1412085246 (RFP) Merrill Road Substation T1 Replacement and Two Feeder Additions

Agency: JEA
State: Florida
Type of Government: State & Local
NAICS Category:
  • 236220 - Commercial and Institutional Building Construction
  • 237310 - Highway, Street, and Bridge Construction
  • 238210 - Electrical Contractors and Other Wiring Installation Contractors
Posted Date: Jan 14, 2026
Due Date: Jan 21, 2026
Original Source: Please Login to View Page
Contact information: Please Login to View Page
Bid Documents: Please Login to View Page
1412085246 (RFP) Merrill Road Substation T1 Replacement and Two Feeder Additions

The scope of work for this solicitation encompasses the construction, installation, labor, equipment, and materials required for the installation of switchyard electrical equipment at the Merrill Road Substation. The Contractor is responsible for erecting, testing, and ensuring the facilities, as shown on the Contract Drawings and specified in the Technical Specifications, are fully operational and ready for service. These documents, along with any associated materials, outline all aspects of construction within JEA electrical substations.

USE THIS LINK TO ACCESS THE SOLICITATION ON ZYCUS:

https://zsn.zycus.com/guest/genericRegister/JEA074/iSource/1010110/

Mandatory Pre-Response Meeting and Site Visit: December 17, 2025

Response Due Date: January 6, 2026

Response Due Date: January 13, 2026

Response Due Date: January 21, 2026


1412085246 Solicitation
1412085246 Appendix A - Technical Specifications
1412085246 Appendix B - Bid Forms
1412085246 Appendix B - Bid Workbook
1412085246 Appendix B- Subcontractor Form
1412085246 Appendix C - JEA Bid Bond
1412085246 Addendum 1
1412085246 Mandatory Pre-Bid Attendees
1412085246 Mandatory Site Visit Attendees
1412085246 Addendum 2
1412085246 Addendum 2 - Existing Foundation Details For Demo
1412085246 Addendum 2 - ME2024 Geotech Report - Final
1412085246 Addendum 3








Â

Attachment Preview

1.1) Cover Page
Solicitation
For Participation in
Merrill Road Substation T1 Replacement and Two Feeder Additions
for
JEA
Jacksonville, FL
Solicitation Number 1412085246
Mandatory Pre-Response Meeting via Microsoft Teams on December 17, 2025 at 10:00AM EST
Microsoft Teams Need help?
Join the meeting now
Meeting ID: 246 750 913 842 9
Passcode: rB7eF2GJ
Dial in by phone
+1 469-208-1810,,191765120# United States, Carrollton
Find a local number
Phone conference ID: 191 765 120#
Join on a video conferencing device
Tenant key: jea@m.webex.com
Video ID: 116 013 058 8
More info
Mandatory Site Visit: December 17, 2025 at 1:30PM EST
Site Address: 7730 Merrill Road, Jacksonville FL 32211
PPE Required (Steel Toe Boots, Safety Glasses, Hard Hat, etc)
Those planning to attend via Microsoft Teams should send contact information to: Jason Behr, behrjv@jea.com 48
hours prior to the Pre-Response Meeting to have contact information documented.
Responses are due on January 6th, by 12:00 PM EST
All Responses shall be submitted through JEA’s E-Procurement and Contract Management Portal which is provided
by Zycus Supplier Network which can be accessed at https://zsn.zycus.com/guest. Instructions on how to login to
Zycus is provided below in this Solicitation. LATE RESPONSES MAY BE REJECTED.
JEA will publicly open all Responses received from qualified Respondents on the Due Date, via Microsoft Teams.
For more information please contact the JEA Buyer at:
Jason Behr, behrjv@jea.com
1.2) Scope of Work
The scope of work for this solicitation encompasses the construction, installation, labor, equipment, and materials
required for the installation of switchyard electrical equipment at the Merrill Road Substation. The Contractor is
responsible for erecting, testing, and ensuring the facilities, as shown on the Contract Drawings and specified in the
Technical Specifications, are fully operational and ready for service. These documents, along with any associated
materials, outline all aspects of construction within JEA electrical substations.
1.3) Background
JEA owns, operates and manages the electric system established by the City of Jacksonville, Florida since 1895. In June
1997, JEA also assumed operation of the water and sewer system previously managed by the City. JEA is located in
Jacksonville, Florida, where we proudly serve an estimated 522,469 electric, 396,566 water and 316,441 sewer and
26,902 reuse water customers. JEA is Florida's largest community owned utility and the eighth largest municipal in the
United States.
1.4) Invitation - Submitting a Response
Respondents that meet the Minimum Qualification stated herein are invited to submit a Response to this Solicitation to
perform the Work. A complete copy of this Solicitation, the Technical Specifications, forms and all other documents
referenced in this Solicitation are on JEA’s E-Procurement and Contract Management Portal which is provided by
Zycus Supplier Network which can be accessed at https://zsn.zycus.com/guest/genericRegister/JEA074. Instructions
on how to login to Zycus is provided below in this Solicitation.
All Responses are due at the time indicated on the title page of this Solicitation. Section 1 of this Solicitation are the
instructions for submitting a Response for this Solicitation. Section 2 of this Solicitation contain the definitions and
commercial contract terms associated with this procurement.
A Contract will presented to the Respondent awarded this Work and the Contract will incorporate by reference this
entire Solicitation and all associated Addenda. A sample of the JEA Contract can be found on jea.com.
All documentation submitted with a Response must reference the Solicitation Title and Number stated herein. All
Responses must be made on the appropriate forms and formats as specified by this Solicitation and uploaded to JEA’s
procurement platform.
All Responses should be delivered electronically to JEA via the Zycus platform. An automated, detailed auditing
system provides sealed Response integrity. Responses remain sealed on the platform until the Close Date & Time
(Due Date & Time).
A Respondent shall be solely responsible for timely delivery of its Response to the Zycus Supplier
Network. Respondents are strongly encouraged to acquire log in credentials early as possible. Additionally
Respondents are encouraged to submit Responses early to ensure uploading process goes smoothly. If Respondent is
not able to submit its Response via Zycus, then please email the Response to the JEA Buyer identified in the
Section below titled "Questions".
Responses are due by the time and on the date stated on the cover page of this Solicitation. LATE RESPONSES
MAY BE REJECTED.
1.5) Zycus Instructions
I. How to Log Into Zycus
A. New Users Zycus
1. New Users will need to register to login. Registration will require Company name, address, phone, contact, title,
phone and email address. Also, it is recommended users use Google Chrome to access Zycus.
2. Note if the company is already doing business with JEA, you may find the company is already registered in Zycus.
To find out if you are registered, try entering your email address in the New User Registration screen. If you receive a
message stating “Email ID already registered”, log in as an Existing User Log-in”. If you don’t know your password,
enter your email address and click on “Forgot Password”.
B. Existing Users or New Users with Previously Registered Emails
1. Once the user has a login on the sourcing platform select “Existing User Log-in”, the user may navigate to the
solicitation by selecting the icon for the applicable solicitation.
II. How to Submit a Response Using Zycus
1. Once logged in, users will see all JEA Sourcing Events, then select the applicable event.
2. Once in the Sourcing Event. The Sourcing Event has prompts for actions required to respond to the solicitation.
3. For the user to proceed to submit a Response to JEA using Zycus, the user will be required to provide its acceptance
of the of the Zycus iSource Terms & Conditions associated with the work. Such Terms and Conditions may cover
non-disclosure, safety, cyber security, Invitation for Bid contract terms, etc.
4. Once all terms are accepted, additional Solicitation information will be available for viewing and submitting a
Response by selecting “Confirm Participation”. JEA will then have a record indicating the company intends to submit
a Response.
5. A user then can respond to each section of the Solicitation, once completed with each section, select “Save”. Note
each section has a red, yellow, green light code. Items will turn green once completed. Yellow and red lights mean
there is additional action required. Users may also note under each tab, there are multiple questions to respond to,
scroll down the list to ensure all questions are answered.
6. In most Solicitations, JEA will provide Technical Specifications, pricing tables in Excel which the user will need to
download. Additionally, Excel pricing tables may need to be uploaded once completed to as part of the Response.
Users can download the required attachments by selecting the “Buyers Attachments” icon.
7. Once the required forms are uploaded and saved, the section light will turn green. Once all sections are completed
and green lighted, the User may select “Submit Response”.
8. Once the user selects “Submit Response”, the user will receive a “Success” pop-up when submitted.
9. Once submitted users may recall and modify submitted documentation and submit information until the Response
Due Date and Time.
1.6) Questions
All Questions must be submitted in writing to the JEA Buyer listed herein at least five business days prior to the
opening date. Questions received within five business days prior to the opening date may not be answered.
1.7) Pre-Response Meeting
There may be an mandatory Pre-Response meeting associated with this Solicitation at the date and time listed on the
cover page of this Solicitation. All interested Respondents are invited to attend the Pre-Response meeting. Those
planning to attend the Teams or teleconference may email their name and contact information to the JEA Buyer listed
herein at least 48 hours prior to the Pre-Response meeting to facilitate roll call. A Respondent must only sign in
representing one company, unless otherwise agreed to by JEA in writing.
1.8) Opening of Responses
All Responses received shall be publicly announced and recorded via Microsoft Teams at the date and time indicated
on the cover page of this Solicitation.
The details for the Microsoft Teams will be on jea.com at the following website: https://www.jea.com approximately
48 hours before the Response opening.
At the opening of Responses, a JEA representative will publicly open each Response that was received prior to the
Date and Time, except for those Responses that have been properly withdrawn. JEA has the right to waive
irregularities or informalities in the Responses to the extent allowable under applicable laws.
1.9) Alternate Provisions and Conditions
Terms and conditions found in Responses that are contrary to requirements found in this Solicitation, including, but
not limited to, the Contract terms and conditions contained in Section 2 of this Solicitation and any requirements found
in the Technical Specifications attached as an exhibit or attachment to this Solicitation, will be rejected and are of no
force and effect. However, JEA reserves the right to negotiate different terms and conditions and requirements if JEA
determines that such terms and conditions and requirements are in the best interest of JEA.
1.10) Minimum Qualifications
Respondent must meet the following Minimum Qualifications to be considered eligible to have its Response evaluated
by JEA. Respondent must complete and submit the Minimum Qualification Form provided in this Solicitation.
Respondents that are working or have worked for JEA in the past 2 years involving similar work must submit JEA as a
reference. JEA reserves the right to ask for additional back up documentation or additional reference projects to
confirm the Respondent meets the requirements stated above.
JEA may reject Responses from Respondents not meeting all of the following Minimum Qualifications:
I. Respondent must not be on the State of Florida Convicted Vendor List, State of Florida’s Suspended
Vendor List, the City of Jacksonville’s Disqualified Vendor List, have their bidding privileges actively
suspended by JEA, been debarred by JEA, or have had a contract with JEA was terminated for default
within the last two (2) years.
II. Respondent must be approved for RBL Category SB1 Substation Construction up to 500kV by the bid due
date.
III. The Respondent shall comply with the technical and commercial specifications for this solicitation.
1.11) Number of Contracts to be Awarded
JEA intends to Award one (1) Contract for the Work. JEA reserves the right to Award more than one Contract based
on certain groupings of the Work items, or JEA may exclude certain Work items, if JEA determines that it is in its best
interest.
1.12) Insurance Requirements
Prior to JEA issuing a Purchase Order to the Company to begin the Work, the Company shall submit a certificate of
insurance (COI) that is in compliance with amounts and requirements as indicated in this Solicitation. Note that the
COI shall specifically indicate JEA as additional insured on all required insurance except Worker's Compensation and
Professional Liability (if applicable). Furthermore, waiver of subrogation must be provided for all required insurance
in favor of JEA, including its board members, officers, employees, agents, successors, and assigns.
1.13) Liquidated Damages In Contract
The Contract issued pursuant to this Solicitation contains liquidated damages tied to project completion deadlines. The
Respondent should review the specific time frames and liquidated damage amounts prior to submitting its Response.
1.14) Liquidated Damages
If the Company fails to obtain Substantial Completion of the Work, Liquidated Damages will be applied as seen
below:
I. LD at $1500/Day for failure to meet Milestone date: “Contractor Substantially Complete with new 26kV
Additions”.
II. LD at $1000/Day for failure to meet Milestone date: “Contractor Substantially complete with Transfer T1
Replacement”.
III. LDs at $1000/day for failure to meet Milestone date: “Contractor Substantially Complete with Breaker
6T2 Replacement & 26kV Equipment Removals”
See Technical Specs - Specific Instructions for more information.
Liquidated Damages are capped at a maximum of ten percent (10%) of the Contract Price.
The Company understands and agrees that said daily sum is to be paid not as a penalty, but as compensation to JEA as
a fixed and reasonable amount for damages and losses that JEA will suffer because of such default, whether through
increased administrative and engineering costs, interference with JEA's normal operations, other tangible and
intangible costs, or otherwise, which costs will be impossible or impractical to measure or ascertain with any
reasonable specificity.
Liquidated Damages may, at JEA's sole discretion, be deducted from any monies held by JEA that are otherwise
payable to Company. The Company's responsibility for Liquidated Damages shall in no way relieve the Company of
any other obligations under the Contract.
1.15) Jacksonville Small and Emerging Business (JSEB) Participation Goal - Optional
All questions and correspondence concerning the JSEB program should be addressed to the following contact:
Bill Hickey
Manager, Supplier Diversity Programs and Procurement Services
JEA
hickwj@jea.com or jsebprogram@jea.com
1.16) Basis of Award - Highest Evaluated
JEA will use the Selection Criteria listed below to evaluate the Responses. JEA may make its Award decision based
solely upon the information submitted in the Responses. JEA may also choose to have one or more Respondent make
presentations to representatives of JEA. It is always in the best interest of the Respondent to provide informative,
concise, well-organized technical and business information relative to the Work, in both the initial submittal of its
Response and in any subsequent submittals.
Please note, JEA may reject Responses that request material changes or take exceptions to JEA commercial terms and
conditions.
Responses will be scored and ranked by a committee of evaluators. Each evaluator will individually score the
Responses using the evaluation matrix attached to this Solicitation. Using these scores, each evaluator will rank the
Responses using "1" for the Response receiving the highest number of points from the matrix. Responses with an
equal number of points will receive the same numerical ranking. JEA will total the numerical rankings for each
Response and consider the Response with the lowest total to be the most highly qualified Response. Any tie will be
broken using the total of the matrix scores of all evaluators. If a tie persists, the tie will be broken in accordance with
the JEA Procurement Operational Procedures.
1.17) Selection Criteria
The following criteria will be used by JEA to evaluate and rank Responses from Respondents who meet the Minimum
Qualifications specified in this Solicitation.
1.18) Quotation of Rates (RFP) (65 Points)
Respondent shall provide a completed Response form for scope of services in this solicitation. Additionally, if
requested, the provider shall provide a completed the Response Workbook in Appendix B. The total Response price
should be entered on the Proposal Form. The total Response price shall firm fixed prices, not estimates, and include all
profit, taxes, benefits, and all other items. ANY MODIFICATIONS, EXCEPTION, OR OBJECTIONS CONTAINED
WITHIN THE RESPONSE FORM MAY SUBJECT THE RESPONSE TO DISQUALIFICATION.
1.19) Similar Experience (RFP) (10 Points)
This page summarizes the opportunity, including an overview and a preview of the attached documents.
* Disclaimer: This website provides information about bids, requests for proposals (RFPs), or requests for qualifications (RFQs) for convenience only and does not serve as an official public notice. Individuals who wish to respond to or inquire about bids, RFPs, or RFQs should contact the relevant government department directly.

Sign-up for a Free Trial, Government Bid Alerts

With Free Trial, you can:

You will have a full access to bids, website, and receive daily bid report via email and web.

Try One Week FREE Now

See Also

Project ID: Title: Police K-9 Compound (Project No. 22209-118) Addenda: 0 Release Date:

City of St. Petersburg

Bid Due: 6/09/2026

RFQ-26-C-00022 26-C-00022 Howard F. Curren AWTP Aquifer Recharge Wells Pumping System Design-Build View

City of Tampa

Bid Due: 6/11/2026

Project ID: Y26-740 Title: Reams Road Improvement Project - Summerlake Park Blvd to

Orange County

Bid Due: 6/04/2026

Follow P683 AIRCRAFT ENGINE REPAIR FACILITY, NAVAL AIR STATION(NAS), JACKSONVILLE, FLORIDA Active Contract

DEPT OF DEFENSE

Bid Due: 6/09/2026