26-99484 RFP for Engineering Services for Medial District Lighting

Agency: City of Duluth
State: Minnesota
Type of Government: State & Local
NAICS Category:
  • 541330 - Engineering Services
Posted Date: May 21, 2026
Due Date: May 28, 2026
Original Source: Please Login to View Page
Contact information: Please Login to View Page
Bid Documents: Please Login to View Page
  • 26-99484 RFP for Engineering Services for Medial District Lighting (due 5/28)
  • Attachment Preview

    CITY OF DULUTH, MN
    Monday, May 11, 2026
    Request for Proposals
    for
    Engineering Services for Medical District Lighting Improvements
    Duluth, Minnesota
    RFP 26-99484
    City of Duluth Project No. 2238
    Proposals Due: Thursday, May 28, 2026 at 3:00 pm local time
    I:\FINANCE\PURCHASING\Bids, RFPs, Contracts & Agreements\2026\26-99484 Medical District Lighting RFP\2338 RFP - DRAFT.docx
    Page 1 of 8

    PROJECT OVERVIEW
    The City of Duluth is interested in retaining a consultant to provide professional engineering
    services to complete a design of a lighting system along 2nd Street, 3rd Street, 4th Ave East and 5th
    Ave E. The lighting system will be bounded by 4th Ave E, 4th Street, Superior Street, and 6th Ave
    East. Consultant services are expected to include design and include limited construction support
    services, as noted within this request.
    BACKGROUND
    The area around St Mary's Medical Center experiences a large amount of pedestrian traffic. At
    night, pedestrians walk along the sidewalk system and concerns regarding safety both along the
    sidewalks and crossing streets are regular reports to City staff and hospital administration. The
    City is committed to pedestrian safety and proposes to improve the lighting within the designated
    medical district area. This project will design a new lighting system in this area to be constructed
    and bid.
    The proposed design would replace most (but not all) of the existing street lighting within these
    areas, including those owned by the City and Minnesota Power. Conceptually, the City would be
    looking to provide "cobrahead" style lighting at each intersection (assumed to be two at each
    location listed) and pedestrian scale post-top style lighting along the sidewalks. The signal
    systems within the area of study (6th Ave East at 3rd Street and 2nd Street) will remain as-is and is
    generally consistent with the design goals for this project. No work will be done on 4th Street as
    that would be completed as part of the on-going 4th Street reconstruction project. Please see the
    attached map (Exhibit A) illustrating the area of work.
    The selected consultant will be tasked with preparing the design plans and specifications,
    suitable for bidding the project, and with providing limited construction administration support
    during the construction phase of the project.
    GENERAL PROJECT SCOPE
    Consulting engineering services are expected to include all work necessary to provide final
    design including plans and specifications for the project as described, as well as limited
    assistance during bidding and construction services. These include, but are not limited to the
    following:
    1. Project Meetings, Management and Coordination
    2. Project Reconnaissance
    3. Preliminary and Final Engineering Design
    4. Limited Bidding Assistance
    5. Limited Construction Administration Assistance
    These tasks will be defined in greater detail within this solicitation. All work shall be performed
    in accordance with the most recent version of the City Standard Specifications and Engineering
    Guidelines (available on the City of Duluth website, https://duluthmn.gov/engineering/).
    Page 2 of 8

    SCOPE OF SERVICES
    1. Project Meetings, Management and Coordination
    Proposers shall manage their effort to complete the design effort required to produce the project.
    This shall include the overall management effort, project meetings and coordination with
    stakeholders.
    Project Management
    The consultant is expected to manage their project effort in an efficient manner and
    within the schedule proposed. This includes tasks such as timely invoicing, coordination
    of internal resources, scheduling of the project and required resources, and providing
    quality control of the deliverables.
    Meetings
    The consultant shall attend a minimum of two (2) meetings. This will include a kickoff
    meeting with City staff and a stakeholder coordination meeting. The consultant will be
    expected to prepare agendas and other meeting exhibits, schedule the meeting, and
    provide meeting minutes for review. The consultant may opt to host additional, brief,
    coordination meetings with City staff to ensure that the project timeline is met. Remote
    meeting options, such as Microsoft Teams, can be utilized by the consultant.
    Stakeholder Coordination
    The consultant will be responsible for coordination with the various stakeholders for this
    project. The City has identified both Essentia Health, the primary adjacent property
    owner and Minnesota Power, provider of electrical power and owner of some existing
    street lighting, as the primary stakeholders. The City does not expect to hold public
    meetings specific to this project. Proposer shall be aware that the City is currently under
    contract with Short Elliot Hendrickson (SEH) to perform design services for a
    reconstruction of 4th Street. Coordination with that design team may be required to
    complete a cohesive project.
    2. Project Reconnaissance
    Proposer shall be responsible for visiting the site to identify the existing conditions. The City will
    provide available as-built information for the proposer's review. The proposer should expect to
    provide some survey services in this project - both to locate existing utilities and any potential
    impacts to accessible facilities that are required to complete the lighting installation. The City
    will provide geotechnical information, to the extent available, for adjacent streets. Any
    subsequent geotechnical work will be considered extra work and outside of the scope of this
    proposal.
    3. Preliminary and Final Engineering Design
    The consultant will be responsible for preparing full engineering design plans and project special
    provisions for this project, suitable for bidding and construction. This design will supplement
    existing City standard specifications, and applicable MnDOT standards specifications and
    standard plans. The City will provide boilerplate special provisions language for consultant use
    in preparing these documents.
    Page 3 of 8

    The City has prepared this proposal with the following basic lighting assumptions:
    * Each intersection will have two (2) cobrahead style lighting fixtures, located at opposite
    corners. These will be standard light poles, 30-feet in height.
    * Each street will have pedestrian scale lighting, of a post-top style, consistent with existing
    City luminaire standards.
    * This project will not replace the existing intersection lighting at the following
    intersections:
    2nd Street and 5th Avenue East
    o
    2nd Street and 6th Ave East
    o
    3rd Street and 6th Ave East
    o
    * This project will specifically replace the lighting at the intersection of 3rd Street and 5th
    Ave East.
    The project will specifically stop short of 4th Street in all locations, as the lighting on that street
    will be addressed by the 4th Street project. The consultant can assume that all lighting work
    within this project stops 75 feet away from 4th Street. The consultant may be required to perform
    coordination with that consultant, and such coordination is included in the scope of work.
    The consultant shall provide photometrics plans after a preliminary layout is prepared. The City
    assumes a project deliverable for review at the following stages:
    * 30% Design Review: Preliminary layout and photometrics. Significant design detail is
    not included. Preliminary cost estimate is prepared.
    * 60% Design Review: Final layout and photometrics. Final design layout review and
    stakeholder coordination review. Design development cost-estimate is prepared.
    * 90% Design Review: Final design review, draft project special provisions review. Final
    cost estimate is prepared.
    A final deliverable, after all reviews are completed, will consist of the design plans (in PDF
    format) signed by the engineer of record, special provisions (PDF and Microsoft Word format)
    and a final cost estimate, with individual bid items matching the bid quantities (PDF and
    Microsoft Excel format). City staff will route the design plans for internal signatures.
    4. Project Bidding
    The City will oversee bidding the project. The consultant will be available to answer clarification
    questions and if needed, preparing addendum responses. The proposers should include 16 hours
    of the project manager's time within their cost proposal for addressing questions. Actual effort
    will be billed hourly as needed.
    5. Construction Administration
    The City is planning to provide field representation for this project's construction phase at this
    time. The consultant will be required to provide review of construction concerns and project
    submittals as requested by City staff. The proposers should include 32 hours of the project
    manager's time within their cost proposal for addressing questions. Actual effort will be billed
    hourly as needed.
    Page 4 of 8

    PROJECT COMPLETION DATES
    May 12, 2026 RFP Issued
    May 26, 2026 Questions Due
    May 28, 2026 Proposals Due
    June 4, 2026 Selection of Consultant
    June 15, 2026 Council Approval to Award Contract
    July 31, 2026 30% Plan Review
    August 28, 2026 60% Plan Review
    September 25, 2026 90% Plan Review
    October/November 2026 Advertise for Bids
    December 2026 Receive Bids
    April 2027 Start Construction
    September 2027 Construction Completion
    November 2027 Submittal of Record Drawings
    QUALIFICATION PROPOSAL CONTENTS
    The proposal shall be submitted in the following format broken into the sections identified
    below. Proposals not following the specified format will not be reviewed. No additional sections
    or appendices are allowed.
    * Proposers shall include three (3) paper copies of the qualification proposal with the
    submittal.
    One (1) copy shall be unbound. The unbound copy may be secured with a binder
    o
    clip or other method that is easily removed for scanning.
    * The proposal shall be limited to ten (10) single-sided pages, not including a cover letter.
    * Proposers may opt to include one (1) single-sided page may be a single-sided 11" X 17"
    page if necessary for a project layout, workplan or other graphical design.
    * The separate cost proposal can be an 11" X 17" page.
    * Proposals that exceed the page limit will not be reviewed.
    * Proposers may use Appendix A as a cover letter, or should include all information from
    Appendix A on their cover letters, including addenda acknowledgements.
    The proposal format shall be as follows:
    1. Goals and Objectives
    A brief restatement of the goals and objectives and the project tasks to demonstrate the
    responder's review and understanding of the project.
    2. Similar Project Experience
    An outline of the responder's background and experience with similar projects, providing
    lighting design on roadways in urban areas.
    3. Personnel
    Identify key personnel to conduct the project and detail their training and work
    experience. Identify how personnel proposed for this project were involved with the
    Page 5 of 8

    projects listed as experience. Identify a professional engineer registered in the State of
    Minnesota who will oversee the overall project and be responsible for certifying the plans
    and special provisions. Once the project is awarded, no change in key personnel assigned
    to the project will be permitted without approval of the City.
    4. Knowledge of Duluth Requirements and Pre-qualification
    Include a description of the firm's knowledge of City of Duluth Engineering Guidelines
    and Construction Standards. Firms must hold prequalification 14.3 with the Minnesota
    Department of Transportation (Roadway Lighting Design). Proposers that do not hold
    prequalification 14.3 will not be considered for this project.
    5. Work Plan
    Include a detailed work plan identifying the work tasks to be accomplished and the
    budget hours to be expended on each task and subtask. The budget hours shall be in
    chart/spreadsheet format, including each proposed task and the number of hours for each
    staff person on that task. The work plan shall also identify the deliverables of key
    milestones in the project as well as any key information or responsibilities identified
    within this request that are the City's responsibility.
    6. Work Schedule
    An anticipated work schedule shall also be provided. The work schedule shall identify all
    key milestone dates.
    7. References
    Provide names, email addresses, and telephone numbers of at least three (3) references
    for whom the respondent has performed similar street and utility construction services.
    References shall not include City of Duluth staff.
    COST PROPOSAL CONTENTS
    Provide one (1) unbound copy of the cost proposal in a separate sealed envelope, clearly marked
    on the outside "Cost Proposal" along with the responder's official business name and address.
    Terms of the proposal as stated must be valid for the project length of time.
    The consultant must include a not to exceed total project cost, as well as subtotals for design
    services, bidding, and any sub consultant fees. The cost proposal shall include all of the
    following:
    * A cover/transmittal letter
    * A breakdown of the hours by task for each employee. This shall be in the same format as
    the work plan in the Qualifications Proposal with the addition of costs.
    * Hourly rates for each specific employee proposed (not general rates by category).
    * Identification of anticipated direct expenses and rates for miscellaneous charges such as
    mileage and copies.
    * Identification of any assumption made while developing this cost proposal.
    * Identification of any cost information related to additional services or tasks. Include this
    in the cost proposal but identify it as additional costs and do not make it part of the total
    Page 6 of 8

    Item Percent
    1 Personnel and firm experience 15%
    2 Work Plan and Schedule 15%
    3 Project Understanding 20%
    4 History (completeness, timeliness and budget compliance) of past work on a similar government project 10%
    5 Project costs/fees 40%

    project cost.
    * Proposals must be signed by an authorized official. If the official signs the Proposal
    Cover Sheet attached as Appendix A, this requirement will be met.
    * The Consultant must not include any cost information within the body of the RFP
    qualification proposal response.
    SELECTION
    The proposals will be reviewed by City Staff. The intent of the selection process is to review
    proposals and make an award based upon qualifications as described herein. A 100-point scale
    will be used to create the final evaluation recommendations. The factors and weighting on which
    proposals will be judged are:
    Item Percent
    1 Personnel and firm experience 15%
    2 Work Plan and Schedule 15%
    3 Project Understanding 20%
    4 History (completeness, timeliness and budget compliance) of past work on a 10%
    similar government project
    5 Project costs/fees 40%
    Proposals will be evaluated on a best value basis with 60% qualifications and 40% cost
    consideration. The review committee will not open the cost proposal until after the qualification
    points have been awarded. Cost proposals will only be opened for the three top ranked firms. The
    City anticipates that the evaluation and selection will be completed by June 4, 2026.
    SUBMITTAL DATE
    Submit unbound original in an envelope marked, "26-99484 RFP for Eng Svcs for Medical
    District Lighting Improvements" by 3:00 PM CDT, May 28, 2026 to:
    Patrice Stalvig, Purchasing Agent
    City of Duluth - Purchasing Department
    411 W 1st Street, Room 120 City Hall
    Duluth, MN 55802
    Digital copies of proposals may be requested of proposers after proposal due date.
    CONTACT
    All questions concerning the project shall be submitted before Tuesday, May 26 and shall be
    directed to:
    Joe Jurewicz, P.E., Senior Engineer
    City of Duluth - Engineering Division
    411 W 1st Street, Room 240 City Hall
    Page 7 of 8

    Duluth, Minnesota 55802
    jjurewicz@duluthmn.gov
    (218) 730-5095
    ADDENDA
    If the City deems it necessary to revise any part of this RFP before the proposal response date,
    the City will post an addendum to its website http://www.duluthmn.gov/purchasing/bids-
    request-for-proposals/. Although an e-mail notification will be sent, it is the Proposer's
    responsibility to periodically check the website for any new information. Any addenda issued
    must be acknowledged on the proposal cover sheet (attached as Appendix A).
    LIMITATIONS
    This Request for Proposal does not commit the City of Duluth to award a contract or pay costs
    incurred in the preparation of the proposal, or to procure a contract for services or supplies.
    The Proposal shall not in any way include any restrictions on the City of Duluth. The Consultant
    shall NOT provide proposed contract language.
    The City of Duluth specifically reserves the right to accept or reject any or all proposals, to
    negotiate with any qualified source, to cancel in part or in its entirety the Request for Proposal, to
    waive any requirements, to investigate the qualifications of any proposal, to obtain new
    proposals, or proceed to have the service provided in any way as necessary to serve the best
    interests of the City of Duluth.
    The selected consultant must sign the City of Duluth Standard Professional Engineering Services
    Agreement, a sample of which is available at https://duluthmn.gov/purchasing/forms/. Any
    questions concerning this agreement should be asked PRIOR to proposal submittal. These
    questions should be directed to Joe Jurewicz in the City Engineering Office.
    All materials submitted in response to this RFP will become property of the City and will
    become public record after the evaluation process is complete and an award decision made.
    Prior to entering into an agreement with the City, the Consultant shall furnish proof that it has
    met all legal requirements for transacting business in the State of Minnesota.
    By submitting a proposal, each Bidder understands, represents, and acknowledges that:
    a. Their proposal has been developed by the Bidder independently and has been
    submitted without collusion with and without agreement, understanding, or
    planned common course of action with any other vendor or suppliers of materials,
    supplies, equipment, or services described in the Request for Proposals, designed
    to limit independent bidding or competition, and that the contents of the proposal
    have not been communicated by the Bidder or its employees or agents to any
    person not an employee or agent of the Bidder.
    Page 8 of 8

    b. There is no conflict of interest. A conflict of interests exists if a Bidder has any
    interest that would actually conflict, or has the appearance of conflicting, in any
    manner or degree with the performance of work on the project. If there are
    potential conflicts, identify the municipalities, developers, and other public or
    private entities with whom your company is currently, or have been, employed
    and which may be affected.
    c. It is not currently under suspension or debarment by the State of Minesota, any
    other state, or the federal government.
    d. The company is either organized under Minnesota law or has a Certificate of
    Authority from the Minnesota Secretary of State to do business in Minnesota, in
    accordance with the requirements in M.S. 303.03
    Page 9 of 8

    Bidder Information:
    Bidder Name
    Mailing Address
    Contact Person
    Contact Person's Phone Number
    Contact Person's E-Mail Address
    Federal ID Number
    Authorized Signature
    Name & Title of Authorized Signer
    Email of Authorized Signer

    APPENDIX A - PROPOSAL COVER SHEET
    CITY OF DULUTH
    RFP# 26-99484 for Engineering Services for Medical District Lighting Improvements
    Bidder Information:
    Bidder Name
    Mailing Address
    Contact Person
    Contact Person's Phone Number
    Contact Person's E-Mail Address
    Federal ID Number
    Authorized Signature
    Name & Title of Authorized Signer
    Email of Authorized Signer
    ACKNOWLEDGEMENT OF ADDENDA
    ADDENDUM # INITIAL/DATE
    ADDENDUM # INITIAL/DATE
    ADDENDUM # INITIAL/DATE
    ADDENDUM # INITIAL/DATE
    ADDENDUM # INITIAL/DATE

    This page summarizes the opportunity, including an overview and a preview of the attached documents.
    * Disclaimer: This website provides information about bids, requests for proposals (RFPs), or requests for qualifications (RFQs) for convenience only and does not serve as an official public notice. Individuals who wish to respond to or inquire about bids, RFPs, or RFQs should contact the relevant government department directly.

    Sign-up for a Free Trial, Government Bid Alerts

    With Free Trial, you can:

    You will have a full access to bids, website, and receive daily bid report via email and web.

    Try One Week FREE Now

    See Also

    ENGINEERING SERVICES. SouthWest Transit is soliciting proposals from firms interested in providing engineering

    League of Minnesota Cities

    Bid Due: 8/10/2026

    CIVIL LEGAL SERVICES. The City of Mora, Minnesota, is seeking proposals from qualified

    League of Minnesota Cities

    Bid Due: 8/31/2026

    CIVIL LEGAL SERVICES. The City of Mora, Minnesota, is seeking proposals from qualified

    League of Minnesota Cities

    Bid Due: 8/31/2026

    26-30 Civil Engineering Services for Development of a 4-acre housing site (83rd Street

    City of Bloomington

    Bid Due: 8/06/2026