| Agency: | Tennessee Tech University |
|---|---|
| State: | Tennessee |
| Type of Government: | State & Local |
| NAICS Category: |
|
| Posted Date: | Apr 30, 2026 |
| Due Date: | May 26, 2026 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
| Due Date | Description | Purchasing Contact |
|
5/26/2026 |
| Note: The Percentage of Work listed below are estimates ONLY do not a guarantee of work. | ||||||
|---|---|---|---|---|---|---|
| Item Number | % of Work | Description | Unit of Measure | Unit Cost | ||
| 1-500 | 501-2000 | 2001+ | ||||
| 1 | 5 | Removal of Existing Resilient Tile (Non-asbestos) | sq. ft. | |||
| 2 | 5 | Removal of Existing Base | linear ft. | |||
| 3 | 3 | Floor Preparation ** | sq. ft. | |||
| 4 | 1 | Provide moisture testing for slab*** | each | |||
| 5 | 5 | Installation of New Vinyl Composition Tile* | sq. ft. | |||
| 6 | 10 | Installation of New Luxury Vinyl Tile or Vinyl Plank* | sq. ft. | |||
| 7 | 10 | Installation of New Linoleum Tile* | sq. ft. | |||
| 8 | 2 | Installation of New Linoleum or Vinyl Sheet Goods* | sq. ft. | |||
| 9 | 1 | Heat welding seams in sheet good products | linear ft. | |||
| 10 | 15 | Installation of standard 4" Rubber Base | linear ft. | |||
| 11 | 2 | Installation of specialty or Millwork Rubber Base 6" max. ht. | linear ft. | |||
| 12 | 2 | Installation of Transition Strips | linear ft. | |||
| 13 | 5 | Installation of New Broadloom Jute or Action Back**** | sq. ft. | |||
| 14 | 5 | Installation of New Carpet Tile | sq. ft. | |||
| 15 | 2 | Installation of Quarter Round or Shoe Mold | linear ft. | |||
| 16 | 2 | Removal of Quarter Round or Shoe Mold | linear ft. | |||
| 17 | 5 | Removal of Existing Carpet | sq. ft. | |||
| 18 | 10 | Skilled Labor | hourly | |||
| 19 | 10 | Unskilled Labor | hourly |
Bid Cost Sheet
Note: The Percentage of Work listed below are estimates ONLY do not a guarantee of work.
Item
% of Work Description Unit of Measure Unit Cost
Number
1-500 501-2000 2001+
1 5 Removal of Existing Resilient Tile (Non-asbestos) sq. ft.
2 5 Removal of Existing Base linear ft.
3 3 Floor Preparation ** sq. ft.
4 1 Provide moisture testing for slab*** each
5 5 Installation of New Vinyl Composition Tile* sq. ft.
6 10 Installation of New Luxury Vinyl Tile or Vinyl Plank* sq. ft.
7 10 Installation of New Linoleum Tile* sq. ft.
8 2 Installation of New Linoleum or Vinyl Sheet Goods* sq. ft.
9 1 Heat welding seams in sheet good products linear ft.
10 15 Installation of standard 4" Rubber Base linear ft.
11 2 Installation of specialty or Millwork Rubber Base 6" max. ht. linear ft.
12 2 Installation of Transition Strips linear ft.
13 5 Installation of New Broadloom Jute or Action Back**** sq. ft.
14 5 Installation of New Carpet Tile sq. ft.
15 2 Installation of Quarter Round or Shoe Mold linear ft.
16 2 Removal of Quarter Round or Shoe Mold linear ft.
17 5 Removal of Existing Carpet sq. ft.
18 10 Skilled Labor hourly
19 10 Unskilled Labor hourly
* Unit pricing shall include basic pattern work that uses multiple colors. Bid prices includes cutting and installing tile into doorways and niches as required. Bid prices does
not include graphics, logos, or intricate patterns which will be billed hourly to be pre-approved by the appropriate Tennessee Tech personnel in writing. All flooring
installations shall be warrantied for workmanship and installation for a minimum of one (1) year from date of install.
** Floor preparation may include floor leveling, skimming, grinding, etc., rountine sweeping and vacuuming shall not be considered floor preparation and shall be included in
the installation unit pricing. Any additional floor prep shall be approved by the Project Manager prior to commencement of work.
*** Moisture tests to be provided and implemented by Contractor upon request by Tennessee Tech.
**** The above rates should include the cutting and transporting of new carpet to the installation site and the return of any remnants (as applicable), adhesives, base, etc. to
Tennessee Tech warehouse facility
Note: Square footage pricing is for actual square footage measurement of the room or space, not the quanitity of materials provided. Overages will be provided in material
supplied by Tennessee Tech. Remaining materials should be returned to the warehouse after completion of the installation.
With Free Trial, you can:
You will have a full access to bids, website, and receive daily bid report via email and web.
Form Details (Abstract): RFQ 1803636 Status Active Document PDF File Abstract Negotiation Number
Memphis Light
Bid Due: 7/28/2026
Event 34101-13953 Terms and Conditions Specifications Route 07/14/2026 08/14/2026 Fence/Gate Installation - Lenoir
State Government of Tennessee
Bid Due: 8/14/2026
Basic Information Negotiation BID1000278 Title UT AgResearch-Wholesale Auto Dealerships Negotiation Type RFQS Status
The University of Tennessee
Bid Due: 8/03/2026
Negotiation Title Negotiation Type Status Posting Date Open Date Close Date Details MNPS000057,2
Metro Nashville Public Schools
Bid Due: 8/04/2026