RFP: 211 Water treatment Plant Sludge Removal ( Drinking Water)
| Agency: | State Government of North Carolina |
|---|---|
| State: | North Carolina |
| Type of Government: | State & Local |
| NAICS Category: |
|
| Posted Date: | Dec 17, 2024 |
| Due Date: | Jan 16, 2025 |
| Solicitation No: | 299-297-299 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
| Solicitation Number: | 299-297-299 |
| Project Title: | RFP: 211 Water treatment Plant Sludge Removal ( Drinking Water) |
| Description: | 1.PROJECT OVERVIEW. Brunswick County is soliciting sealed proposals for removal and disposal of lime residuals generated at the Brunswick County 211 Water Treatment Plant located at 4305 Southport-Supply Road SE, Southport, NC 28461 (the “WTP”). Lime residuals are a byproduct of the lime softening process utilized in the production of potable water and have been concentrated through settling ponds and drying beds. These residuals are typically a 50-75% cake solid and have been classified as “Beneficial Fill” by the NC Division of Waste Management Environmental Compliance Branch. Estimated Quantities Generated: May-September ~480 cubic yards (300-350 tons) per month October-April ~340 cubic yards (200-250 tons) per month Current Stockpile ~1,200 cubic yards (900 tons) onsite 2. SCOPE OF WORK. Brunswick County has established the following objectives for this project. Any changes to the specifications or Scope of Work will be made in the form of an Addendum to this Request for Proposals and will be supplied to all known prospective contractors and posted on the Brunswick County website. Notwithstanding the foregoing, contractors will be responsible for ensuring that they have all addenda. Brunswick County may negotiate and refine the final Scope of Work with the selected contractor. Brunswick County reserves the right to negotiate additional services with the selected contractor at any time after the initial contract award. 2.1 Brunswick County reserves the right to negotiate and refine the final scope of work with the selected contractor. 2.2 The selected contractor will remove and dispose of residuals from the WTP site such that stockpiles at the WTP will remain at or below one drying beds’ worth of sludge (approximately 450 tons) so as not to hamper WTP operations. 2.3 The County will provide loading services during regular business hours of 7:00 am ET until 3:30 pm ET Monday through Friday with the exception of County holidays. 2.4 Hauling operations shall be scheduled with the Water Treatment Plant Superintendent. 2.5 Each truck shall have an empty container/trailer for each load of residuals to be hauled. 2.6 Billing for hauled material will be based on actual cubic yards of material removed from the WTP site regardless of weight. WTP staff shall provide signed documentation (tickets) each day indicating the number of loads and total sludge volume transferred each day. The contractor shall submit copies of load tickets RFP – Sludge Removal PAGE 3 with monthly invoices. 2.7 Quantity estimates are estimates only and not intended to obligate the County in any way. Actual amounts will be different than the estimate. There shall be no guaranteed minimums or maximums under the awarded contract. The contractor is responsible for disposal in accordance with all county, state, and federal laws, rules, and regulations. |
| Opening Date: | 1/16/2025 2:00 PM |
| Posted Date: | 12/18/2024 |
| Status: | Open |
| Department: | COUNTY OF BRUNSWICK |
|
Solicitation Number
*
299-297-299
|
Department
COUNTY OF BRUNSWICK
|
Status Reason
Open
|
|
|
Opening Date
2025-01-16T14:00:00.0000000
|
Posted Date
*
2024-12-17T18:17:24.0000000Z
|
Commodity Code
Construction Services
|
|
|
Mandatory Conference/Site Visit
—
—
|
Special Instructions
—
|
||
|
Description
1.PROJECT OVERVIEW. Brunswick County is soliciting sealed proposals for removal and disposal of lime residuals generated at the Brunswick County 211 Water Treatment Plant located at 4305 Southport-Supply Road SE, Southport, NC 28461 (the “WTP”). Lime residuals are a byproduct of the lime softening process utilized in the production of potable water and have been concentrated through settling ponds and drying beds. These residuals are typically a 50-75% cake solid and have been classified as “Beneficial Fill” by the NC Division of Waste Management Environmental Compliance Branch. Estimated Quantities Generated: May-September ~480 cubic yards (300-350 tons) per month October-April ~340 cubic yards (200-250 tons) per month Current Stockpile ~1,200 cubic yards (900 tons) onsite 2. SCOPE OF WORK. Brunswick County has established the following objectives for this project. Any changes to the specifications or Scope of Work will be made in the form of an Addendum to this Request for Proposals and will be supplied to all known prospective contractors and posted on the Brunswick County website. Notwithstanding the foregoing, contractors will be responsible for ensuring that they have all addenda. Brunswick County may negotiate and refine the final Scope of Work with the selected contractor. Brunswick County reserves the right to negotiate additional services with the selected contractor at any time after the initial contract award. 2.1 Brunswick County reserves the right to negotiate and refine the final scope of work with the selected contractor. 2.2 The selected contractor will remove and dispose of residuals from the WTP site such that stockpiles at the WTP will remain at or below one drying beds’ worth of sludge (approximately 450 tons) so as not to hamper WTP operations. 2.3 The County will provide loading services during regular business hours of 7:00 am ET until 3:30 pm ET Monday through Friday with the exception of County holidays. 2.4 Hauling operations shall be scheduled with the Water Treatment Plant Superintendent. 2.5 Each truck shall have an empty container/trailer for each load of residuals to be hauled. 2.6 Billing for hauled material will be based on actual cubic yards of material removed from the WTP site regardless of weight. WTP staff shall provide signed documentation (tickets) each day indicating the number of loads and total sludge volume transferred each day. The contractor shall submit copies of load tickets RFP – Sludge Removal PAGE 3 with monthly invoices. 2.7 Quantity estimates are estimates only and not intended to obligate the County in any way. Actual amounts will be different than the estimate. There shall be no guaranteed minimums or maximums under the awarded contract. The contractor is responsible for disposal in accordance with all county, state, and federal laws, rules, and regulations.
|
|||
|
Attachments
|
|||
Get Government Bids Like This by Email
Receive daily bid alerts that match your keywords, business categories, and target regions.
See Also
Bid Number: Bid# 26-1062 Bid Title: NOI: Brown Water Treatment Plant Filtrate and
City of Durham
Due by 9/25/2026
IFB 2026-078 IFB Sodium Hypochlorite 12.5% Department: Procurement & Contract Management Category: Bids
Union County
Due by 10/06/2026
Bid Number: 27-1091 Bid Title: EGI-2025-01: Highway 55 Sidewalk Extension Category: Construction Bids
City of Durham
Due by 9/25/2026
Solicitation Number: 354-RFB-27-08 Project Title: Fluorosilicic Acid Description: The Town of Cary is
State Government of North Carolina
Due by 9/23/2026
* Disclaimer: This website provides information about bids, requests for proposals (RFPs), or requests for qualifications (RFQs) for convenience only and does not serve as an official public notice. Individuals who wish to respond to or inquire about bids, RFPs, or RFQs should contact the relevant government department directly.