RFPQ# 26-006 Cochrane Lake Improvement Final
| Agency: | Government of Alberta |
|---|---|
| State: | Alberta |
| Type of Government: | State & Local |
| Posted Date: | Jun 4, 2026 |
| Due Date: | Jun 29, 2026 |
| Solicitation No: | AB-2026-04221 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
Open & Competitive Opportunity
• Request for Qualification
Open
Rocky View County
The Cochrane Lake Improvement Plan is a comprehensive infrastructure project intended to address historic and ongoing challenges related to flooding, water quality, and odour, while improving stormwater management capacity and delivering a regional recreational amenity. The project focuses on increasing lake resilience to climate variability, improving operational control of lake levels, and enhancing environmental conditions through improved water circulation.
Key elements of the project include construction of a new raw water inlet to convey fresh water from the Bow River to Cochrane Lake under an existing, approved water licence, upgrades to the existing discharge pump station to increase the approved outflow to Horse Creek, and management of the lake’s normal water level to expand available storage capacity. The project also includes construction of a paved multi-use pathway around the lake, which will provide a recreational amenity and define the future high-water boundary.
Cochrane Lake is a natural kettle lake/wetland with no natural inlet or outlet, a condition that has contributed to fluctuating lake levels, limited circulation, poor water quality, and recurring odour concerns, including historic health advisories. In 2013, severe rainfall events resulted in localized
flooding within the hamlet. While flooding has not occurred since that time, water quality concerns persist. In 2016, Rocky View County constructed a pump station and outlet pipeline discharging to Horse Creek to assist with managing lake levels and removing nutrient-laden water. In 2022, Alberta Environment and Protected Areas approved an increased discharge rate to further improve lake management.
APC Reference #
AB-2026-04221
Category
Construction
Posting Date • Time
Jun 4, 2026 • 11:09 am (MT)
Closing Date • Time
Jun 29, 2026 • 2:00:59 pm (MT)
Region(s) of Delivery
Alberta
Get Government Bids Like This by Email
Receive daily bid alerts that match your keywords, business categories, and target regions.
See Also
Basic Information APC Reference # AB-2026-06024 Internal Reference # TND0025474 Title TND0025474 -
Government of Alberta
Due by 9/29/2026
Basic Information APC Reference # AB-2026-06332 Internal Reference # 08553-26 Title Construction-Bridge Repairs
Government of Alberta
Due by 10/06/2026
Basic Information APC Reference # AB-2026-06017 Internal Reference # 27PAR8098 Title McLean Creek
Government of Alberta
Due by 9/25/2026
Basic Information APC Reference # AB-2026-05957 Internal Reference # CMH26-103 Title CMH26-103 -
Government of Alberta
Due by 9/24/2026
* Disclaimer: This website provides information about bids, requests for proposals (RFPs), or requests for qualifications (RFQs) for convenience only and does not serve as an official public notice. Individuals who wish to respond to or inquire about bids, RFPs, or RFQs should contact the relevant government department directly.