RFP - RICKWOOD STATE PARK ADDENDUM 1 **** PROPOSAL DEADLINE FOR THIS RFP IS 11 P.M. CST ON MAY 29, 2026.

Attachment Preview

ADDENDUM NUMBER 01
DATE:
May 21, 2026
PROJECT:
RICKWOOD CAVERNS STATE PARK – POOL HOUSE
PROJECT NUMBER: ASPD PROJECT #: 2025-022-1616
OWNER:
State Parks Division of the ADCNR
64 N. Union Street, Suite 538
Montgomery, AL 36104
ENGINEER:
Three Notch Group, Inc.
515 Locust Street
Gadsden, Alabama 35901
TO:
Prospective Bidders
This Addendum forms a part of the Contract Documents and modifies the Bidding Documents dated
December 19, 2025 (Plans) and April 28, 2026 (Project Manual).
Contractors shall acknowledge receipt of this Addendum in the space provided in the Proposal Form.
Failure to do so may disqualify future Bidders.
This Addendum consists of twelve (12) total pages including attachments.
Prebid meeting agenda (minutes) & attendance record attached.
CHANGES TO THE PROJECT MANUAL
1. Section 10 2800 – Toilet, Bath, and Laundry Accessories
a. Speedflow Plus by Saniflow will be considered an approved equal subject to requirements
of the drawings and specifications.
2. Section 07 7124 – Manufactured Gutters and Downspouts
a. Replace this section in its entirety with the attached version. Gutter guards basis of design
product noted.
3. Section 07 4114 – Metal Roof Panels
a. “Powerseam” by Fabral Metal Wall and Roof Systems will be considered an approved
equal subject to requirements of the drawings and specifications.
CHANGES TO THE CONSTRUCTION PLANS
1. Sheet A05.10
a. Replace this sheet in its entirety with the attached version.
b. Section 2/A05.10: Gutter guards have been added.
c. Detail 5/A05.10: Gutter Guards have been added and indicated.
Addendum No. 01
2. Sheet C-302
a. New callout in reference to the sanitary sewer lateral “Temporarily tie sewer to the existing
septic system, which is to be replaced with either a new septic system or connection to
public sewer”
CLARIFICATIONS
1. All questions shall be submitted to Jake Ross (jake.ross@3notch.com) by Friday, May 29, 2026,
11:00 a.m.
CONTRACTOR QUESTIONS / RFI’s
1. Can we substitute custom plastic laminate cabinets instead of Solid Plastic Laboratory Casework?
Due to the low durability of MDF and particle board used in the plastic laminate-clad casework
spec provided, this will not be considered an approved equal.
2. Was a Geotechnical Evaluation performed? No Geotechnical Evaluation was performed
pertaining to the Pool House project area.
ISSUED THIS 21st DAY OF MAY 2026
____________________________________
Lance Armbrester, PE
Addendum No. 01
PRE-BID CONFERENCE AGENDA
FOR
FACILITY UPGRADES FOR RICKWOOD CAVERNS STATE PARK
ALABAMA STATE PARKS DIVISION
ADCNR PROJ. NO.: 2022-029-5216
Wednesday, May 13, 2026, 1:00 PM
OPENING AND INTRODUCTIONS
1. Sign-In Sheet
2. Introductions
a. Owner: Alabama State Parks Division of the ADCNR
i. Dennis Grooms, Construction Manger
ii. State Park Staff
b. Civil Engineer & Lead Design Consultant: Three Notch Group, Inc. (Formerly CDG)
i. Lance Armbrester, PE
ii. Jake Ross, EI
c. Architect: Seay, Seay & Litchfield
i. Jeff Bazzell, AIA, LEED AP
ii. Olivia Smith, ASSOCIATE AIA
d. Structural Engineer: Day Structures, Inc.
i. Jeremy D. Day, PE
e. Mechanical/Plumbing Engineer: Morris Davis Engineering, LLC
i. Hunter B. Davis, PE
f. Electrical Engineer: Garner & Associates Engineering
i. Morgan Garner, PE
GENERAL INFORMATION
3. Bid Documents: PDF electronic copies are available via email at no cost to the bidder.
4. Schedule: See Invitation to Bid
a. Bid Due Date: Thursday, June 04, 2026, 2:00 PM CST
b. Bid Opening: Friday, June 05, 2026, 2:00 PM CST
c. Bid Opening Location: ADCNR Conference Room (Montgomery, AL)
5. Instructions to Bidders: See ASPD Form 5-C
a. It is the Contractor’s responsibility to make sure bid is complete per the Contract
documents (e.g. bid form, bid bond, sub/supplier list, etc.)
b. It is the Contractor’s responsibility to make sure bids are delivered and received at the
designated location on the date and time stated in advertisement for bid or subsequent
addenda.
c. Proposal Form: Use ASPD Form 5-E, along with Attachments “A”- Bid Items & Unit Pricing,
provided in the Specification Manual. No alterations shall be made to these forms.
d. Base Bid & Alternate 1
e. Request for Information: All questions shall be submitted to Jake Ross
(jake.ross@3notch.com) by Friday, May 29, 2026, 11:00 a.m.
f. Addenda: All Addenda will be issued by Three Notch Group, Inc. and sent to the same
email address used by the bidder to obtain bid documents.
g. Award: The owner intends to announce the bid award to the lowest qualified bidder
within 30 days of the bid opening.
h. Construction Start Date: The owner intends to issue a NTP proceed on Tuesday,
September 8, 2026 (see Supplemental General Conditions).
6. Construction Completion Date: 120 calendar days from the NTP
7. Liquidated Damages: $1000.00 per day
8. Construction Budget: The owner may elect to announce an official budget prior to the bid opening.
9. Site Visits: Bidders shall thoroughly investigate the project site to fully understand the scope of
work required by the Contract Documents. Site visits can be arranged if needed by contacting Jake
Ross.
PROJECT OVERVIEW
Demolition of Existing sidewalk, fencing, and other items
Construction of a pool house building
Concrete paths
Onsite septic system
This page summarizes the opportunity, including an overview and a preview of the attached documents.
* Disclaimer: This website provides information about bids, requests for proposals (RFPs), or requests for qualifications (RFQs) for convenience only and does not serve as an official public notice. Individuals who wish to respond to or inquire about bids, RFPs, or RFQs should contact the relevant government department directly.

Sign-up for a Free Trial, Government Bid Alerts

With Free Trial, you can:

You will have a full access to bids, website, and receive daily bid report via email and web.

Try One Week FREE Now

See Also

Follow Sources Sought B1502 Renovation Active Contract Opportunity Notice ID PANNGB-26-P-0000033323 Related Notice

DEPT OF DEFENSE

Bid Due: 6/05/2026

Agency Agency Link Agency Number Status Category Sub Category 2026-163-07 Description: Coffee Shop

Alabama Department of Finance

Bid Due: 6/04/2026

Follow Z1DA--679-24-102 B18 Laundry Renovations & Additions Active Contract Opportunity Notice ID 36C24726R0083

VETERANS AFFAIRS, DEPARTMENT OF

Bid Due: 6/05/2026

Bid Number: 26021 Bid Title: GRADE, DRAIN, BASE & PAVE HI-PACK DRIVE Category:

City of Opelika

Bid Due: 6/23/2026