25 043 RFP Terminal 3 Garage Vestibule HVAC Replacement General Contracting Design Build
| Agency: | Airports Council International |
|---|---|
| State: | District of Columbia |
| Type of Government: | State & Local |
| NAICS Category: |
|
| Posted Date: | Jul 17, 2025 |
| Due Date: | Aug 14, 2025 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
The Kenton County Airport Board (“KCAB”) will receive proposals for Terminal 3 Garage Vestibule HVAC Replacement & General Contracting - Design Build. KCAB requires an all-inclusive Design Build HVAC and General Contractor for the T3 Garage Vestibule HVAC Replacement and Upgrades project. The existing system has failed and is inoperative. The condensing unit has several refrigerant leaks and cannot be recharged; the air handler is in need of significant repairs and the boiler is inefficient and 5 years past its replacement schedule. All components are well past their useful life and the vestibules on each level are minimally conditioned. The Project includes the following: Design Build Team to assess the existing mechanical, electrical, and plumbing (MEP) systems to verify capacity and compatibility with the new HVAC equipment and controls; Compliance with NFPA 220.87, an electrical assessment to confirm existing loads have capacity for the new design; Replacing the existing T3 Garage Vestibule HVAC system in-kind; Installing a new condensing boiler; Providing a new air handler and condenser; Adding a rooftop unit to improve cooling on the fifth floor; Installing air curtains at each automatic door to improve energy efficiency and comfort; Removing the existing pneumatic control system and replacing it with a new Direct Digital Control (DDC) automated logic system compatible with the CVG Building Automation System (BAS); Performing all related MEP work, selective demolition, restoration of finishes, and site cleanup.
Submission Deadline: 08/14/2025 at 2:00 PM Eastern
Submitting Organization: Kenton County Airport Board - Cincinnati/N. Kentucky International Airport
25 043 RFP Terminal 3 Garage Vestibule HVAC Replacement General Contracting Design Build
Get Government Bids Like This by Email
Receive daily bid alerts that match your keywords, business categories, and target regions.
See Also
Follow EHRM Infrastructure Upgrades Construction - Washington, DC - Proj. 688-22-700 Active Contract
VETERANS AFFAIRS, DEPARTMENT OF
Due by 9/22/2026
https://flysba.santabarbaraca.gov/projects/fbo-redevelopment-project Submission Deadline: 9/23/2026 Submitting Organization: Santa Barbara Airport RFQ Fixed Based Operators
Airports Council International
Due by 9/23/2026
Follow United States Postal Service RFI: Construction Market Research Active Contract Opportunity Notice
POSTAL SERVICE
Due by 1/01/2027
Follow DCF NS-LEPE Site Preparation Active Contract Opportunity Notice ID NS-LEPE_Sources_Sought Related Notice
TREASURY, DEPARTMENT OF THE
Due by 10/02/2026
* Disclaimer: This website provides information about bids, requests for proposals (RFPs), or requests for qualifications (RFQs) for convenience only and does not serve as an official public notice. Individuals who wish to respond to or inquire about bids, RFPs, or RFQs should contact the relevant government department directly.