RFP: Northwest Water Treatment Plant Sludge Dewatering, Removal, and Disposal
| Agency: | State Government of North Carolina |
|---|---|
| State: | North Carolina |
| Type of Government: | State & Local |
| NAICS Category: |
|
| Posted Date: | Dec 20, 2024 |
| Due Date: | Jan 28, 2025 |
| Solicitation No: | 299-297-297 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
| Solicitation Number: | 299-297-297 |
| Project Title: | RFP: Northwest Water Treatment Plant Sludge Dewatering, Removal, and Disposal |
| Description: | Brunswick County is soliciting sealed proposals for dewatering, removal, and disposal of sludge at Brunswick County’s Northwest Water Treatment Plant (“NWTP”). The NWTP is a 24mgd water treatment facility. It was constructed in 1984 and treats water from the Cape Fear River via the Kings Bluff Pump Station in Bladen County. Currently, the average raw water flow for 2024 is 14.11 million gallons a day. The NWTP utilizes chlorine dioxide, polyaluminumchloride, polymer, and sodium hydroxide as its primary chemicals in the treatment of drinking water. Sodium fluorosilicate, orthophosphate, chlorine, and ammonia are also used to finish the water before being pumped to the distribution system. River sediment is removed from the treatment process via two routes, one being clarifier sludge blowdowns and the other filter backwashes. Each process has its own unique percent solids and can vary widely. Solids from these processes travel to a two-million gallon settling lagoon. The lagoon is equipped with aluminum handrails, a 20/1 sloped bottom, floor pressure relief valves, a supernatant collector weir, and two 1,200gpm Wemco hydrostal pumps. These two pumps are capable of pumping most of the sludge from the lagoon and transferring it to the 80’ circular sludge thickening unit. In the thickening unit, sludge can be stored and thickened until ready to be removed. One 400gpm Wemco hyrdostal pump is currently available along with another 4” attachment point for another pump (contractor supplied). The initial term of the contract, if awarded, shall be three (3) years. The initial term may be followed by three (3) successive options to renew for one (1) year each. Each renewal option is to be exercised automatically unless either party gives notice of its intent not to renew at least ninety (90) days prior to the end of the then-current term. |
| Opening Date: | 1/28/2025 4:30 PM |
| Posted Date: | 12/21/2024 |
| Status: | Open |
| Department: | COUNTY OF BRUNSWICK |
|
Solicitation Number
*
299-297-297
|
Department
COUNTY OF BRUNSWICK
|
Status Reason
Open
|
|
|
Opening Date
2025-01-28T16:30:00.0000000
|
Posted Date
*
2024-12-20T15:38:17.0000000Z
|
Commodity Code
Construction Services
|
|
|
Mandatory Conference/Site Visit
—
—
|
Special Instructions
—
|
||
|
Description
Brunswick County is soliciting sealed proposals for dewatering, removal, and disposal of sludge at Brunswick County’s Northwest Water Treatment Plant (“NWTP”). The NWTP is a 24mgd water treatment facility. It was constructed in 1984 and treats water from the Cape Fear River via the Kings Bluff Pump Station in Bladen County. Currently, the average raw water flow for 2024 is 14.11 million gallons a day. The NWTP utilizes chlorine dioxide, polyaluminumchloride, polymer, and sodium hydroxide as its primary chemicals in the treatment of drinking water. Sodium fluorosilicate, orthophosphate, chlorine, and ammonia are also used to finish the water before being pumped to the distribution system. River sediment is removed from the treatment process via two routes, one being clarifier sludge blowdowns and the other filter backwashes. Each process has its own unique percent solids and can vary widely. Solids from these processes travel to a two-million gallon settling lagoon. The lagoon is equipped with aluminum handrails, a 20/1 sloped bottom, floor pressure relief valves, a supernatant collector weir, and two 1,200gpm Wemco hydrostal pumps. These two pumps are capable of pumping most of the sludge from the lagoon and transferring it to the 80’ circular sludge thickening unit. In the thickening unit, sludge can be stored and thickened until ready to be removed. One 400gpm Wemco hyrdostal pump is currently available along with another 4” attachment point for another pump (contractor supplied). The initial term of the contract, if awarded, shall be three (3) years. The initial term may be followed by three (3) successive options to renew for one (1) year each. Each renewal option is to be exercised automatically unless either party gives notice of its intent not to renew at least ninety (90) days prior to the end of the then-current term.
|
|||
|
Attachments
|
|||
Get Government Bids Like This by Email
Receive daily bid alerts that match your keywords, business categories, and target regions.
See Also
Solicitation Number: 274-PRCR-UF-2026-3 Project Title: Raleigh IRA Tree Removal Project Description: The removal
State Government of North Carolina
Due by 9/25/2026
Solicitation Number: Doc2216963235 Project Title: 2026 Catawba Expanded Service Area (ESA) Warm Stream
State Government of North Carolina
Due by 2/23/2027
Solicitation Number: 274-PRCR-UF-2026-2 Project Title: Raleigh IRA Tree Pruning Project Description: Pruning of
State Government of North Carolina
Due by 9/25/2026
Solicitation Number: 354-RFB-27-08 Project Title: Fluorosilicic Acid Description: The Town of Cary is
State Government of North Carolina
Due by 9/23/2026
* Disclaimer: This website provides information about bids, requests for proposals (RFPs), or requests for qualifications (RFQs) for convenience only and does not serve as an official public notice. Individuals who wish to respond to or inquire about bids, RFPs, or RFQs should contact the relevant government department directly.