| Agency: | Jea |
|---|---|
| State: | Florida |
| Type of Government: | State & Local |
| NAICS Category: |
|
| Posted Date: | Oct 15, 2024 |
| Due Date: | Oct 22, 2024 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
This scope of work includes inspecting, cleaning, restoring grounds, documenting materials and measurements and electrically testing the Isolated Phase Bus (IPB) system between the Generator Terminals and the step-up power transformers. The Bidder shall furnish all equipment, supervision, labor, transportation, tools and expendables to clean by removing all foreign matter, restore ground connections and inspect and make repair recommendations, for the existing IPB. The purpose is to ensure that the duct, bus, flex-links and insulators are sufficiently clean and that the duct is properly sealed against moisture intrusion. If any equipment is found to be damaged, it will be up to the JEA Project Manager (PM) to decide if the equipment is to be left as-is, repaired or replaced. A metal cage on the mezzanine shall be deconstructed and placed in the metal recycling bin. Prior to any work on the IPB, the Foreman shall walk down the clearance with the PM and Engineer to gain an understanding of JEA’s Lock Out Tag Out (LOTO) and to ensure safety prior to starting work. The bus shall be grounded with spider grounds at the PT cabinets and the flex links shall be removed below the generator and at the GSU’s. The surge protectors shall be disconnected in the PT cabinets prior to testing. A daily meeting with the Contractor Foreman or PM shall be completed with the JEA PM to go over any safety issues, discovery work, project status, and the project schedule. An insulator for both the station service run and the main bus shall be removed at the beginning of the work. Three of the smaller insulators from the station service bus along with five of the larger main bus insulators shall be ordered preemptively so as to avoid delaying the outage and to possibly put spares on the shelf.
A more detailed description of the Work is provided in the Technical Specifications included as an Exhibit to this Solicitation.
USE THIS LINK TO ACCESS THE SOLICITATION ON ZYCUS:
https://zsn.zycus.com/guest/genericRegister/JEA074/iSource/885910/
Response Due Date: October 8, 2024
Response Due Date: October 15, 2024
Response Due Date: October 22, 2024
With Free Trial, you can:
You will have a full access to bids, website, and receive daily bid report via email and web.
Project ID: Title: Petroleum Storage Tank Testing and Inspection Services Addenda: 0 Release
Sarasota County
Bid Due: 6/19/2026
Follow Sewage and Grey Water System, clean and inspect for the USCGC Robert
HOMELAND SECURITY, DEPARTMENT OF
Bid Due: 6/08/2026
Main Agency Orlando Utilities Commission Status Active Fiscal Year 2026 Primary Contact Cindy
Brevard County School Board
Bid Due: 6/30/2026
Follow Laundry Chemical Supplies and Maintenance Active Contract Opportunity Notice ID 36C24826Q0012 Related
VETERANS AFFAIRS, DEPARTMENT OF
Bid Due: 10/10/2026