25 043 RFP Terminal 3 Garage Vestibule HVAC Replacement General Contracting Design Build

Agency: Airports Council International
State: District of Columbia
Type of Government: State & Local
NAICS Category:
  • 236210 - Industrial Building Construction
  • 236220 - Commercial and Institutional Building Construction
  • 238220 - Plumbing, Heating, and Air-Conditioning Contractors
Posted Date: Jul 17, 2025
Due Date: Aug 14, 2025
Original Source: Please Login to View Page
Contact information: Please Login to View Page
Bid Documents: Please Login to View Page

Description

The Kenton County Airport Board (“KCAB”) will receive proposals for Terminal 3 Garage Vestibule HVAC Replacement & General Contracting - Design Build. KCAB requires an all-inclusive Design Build HVAC and General Contractor for the T3 Garage Vestibule HVAC Replacement and Upgrades project. The existing system has failed and is inoperative. The condensing unit has several refrigerant leaks and cannot be recharged; the air handler is in need of significant repairs and the boiler is inefficient and 5 years past its replacement schedule. All components are well past their useful life and the vestibules on each level are minimally conditioned. The Project includes the following: Design Build Team to assess the existing mechanical, electrical, and plumbing (MEP) systems to verify capacity and compatibility with the new HVAC equipment and controls; Compliance with NFPA 220.87, an electrical assessment to confirm existing loads have capacity for the new design; Replacing the existing T3 Garage Vestibule HVAC system in-kind; Installing a new condensing boiler; Providing a new air handler and condenser; Adding a rooftop unit to improve cooling on the fifth floor; Installing air curtains at each automatic door to improve energy efficiency and comfort; Removing the existing pneumatic control system and replacing it with a new Direct Digital Control (DDC) automated logic system compatible with the CVG Building Automation System (BAS); Performing all related MEP work, selective demolition, restoration of finishes, and site cleanup.
Submission Deadline: 08/14/2025 at 2:00 PM Eastern
Submitting Organization: Kenton County Airport Board - Cincinnati/N. Kentucky International Airport
25 043 RFP Terminal 3 Garage Vestibule HVAC Replacement General Contracting Design Build
Get Government Bids Like This by Email Receive daily bid alerts that match your keywords, business categories, and target regions.

See Also

Follow Construction Services for the Gate 7 Parking Garage St. Elizabeths West Campus

GENERAL SERVICES ADMINISTRATION

Due by 11/09/2026

Follow Phase 2 Construct Arabian Leopard Exhibit at the National Zoological Park Active

SMITHSONIAN INSTITUTION

Due by 11/13/2026

Follow Phase 2 Construct Arabian Leopard Exhibit at the National Zoological Park Active

SMITHSONIAN INSTITUTION

Due by 11/20/2026

Follow Creative Exhibit Design Services Active Contract Opportunity Notice ID 030ADV27R0010 Related Notice

LIBRARY OF CONGRESS

Due by 11/16/2026

* Disclaimer: This website provides information about bids, requests for proposals (RFPs), or requests for qualifications (RFQs) for convenience only and does not serve as an official public notice. Individuals who wish to respond to or inquire about bids, RFPs, or RFQs should contact the relevant government department directly.