RFQ #26-026 Building Commissioning Services

Agency: Wake County
State: North Carolina
Type of Government: State & Local
NAICS Category:
  • 541330 - Engineering Services
  • 541350 - Building Inspection Services
  • 541690 - Other Scientific and Technical Consulting Services
Posted Date: May 21, 2026
Due Date: Jun 18, 2026
Solicitation No: RFQ #26-026
Original Source: Please Login to View Page
Contact information: Please Login to View Page
Bid Documents: Please Login to View Page

RFQ #26-026 Building Commissioning Services

RFQ #26-026 Building Commissioning Services - WC Detention Center Phase 3 Expansion and WC GSA Facility

Due Date/Time: June 18, 2026 by 2:00 pm

Contact: Sarah Kahr Richter sarah.kahrrichter@wake.gov

Attachment Preview

BUILDING COMMISSIONING SERVICES FOR WAKE COUNTY PROJECTS:
WAKE COUNTY DETENTION CENTER PHASE 3 EXPANSION AND
NEW WAKE COUNTY GSA FACILITY
REQUEST FOR QUALIFICATIONS - RFQ #26-062
May 22, 2026

REQUEST FOR QUALIFICATIONS
FOR
BUILDING COMMISSIONING SERVICES FOR WAKE COUNTY PROJECTS:
WAKE COUNTY DETENTION CENTER PHASE 3 EXPANSION AND
NEW WAKE COUNTY GSA FACILITY
Table of Contents
Section Page
I. Project 3
II. Project Summary 3
III. Request 3
IV. Firm Qualifications 5
V. Scope of Work 5
VI. Project Budget 7
VII. Project Schedule 7
VIII. Proposal Format Requirements 7
IX. Selection of Building Commissioning Firm 9
X. Evaluation Criteria 10
XI. Submission of Proposals 10
XII. Professional Services Agreement 10
XIII. General Comments 10
XIV. Confidentiality of Documents 12
Page 2 of 12

I. Project
Wake County Detention Center Phase 3 Expansion and Wake County New GSA Facility
II. Project Summary
Wake County Detention Center Phase 3 Expansion:
Wake County Detention Center is located at 3301 Hammond Road in Raleigh, North Carolina. The last
facility expansion was in 2012 with the completion of the Wake County Detention Center Phase
2 Expansion. Wake County Government is planning for the construction of a Phase 3 Expansion to the
facility to meet the need for current and projected additional detention housing capacity.
Phase 3 is anticipated to be approximately 220,000 square feet. This new phase is proposed to provide 10
new housing units on three separate levels, creating a 600 "wet cell" beds, with some housing units
containing sub dayrooms. This phase will also provide some additional program spaces. Phase 3 will also
include construction of a new central plant to provide chilled water and heating water to the Phase 3 building
area and a secondary connection to the existing facility central plant for added redundancy and resiliency.
The existing detention facility will provide kitchen, laundry, and medical services for the new housing -
these functions are not included in the facility expansion.
Wake County New GSA Facility:
Wake County Government is planning the construction of a new General Services Administration (GSA)
facility and redevelopment of the Wake County Office Park on Carya Drive in east Raleigh. The project
will redevelop the Office Park by demolishing multiple aging existing buildings onsite and constructing
new facilities that more effectively utilize the County-owned site and resources.
The project will be phased and includes the demolition of multiple existing buildings and construction of a
facility. This facility will house the relocated General Services Center from its current location in downtown
Raleigh and Library Administration Building from its current location onsite.
The new GSA and LAB combined facility will be placed at the northeast portion of the site near Civic Blvd
to align new fleet maintenance and loading dock functions with adjacent areas of light industrial properties.
The two-story facility will house administrative offices and meeting rooms, warehouses, shop spaces,
training spaces, locker rooms, loading dock, vehicle storage, and support spaces in approximately 265,000
SF of enclosed floor space.
III. Request
Wake County Government requests qualifications from commissioning firms for providing building
systems and envelope commissioning services required to satisfactorily complete the design, construction,
post occupancy and warranty period of the two projects. Anticipated systems to be commissioned include
the following:
Page 3 of 12

* Building envelope, leak, air infiltration, and infrared thermography testing.
* Chilled water system (chiller, pumps, variable frequency drives (VFD) piping, valves,
* Hot water system (boilers, pumps, piping, valves).
* Air handling units (supply fans, return fans, coils, valves, variable frequency drives (VFD), duct
dampers, filters.
* Air distribution system.
* Hydronic Piping System (including tanks and air separators)
* Packaged air conditioning or split system heat pump units (supply fans, return fans, coils valves,
VFD, duct, dampers, compressors, condensers).
* Gas furnaces.
* Terminal boxes.
* Exhaust Fans.
* Roof Hoods.
* Fan Coil Units.
* Refrigeration Systems
* Chemical Treatment.
* Monitor Test and Balancing.
* Building Management and Controls System.
* Domestic Water System (water heaters, pumps, valves, hot and cold water piping).
* Gas Piping.
* Storm water collection/drainage systems (including roof drain system)
* Sump pumps.
* Power Distribution System.
* Lighting Controls and occupancy sensors.
* Utility Switchgear and Transformer.
* Electrical Distribution Panel board.
* Grounding System.
* Low voltage systems.
* Emergency Generator
* Automatic Transfer Switch
* Fire alarm system.
* Security System.
* Audio/Video Systems
* Fire Protection Systems.
Additionally, the following specialty systems are expected to be included in the building commissioning
scope for the Wake County Detention Center Phase 3 Expansion and/or New Wake County GSA Facility
Projects:
Page 4 of 12

* Special Inspection of Smoke Control Systems for I-3 Occupancy under North Carolina Building
Code Section 909 Requirements
* Water Management Systems for Detention Facilities
* Fluid Distribution Systems and other Specialty Systems for Vehicle Maintenance Repair Facilities
IV. Firm Qualifications
The commissioning firm and proposed staff to be assigned responsibilities must be highly qualified and
experienced in all phases of commissioning in similar public facilities and acted as a principal
Commissioning Provider for at least three (3) years with a minimum of three (3) projects of minimum size
100,000 sf. In addition, the commissioning firm must have a minimum of five (5) full years of extensive
experience in building envelope testing, infrared thermography, the operation and trouble-shooting of
HVAC, Electrical, Plumbing, and Building Controls Systems, be knowledgeable in building operation and
maintenance including O&M training and testing and balancing of air and water systems.
The firm and staff must have proven capability to effectively and efficiently manage projects of similar
complexity and have excellent verbal, writing and communication skills. Membership with the Building
Commissioning Association will be considered a plus. Staff maintaining a bachelor's degree in mechanical
or electrical engineering is strongly preferred, however, other technical training, past commissioning, and
field experience will be considered.
V. Scope of Work
A. Design Phase
1. Conduct Cx scoping/kickoff meeting with Owner and design team to review the
commissioning process.
2. Facilitate development and documentation of the Owner's Project Requirements (OPR).
3. Review the Basis of Design (BoD) document for compliance with the OPR.
4. Develop a Cx Plan.
5. Review Design Development, Construction Document submittals and perform final
backcheck of 100% Construction Documents.
6. Prepare Cx specifications for inclusion into the CD specifications.
B. Construction Phase
1. Develop the construction phase commissioning plan including scope and schedule.
2. Plan and conduct commissioning meetings as needed and distribute minutes.
3. Obtain and review additional information required to perform commissioning tasks,
including O&M materials, contractor start-up, control sequence, and checkout procedures.
4. Obtain, review, and approve Contractor submittals applicable to systems being
Page 5 of 12

commissioned for compliance with commissioning needs (concurrent with the A/E reviews
to prevent project delays).
5. Review and respond to requests for information and change orders for impact on
commissioning and owner's objectives.
6. Review coordination drawings to ensure that trades are making a reasonable effort to
coordinate.
7. Write and distribute construction checklists for commissioned equipment.
8. Develop an enhanced start-up and initial systems checkout plan with contractors for
selected equipment.
9. Witness and document mechanical systems piping pressure testing and duct works pressure
testing.
10. Document systems startup by reviewing start-up reports and by selected site observation.
11. Approve air and water systems balancing by spot testing, and by reviewing completed
reports and by selected site observation.
12. Coordinate the special inspection process for Smoke Control systems. This includes, but is
not limited to - assisting contractor in incorporating into schedule, defining roles and
responsibilities, developing Special Inspection Plan, review smoke control submittals and
shop drawings for compliance with design requirements, prepare testing procedures,
coordinate, witness, and document special inspections, backcheck deficiencies, and
provide a report per 909.18.8.3 of the North Carolina Building Code to be reviewed and
signed by the responsible registered design professional.
13. Coordinate, witness and document manual functional performance tests performed by
installing contractors, analyze functional performance trend logs and monitoring data to
verify performance.
14. Review equipment warranties to ensure that the Owner's interests are protected, and
responsibilities of the parties are clearly defined.
C. Post Construction Phase
1. Finalize the Cx services in a single comprehensive record with commissioning records to
the following:
a. Executive summary Report.
b. Listing of non-compliance items with recommendations for correction.
c. Commissioning team directory
d. Cx Plan
e. Owner's Project Requirements
f. Basis of Design
g. Cx Issues Logs
h. Cx Specifications
i. Meeting minutes
2. Develop and provide systems manual in electronic format, including single line diagrams,
Page 6 of 12

as-built sequence of operations, control drawings, and original set points.
D. Warranty Period
1. Conduct opposite season/deferred testing for systems that could not be fully tested during
the season in which final testing was performed.
2. Perform a single calendar site visit ten months after substantial completion with the
Owner's O & M staff, and facility occupants, and provide a written plan with
recommendations for resolution of outstanding commissioning related issues.
VI. Project Budget
The Wake County Detention Center Phase 3 Expansion total Project Budget is approximately $200M.
The Wake County New GSA Facility Project total Project Budget is approximately $110M.
VII. Project Schedule
The milestone project schedules are copied below:
Wake County Detention Center Phase 3 Expansion
Design Development: Summer 2026
Construction Documents: Fall 2026
Permitting Approvals & Bidding: Spring 2027
GMP Issuance & Construction NTP: Summer 2027
Building Systems Completion: Fall 2029
Opening: Early 2030
Wake County New GSA Facility Project
Design Development: Winter 2026
Construction Documents: Summer 2027
Permitting Approvals & Bidding: Summer 2027
GMP Issuance & Construction NTP: Fall 2027
Building Systems Completion: Early 2029
Opening: Fall 2029
VIII. Proposal Submission Requirements
All responses shall be submitted on 812" x 11" paper, side bound portrait format with Table of Contents and
reference tabs for key sections. The total submittal shall not exceed either twenty (20) double-sided or forty
(40) single-sided pages with text, consecutively numbered (front/back covers, cover letter, Table of
Contents and Tab pages are excluded from these totals). All materials not clearly labeled "Trade Secret"
shall become property of Wake County and will be considered public documents (Reference section XIII -
Confidentiality of Documents"). The printed font shall be no less than 10pt. with minor exceptions for
Page 7 of 12

margin text. Please also provide a single electronic copy (PDF preferred) of the response in addition to the
hard copies. Submittals must include responses to each of the following:
A. Letter of Interest
Letter of interest including information about the commissioning firm such as history/background, years
of service, number of employees, number of locations, certifications, professional memberships, and
other relevant information which the consultant believes to be of importance.
B. Project Organization and Staffing of Commissioning Team
Provide the following:
1. Organization chart listing all assigned staff including job titles.
2. Detailed resumes of all assigned staff with list of completed projects and years of experience.
3. Description of responsibilities to be fulfilled by each assigned staff member.
C. Experience
Provide summary of at least four (4) representative projects for which the commissioning firm was
responsible. Each of the project summaries shall include the following;
1. Description of facility or project, actual project cost, and year completed,
2. Description of services provided,
3. List of staff assigned to the project,
4. Degree of involvement (prime or associate),
5. Principal and associate staff involved along with their assigned responsibilities, and
6. References including names, addresses (including e-mail addresses) and telephone numbers.
D. Questionnaire
Provide the following:
1. Describe your experience providing commissioning services on a project where the Construction
Management at Risk Delivery method was employed.
2. Describe the team's approach to maintenance considerations in the commissioning process
during the design and construction phases of a project.
3. Describe in steps which will be taken by your firm to guard the Owner against defects and
deficiencies in the work of the contractors during the construction phase.
4. How do you handle discrepancies that arise during the functional testing phase?
5. What tools or software do you use to document commissioning activities and track issues?
6. Describe your firm's experience with commissioning smoke control systems.
7. Describe your firm's experience with commissioning Fluid Distribution Systems and other
Specialty Systems for Vehicle Maintenance Repair Facilities
Page 8 of 12

8. Explain how your firm will support project close out in a manner that quickly results in a quality
start-up and 100% compliance with equipment operational parameters?
E. Consultant Professional Fees, Litigation, and Workload
1. Submit an hourly billing rate schedule for all personnel by job title who will work with the
County in providing professional services for this project. Provide firm's unit costs schedule.
2. List any pending or settled lawsuits, mediation, or arbitration cases in which the firm was
involved during the past ten (10) years.
3. List current and proposed projects including man-hour estimates, scheduled completion dates,
and assigned team members. Provide workload chart indicating monthly commitments of team
members for next twelve months.
IX. Selection of Building Commissioning Firm
A. Process
Procedures similar to those followed by Wake County in the selection of design consultants will be
followed. This will ensure that the commissioning firm is selected in a fair and uniform manner and
have appropriate qualifications and experience.
A selection committee will be comprised of Wake County Facilities Design & Construction and General
Service Administration staff. Upon receipt of proposals from respondents, Selection Committee
members will review the proposals in detail and identify ("short list") those firms that appear to be most
qualified to provide services for the Project. Separate presentations and interview sessions will then be
scheduled with the "short-listed" firms to permit the Selection Committee to further evaluate each firm's
qualifications and proposal. The Facilities Design & Construction office will then negotiate terms,
conditions, and fees of an agreement with each selected firm. In the event negotiations of specific
contract terms and conditions prove unsuccessful with a selected firm, the Selection Committee will
select another firm with which to begin contract negotiations.
B. Submittal Timeline
The key activities and milestone dates for the selection process are listed below
Activity Milestone Date
Announce Request for Qualifications and Proposal M a y 22, 2026
Deadline for Respondent Questions J u n e 4, 2026
Proposal Submission Deadline J u n e 1 8, 2026
Selection Committee meeting to determine short list July 2026
Selection Committee presentation/interviews sessions July 2026
Announce Firm Selections J u l y 2026
Page 9 of 12

X. Evaluation Criteria
A. The following criteria will be the basis on which firms will be selected for further consideration:
1. Core business strength,
2. Organizational chart and expertise/qualifications of staff,
3. Appropriate experience and past performance of firm on similar projects,
4. Qualifications and experience of Commissioning team proposed for the project,
5. Current workload,
6. Proposed approach to project of this type,
7. Proximity to and familiarity with the area where the project is located.
8. Proposed fee estimate and hourly billing rates,
9. Record of successfully completed projects without major legal or technical problems,
10. Other factors that may be appropriate for the Project.
XI. Submission of Proposals
Five (5) complete hard copy packages and one (1) thumb drive containing an electronic copy must be
received at the following address by 2:00 PM on Thursday, June 18, 2026.
Attention: County of Wake
Facilities Design and Construction
Attention: Sarah Kahr Richter
Facilities Project Manager
Hand Delivery, UPS, & FedEx Address:
336 Fayetteville Street, Suite 1109
Raleigh, NC 27601
Waverly F. Akins Wake County Office Building
XII. Professional Services Agreement
Professional services required to complete the proposed projects will be authorized through the County's
standard form of Agreement for Professional Services.
XIII. General Comments
A. Any cost incurred by respondents in preparing or submitting a Request for Qualifications and
Proposal for the Project shall be the respondents' sole responsibility.
Page 10 of 12

This page summarizes the opportunity, including an overview and a preview of the attached documents.
* Disclaimer: This website provides information about bids, requests for proposals (RFPs), or requests for qualifications (RFQs) for convenience only and does not serve as an official public notice. Individuals who wish to respond to or inquire about bids, RFPs, or RFQs should contact the relevant government department directly.

Sign-up for a Free Trial, Government Bid Alerts

With Free Trial, you can:

You will have a full access to bids, website, and receive daily bid report via email and web.

Try One Week FREE Now

See Also

Solicitation Number: 366-RFQ7272026 Project Title: Fairmont CDBG-I RFQ Engineering Services Description: The Town

State Government of North Carolina

Bid Due: 8/20/2026

Solicitation Number: Doc2142124691 Project Title: 16-2142124691 2026 Catawba 03050101 Warm Stream and Riparian

State Government of North Carolina

Bid Due: 2/23/2027

Solicitation Number: Doc2144395031 Project Title: RFP 16-2144395031 2026 Roanoke 03010102 or 03010104 Warm

State Government of North Carolina

Bid Due: 10/06/2026

RFQ Number 2721 Parks and Recreation Master Plan Update Submissions Due: 9-7-2026 04:00

City of Concord

Bid Due: 9/07/2026