the response to requirement #1 shall reflect "see response
#1 contained within Exhibit-Confidential/Proprietary"); and
3) It must include a signed Nondisclosure Indemnification Agreement (PC620).
NOTE: As a Public Agency, the County of San Diego must adhere to the California Public Records Act, therefore pricing
cannot be considered confidential/proprietary.
TERMS OF RESULTING CONTRACTS: Any contract(s) resulting from this RFQ will be based upon the Draft
Agreement included in this RFQ. The Statement of Work, Pricing Schedule, and any other exhibits will be added based
upon the successful Offeror's response and successful contract finalization negotiations.
Payment terms are NET 30, unless terms more favorable to the County are included in Offerors quotation. Note: qualified
Small-Local Businesses may be eligible for more advantageous payment terms including NET15, in accordance with
Board Policy B-53 Small-Local Business Policy (SLBP).
AVAILABILITY OF FUNDING: The County's obligation for payment of any contract beyond the current fiscal year
end is contingent upon the availability of funding from which payment can be made. No legal liability on the part of the
County shall arise for payment beyond June 30 of the calendar year unless funds are made available for such performance.
CALIFORNIA REVENUE AND TAXATION CODE SECTION 18662: In compliance with California Revenue and
Taxation code section 18662, if you are a non resident of California (out-of-state invoices) who receives California source
income, the County will pay California Use Tax directly to the State of California per permit no. SR FH 25-632384.
Fifteen (15) business days prior to the first payment, new suppliers or suppliers with expired forms or forms with incorrect
information, must submit new forms to the County (forms are available from the Franchise Tax Board website listed
below).
Page 4 of 15
COUNTY OF SAN DIEGO
REQUEST FOR QUOTATION (RFQ) 13131 - 2026 OR NEWER PETERBILT 537 XL MECHANIC TRUCK
Under certain circumstances you may be eligible for reduced or waived nonresident withholding. If you have already
received a waiver or a reduced withholding response from the State of California and the response is still valid, submit the
response to the County in lieu of the forms. Failure to submit the required forms will result in withholding of payments.
Refer to the Franchise Tax Board websites (listed below) for tax forms and information on nonresident withholding,
including waivers or reductions. The County will not give you any tax advice. It is recommended you speak with your tax
adviser and/or the State of California for guidance.
Franchise Tax Board Websites:
https://www.ftb.ca.gov
https://www.ftb.ca.gov/forms/search/
/
/
/
Page 5 of 15
COUNTY OF SAN DIEGO
REQUEST FOR QUOTATION (RFQ) 13131 - 2026 OR NEWER PETERBILT 537 XL MECHANIC TRUCK
STATEMENT OF WORK
1. BASE VEHICLE
1.1 2026 or newer Peterbilt 537
1.1.1 White
1.1.2 DRW
1.1.3 Standard Cab
1.1.4 4X2
1.1.5 Allison 3000 RDS
1.1.6 8.9 PX-9 Paccar 350HP
1.1.7 11R 22.5 Tires
1.1.8 Meets all CA Compliances
2. OUTFITTING (FINAL INSTALL LOCATIONS TO BE PLANNED WITH VENDOR AND DEPARTMENT
COORDINATOR)
2.1 One (1)14 foot aluminum mechanics body. Stellar TMAX2-14 or equivalent
2.1.1. Cabinet #1 driver side:
2.1.1.1. One (1) Drawer set. Approximately 46'Hx32W'x18D'
2.1.1.1.1. Eight (8) 3" drawers
2.1.1.1.2. Two (2) 5" drawers
2.1.1.1.3. One (1) 7" drawer
2.1.1.2. Three (3) Shelfs with Three (3) dividers. Approximately 16.5"x19"
2.1.1.3. One (1)Light bar installed inside of cabinet
2.1.2. Cabinet #2 driver side:
2.1.2.1. Three (3) Shelfs with Three (3) dividers. Approximately 35"W x 19"D
2.1.3. Cabinet # 3 driver side:
2.1.3.1. One (1) Shelf with 3 dividers. Approximately 52 " W x 19" D
2.1.3.2. One (1) Light bar installed inside of cabinet
2.1.4. Cabinet # 4 driver side:
2.1.4.1. Three (3) Shelfs with Three (3) dividers. Approximately 23"W x 19"D
2.1.5. Cabinet # 1 passenger side:
2.1.5.1. One (1) 2 bottle oxy-accent holder
2.1.5.2. Divider kit with sturt mounted shelves 19" wide for oxy-accent holder
2.1.6. Cabinet # 2 passenger side
2.1.6.1. Three (3) Shelfs with Three (3) dividers. Approximately 31"W x 19"D
2.1.7. Cabinet #3 passenger side:
2.1.7.1. Three (3) Shelfs with Three (3) dividers. Approximately 18"W x 19" D
2.1.8. Cabinet # 4 passenger side:
2.1.8.1. One (1) Shelf with three (3) dividers. Approximately 52"W x 19"D
2.1.9. Cabinet # 5 passenger side
2.1.9.1. One (1) 12" x 50 ' hose reel, exiting out of rear of truck body.
2.1.10. Spray on bed liner for load bed walls,floor and work bench bumper
2.1.11. Rock Guard kit
2.1.12. Black grab handle mounted to rear side pack and bumper
2.1.13. Slide out step for TMAX work bench bumper
2.1.14. Vise mounting plate
2.1.14.1. One (1)12,000-lb capacity crane with 30 foot of reach. Stellar 12630 or equivalent. Installed on passenger side
rear of mechanics body
2.1.14.1.1. Hydraulic pump, tandem section for crane and compressor.
2.1.14.2. One (1) 46 HP hydraulic driven air compressor. Output of 46 CFM @ 175 PSI. Installed on top driver side
of mechanics body.
2.1.14.3. One (1) 22 gallon air tank
2.1.14.4. One (1) 35 gallon Hydraulic reservoir, bulkhead mounted
2.1.14.5. One TMAX aluminum Tailgate with 12" tail.
2.1.14.6. Generic hot shift PTO
2.1.14.6.1. Hydraulic pump, tandem section for crane and compressor
Page 6 of 15
COUNTY OF SAN DIEGO
REQUEST FOR QUOTATION (RFQ) 13131 - 2026 OR NEWER PETERBILT 537 XL MECHANIC TRUCK
3. OTHER REQUIREMENTS AND DELIVERY
3.1 Contractor shall register the vehicles in CA. Exempt with the Department of Motor Vehicles and provide a temporary
license plate as per California law. DMV registration shall be made out to:
County of San Diego
5560 Overland Ave. Suite 410
San Diego, CA. 92123
3.2 Contractor shall provide updates to their Fleet Services Acquisitions Team with a status update 30, 60, 90, and 120 days
after reception of the purchase order.
3.3 Price shall be honored throughout the duration of the executed contract.
3.4 Contractor agrees that a vehicle or equipment warranty shall not start until vehicle or equipment is assigned for use by a
County of San Diego Department. Contractor shall not start the warranty of the vehicle or equipment upon delivery of the
vessel, but upon confirmation of the assignment of vehicles or equipment. The County shall provide Contractor notification
to start the warranty on the vehicle once the vehicle is assigned.
3.5 If Contractors have any questions, comments, or concerns with the fulfillment of a PO, please reach out to the Fleet general
inbox: DGSFleetAcquisitions@sdcounty.ca.gov
4. DELIVERY
4.1 Delivery of purchased vehicle must occur no later than 120 days after receipt of purchase order.
4.2 Contractor shall provide an actual delivery date within 30 days of the execution of the purchase order. Failure to provide
accurate delivery dates within 30 days, may result in termination of this purchase order.
4.3 Contractor must provide at least a 48 Hour notice to the Fleet Services Analyst Team member on the original purchase order
and delivery must occur Monday-Friday between 8am-3pm. Without this 48-hour notice, Fleet Services has the right to
reject the delivery of the vehicle. In some instances, an alternate delivery location may be required to accommodate
oversized equipment with no additional fee.
4.4 Contractor must notify the Fleet Services Contract and Lead Time Analyst if they anticipate a vehicle delivery will go over
15 calendar days past the contracted lead time. One email must be sent to the Fleet Services Acquisitions inbox to request
for a one-time lead time extension. This email must include the following to be considered for an extension of the lead time:
PO Number, justification for the delays in the lead time delays, a mitigation plan to remedy the issue of acquiring a vehicle,
a new lead time, and an estimated date for delivery. The email to request an extension is:
DGSFleetAcquisitions@sdcounty.ca.gov.
4.5 Contractor must provide all equipment necessary to drop off vehicles or parts to Fleet Services. This includes the delivery of
vehicles and any specialized equipment to any of Fleet Services Garages. Contractor must provide all work and equipment
needed to transfer the ordered part from the transport vehicle to the Fleet Services desired location for storage. Equipment
that is dropped off must be left in a location that is approved by a Fleet Services Team Leader or shop supervisor.
4.6 All additional outfitting on the contract must be completed and installed on the vehicle prior to delivery. The vehicle must
also come with all of the keys required on the Purchase Order. If any outfitting, keys, or other materials on the original order
are missing, the County of San Diego may not be able to accept the vehicle upon delivery.
4.7 Vehicles must be fully functional, new, and have no errors messages on the dashboard when vehicle and title is handed over
to the County of San Diego. All vehicles handed over to the County of San Diego with any defects related to the
functionality of the vehicle, must be mitigated by the Contractor within 14 calendar days of the identification of the defect.
This includes but is not limited to: Vehicle warning indicators on, issues with the vehicle dashboard, defects in the exterior
not originally identified by the Contractor, issues that occur after outfitting the vehicle, etc. Contractor will be responsible
for the full costs of the repairs of the vehicle and must hand over the vehicle within 14 calendar days.
4.8 Gas or diesel vehicles delivered to the County of San Diego must arrive with a full tank of fuel (90% fueled or above) and
EVs must arrive fully charged (80% charge or above). Any vehicle that is handed over to the County of San Diego that do
not meet these standards, are subject to not be accepted at vehicle handoff.
4.9 Contractor must deliver vehicles with no third-party GPS added to any County of San Diego Purchase Order vehicle or
equipment. Any units with GPS installed may not be able to be accepted and will not fulfill obligations for the fulfillment of
a County PO. When a GPS is found in a vehicle, the Contractor must remove the GPS within 3 calendar days.
4.10 Contractors must provide all applicable vehicle DMV documentation at the time of delivery. With proper justification, the
Contractor may get a Fleet Service Technicians approval to send the documents within 24 hours of vehicle delivery. This
includes temporary paper license plates, registration, and any additional DMV documents required.
4.11 Contractor must provide the Manufacturer Statement of Origin (MSO) or Manufacturer Certificate of Origin (MCO) for
vehicles and equipment manufactured outside the state of California within 7 days of vehicle delivery. If a Contractor is
unable to guarantee the delivery of these documents within this timeframe, proper justification must be provided to the Fleet
Services Technician assigned to the delivery of the order.
4.12 Contractor is responsible for any damages to items prior to Fleet Services acceptance of the item.
Page 7 of 15
COUNTY OF SAN DIEGO
REQUEST FOR QUOTATION (RFQ) 13131 - 2026 OR NEWER PETERBILT 537 XL MECHANIC TRUCK
4.13 Delivery location unless stated otherwise is:
County of San Diego, DGS Fleet Services
5610 Overland Ave
San Diego, CA 92123
5. INVOICE INFORMATION
5.1 All invoices and monthly statements shall be submitted by email to DGSfleetinvoices@sdcounty.ca.gov
5.2 All invoices must include the following information:
5.2.1 Business Contact Person
5.2.2 Business Name, Location, and Address
5.2.3 Quote Number
5.2.4 Purchase order number
5.2.5 Manufacturer Vehicle Identification Number (VIN)
5.2.6 Vehicle year, make, and model.
5.2.7 Vehicle mileage at time of handoff to the County of San Diego
5.2.8 Quantity, Description, Unit Price and Extended Price must match purchase order
5.2.9 County of San Diego Fleet drop-off location service facility, address, and telephone number.
5.2.10 Invoices must be submitted individually via email
Page 8 of 15
| Item | Description | Taxable | Estimated Quantity | Unit of Measure | Unit Price | Extended Price |
|---|---|---|---|---|---|---|
| 1 | 2026 or Newer/Unused Peterbilt 537 XL Mechanic Truck | Yes | 1 | Each | $ | $ |
| 2 | Outfitting Parts | Yes | 1 | Each | $ | $ |
| 3 | Outfitting Labor | No | 1 | Each | $ | $ |
| 4 | Tire Fee | No | 6 | Each | $1.75 | $ |
| 5 | CA DMV Electronic Vehicle Registration | No | 1 | Each | $37.00 | $ |
| 6 | Document Processing Fee | Yes | 1 | Each | $85.00 | $ |
| Total Price | $ |
COUNTY OF SAN DIEGO
REQUEST FOR QUOTATION (RFQ) 13131 - 2026 OR NEWER PETERBILT 537 XL MECHANIC TRUCK
PRICING SCHEDULE
Estimated Unit of
Item Description Taxable Unit Price Extended Price
Quantity Measure
2026 or Newer/Unused Peterbilt 537 XL
1 Yes 1 Each $ $
Mechanic Truck
2 Outfitting Parts Yes 1 Each $ $
3 Outfitting Labor No 1 Each $ $
4 Tire Fee No 6 Each $1.75 $
5 CA DMV Electronic Vehicle Registration No 1 Each $37.00 $
6 Document Processing Fee Yes 1 Each $85.00 $
Total Price $
PRICING MUST INCLUDE SHIPPING AND ANY ADDITIONAL FEES.
DO NOT INCLUDE SALES TAX WITH PRICING.
DEPARTMENT REQUESTED LEAD TIME: 120 days.
QUOTED LEAD TIME (DAYS)*: _____________________
*Lead time is the number of calendar days from when a Purchase Order is issued, or contract is fully executed to when a
Contractor proposes the physical delivery of a vehicle and title to the County of San Diego.
QUOTED VEHICLE IS IN PHYSICAL STOCK FOR IMMEDIATE DELIVERY?
YES: ______ OR NO: _______
If yes, provide quantity of physical stock available for immediate delivery: ___________
Where is available stock located? ____________
QUOTED VEHICLE IS SUBJECT TO ORDER PLACEMENT WITH MANUFACTURER?
YES: ______ OR NO: _______
IF YES, ESTIMATED MANUFACTURER CONFIRMATION DATE: __________________
CONFIRMATION OF DELIVERY: Offeror commits, at no additional cost to the county, to provide a newer year model
or added value/premium existing year model in the event the proposed lead time is not fulfilled after the issuance of a county
purchase order or contract.
YES: ______ OR NO: ______
Page 9 of 15
| FOR COUNTY: | FOR CONTRACTOR: |
|---|---|
| Kierra Ceasar-Thompson, Administrative Analyst III Department of General Services, Fleet Division 5560 Overland Avenue Suite 410 San Diego, CA 92123 Phone: (619) 372-2110 email: kierra.ceasar-thompson@sdcounty.ca.gov Above contact is designated as the Contracting Officer's Representative for this Agreement ("COR"). Additional DGS Contact for Specifications/Build: Anthony Cusano, Fleet Standards Technician Phone: (619) 782-5429 email: anthony.cusano@sdcounty.ca.gov | #Name and Title #Address #Address #Phone, FAX, and email |
COUNTY OF SAN DIEGO
REQUEST FOR QUOTATION (RFQ) 13131 - 2026 OR NEWER PETERBILT 537 XL MECHANIC TRUCK
DRAFT AGREEMENT
This agreement ("Agreement") is made and entered into effective as of the date of the last signature on the signature page by and
between the County of San Diego, a political subdivision of the State of California ("County") and [# enter full title of legal entity,
type of entity and location (e.g. "a Delaware corporation," "a California limited liability company"), located at (complete
address)] ("Contractor"). For valuable consideration, the receipt and sufficiency of which are hereby acknowledged, the parties
agree as follows:
1. Agreement. The Agreement shall consist of this document, Exhibit A Statement of Work, Exhibit B - Insurance Requirements,
and Exhibit C Payment Schedule. In the event of a conflict between any provisions of this Agreement, the following order of
precedence shall govern: First (1st) this document; Second (2nd) Exhibit B; Third (3rd) Exhibit A; Fourth (4th) Exhibit C.
2. Term. This Agreement shall begin on the date of the last signature below and end upon completion and County acceptance of
Contractor's performance under this Agreement.
3. Standard of Performance. Contractor shall, in good and workmanlike manner and in accordance with the highest professional
standards, at its own cost and expense, furnish all of the labor, technical, administrative, professional and all other personnel, all
supplies and materials, equipment, printing, transportation, training, facilities, and all other means whatsoever, except as herein
otherwise expressly specified to be furnished by County, necessary or proper to perform and complete the work and provide the
services required of Contractor by this Agreement. To the extent not in conflict with Exhibits A and A-1, Contractor shall
perform all work under this Agreement in strict conformance to its bid, included herein by this reference, unless Changed in
accordance with this Agreement.
4. Payment. Pursuant to Exhibit C, and other applicable provisions of this Agreement, County agrees to pay Contractor a sum not
to exceed [# write out amount] ($######) ("Maximum Agreement Amount").
Payment terms are, unless otherwise specified by County, thirty (30) days from the later of: (i) performance of work under the
Agreement entitling Contractor to payment, or (ii) County receipt of a correct and substantiated invoice. Payment shall be
deemed to have been made on the date that County submits electronic payment or mails a warrant or check.
5. Sales and Use Tax. On invoices, Contractor shall show any sales or use tax as separate items, giving permit number authorizing
collection of use tax. Contractor shall deduct any cash discount before computing sales or use Tax.
6. Contracting Officer. The Director of the Department of Purchasing and Contracting or designated Department of Purchasing and
Contracting official is the contracting officer for this Agreement ("Contracting Officer").
7. Notices. Notice to either party shall be in writing and personally delivered; sent by certified mail, postage prepaid, return receipt
requested; or emailed to the County's or Contractor's representative designated below (or such party's authorized
representative). Any such notice shall be deemed received by the party (or such party's authorized representative) on the
earliest of the date of personal delivery, three (3) business days after deposit in the U.S. Mail, or upon sending of an email from
which an acknowledgement of receipt has been received other than an out of office, unavailable, or undeliverable reply.
FOR COUNTY: FOR CONTRACTOR:
Kierra Ceasar-Thompson, Administrative Analyst III #Name and Title
Department of General Services, Fleet Division #Address
5560 Overland Avenue Suite 410 #Address
San Diego, CA 92123 #Phone, FAX, and email
Phone: (619) 372-2110
email: kierra.ceasar-thompson@sdcounty.ca.gov
Above contact is designated as the Contracting Officer's
Representative for this Agreement ("COR").
Additional DGS Contact for Specifications/Build:
Anthony Cusano, Fleet Standards Technician
Phone: (619) 782-5429
email: anthony.cusano@sdcounty.ca.gov
8. Compliance with Laws. Contractor shall at all times perform its obligations hereunder in compliance with all applicable federal,
State, and local laws, rules, and regulations, current and hereinafter enacted, including facility and professional licensing and/or
certification laws, and keep in effect any and all licenses, permits, notices and certificates as are required. Contractor shall
Page 10 of 15
With Free Trial, you can:
You will have a full access to bids, website, and receive daily bid report via email and web.
current rfqs due date for bid package please contact RFQ 2703 - Rodder
East Bay Municipal Utility District
Bid Due: 8/05/2026
RFx Name: BPM013309 RFx Begin Date (UTC+0): RFQ - 2026 OR NEWER/UNUSED FORD
County of San Diego
Bid Due: 8/19/2026
GFO-25-608 - Electric Vehicle Hub, Outreach, Messaging, and Equipment (EV HOME) Solicitation Type
California Energy Commission
Bid Due: 8/25/2026
270000910004,RFB,38,1 - 15 PASSENGER FEMA SUPPORT VAN Status Stage Open Posted 7/22/2026 Bid
City of Los Angeles
Bid Due: 8/12/2026