RFP for Construction Services for TH 36 and CSAH 17

Agency: Washington County
State: Minnesota
Type of Government: State & Local
NAICS Category:
  • 236220 - Commercial and Institutional Building Construction
Posted Date: Nov 10, 2025
Due Date: Dec 5, 2025
Original Source: Please Login to View Page
Contact information: Please Login to View Page
Bid Documents: Please Login to View Page
Bid Title: RFP for Construction Services for TH 36 and CSAH 17
Category: Washington County Public Works
Status: Open
Description:

The purpose of this Request for Proposals (RFP) is for Washington County to secure services for Construction Administration, Inspection, and Surveying Services for the TH 36 and CSAH 17 Intersection Improvement Project.

Publication Date/Time:
11/10/2025 12:00 PM
Closing Date/Time:
12/5/2025 3:00 PM
Contact Person:
Allan Brandt, Construction Engineer
allan.brandt@washingtoncountymn.gov
Related Documents:

Attachment Preview

Request for Proposals (RFP) for
Construction Administration, Inspection, and Surveying
Services
Trunk Highway (TH) 36 and County State Aid Highway (CSAH) 17
Intersection Improvement Project
RFP release date: November 10, 2025
Submission due date: December 5, 2025
Government Center | 14949 62nd Street North | P. O. Box 6 | Stillwater, MN 55082-0006
P: 651-430-6001 | F: 651-430-6017 | TTY: 651-430-6246
www.washingtoncountymn.gov
Washington County is an equal opportunity organization and employer
Table of Contents
1. Project Information........................................................................................................................................... 3
2. Roles and Responsibilities ................................................................................................................................. 4
3. Scope of Services............................................................................................................................................... 7
4. Proposal Content............................................................................................................................................... 9
5. Proposal Submittal .......................................................................................................................................... 10
6. Proposal Evaluation......................................................................................................................................... 11
7. Proposal Questions ......................................................................................................................................... 12
Appendix A – County’s Standard Terms and Conditions ................................................................................. 13
Page |2
Construction Administration, Inspection, and Surveying Services – TH 36 & CSAH 17
1. Project Information
The purpose of this Request for Proposals (RFP) is for Washington County to secure services for Construction
Administration, Inspection, and Surveying Services for the TH 36 and CSAH 17 Intersection Improvement
Project. The map below shows the project location. The anticipated construction start date will be in early
Summer 2026 and continue through the fall of 2027.
The project includes constructing an interchange at the TH 36 and CSAH 17 intersection. In addition, a
frontage road will be constructed along the south side of TH 36 between CSAH 17 and Keats Ave and
realigning the existing frontage road with retaining walls along the north side of TH 36.
Page |3
Construction Administration, Inspection, and Surveying Services – TH 36 & CSAH 17
2. Roles and Responsibilities
2.1. Washington County Organizational Chart
Washington County has developed the following Organizational Chart to provide a framework to clearly
identify project administration and inspection roles on a typical construction project.
Page |4
Construction Administration, Inspection, and Surveying Services – TH 36 & CSAH 17
2.2. Washington County Construction Responsibilities
The responsibilities for each role identified in the Construction Organizational Chart have been established
to ensure that the project is constructed in conformance with the construction contract and that all required
documentation, testing, etc. is completed to comply with the contract and funding sources. Based on project
needs, these responsibilities may be shifted or shared amongst team members.
2.2.1.
Construction Engineer
- Construction issue decision maker
- Coordinate consultant activities with Washington County construction group
- Approve/advise on changes and extra work
- Approve partial payments
- Review and approve final estimate
- Review project schedule
- Fulfill role of Engineer as described in MNDOT 1501
2.2.2.
Project Engineer
- Administrative Point of Contact for the construction contract
- Ensure contract compliance
- Schedule, prepare, and present preconstruction meeting
- Prepare and present weekly construction meetings
- Prepare and review pay estimates
- Verify internal funding
- Prepare Change Orders
o Verify costs with funding partners
o Verify 7% contingency
- Maintain Administrative Files & Documentation
o Review & distribute submittals & shop drawings
o Review & ensure contract compliance of materials incorporated into the project
o Review material test results and determine necessary corrective actions
- Outside Communication
o Weekly updates, web, Facebook (work with Communication Coordinator/Business
Liaison)
o Advanced notice for businesses, residents, agencies, etc.
- Design Issue decision maker
o Design clarifications
o Design changes
- Formal contractor correspondence
- Review of contractor’s project schedule
- Permit execution
- Utility planning & coordination
- Lead SWPPP site inspections
- Coordinate State Aid final inspection
- Coordinate and review final materials testing report for material exception/deducts
- Project closeout
2.2.3.
Inspector(s)
- Attend preconstruction meeting
- Serve as field/construction point of contact
- Provide daily and consistent correspondence with the contractor
- Attend and participate in weekly construction meetings
Page |5
This page summarizes the opportunity, including an overview and a preview of the attached documents.
* Disclaimer: This website provides information about bids, requests for proposals (RFPs), or requests for qualifications (RFQs) for convenience only and does not serve as an official public notice. Individuals who wish to respond to or inquire about bids, RFPs, or RFQs should contact the relevant government department directly.

Sign-up for a Free Trial, Government Bid Alerts

With Free Trial, you can:

You will have a full access to bids, website, and receive daily bid report via email and web.

Try One Week FREE Now

See Also

Follow Repair AMSA/ECS- Arden Hills Army Reserve Center, Minnesota Active Contract Opportunity Notice

DEPT OF DEFENSE

Bid Due: 8/31/2026

Project: 2026 Variable Air Volume (VAV) Box Replacement Ref. #: Solicitation184 Department: Airport

Metropolitan Airports Commission (MAC)

Bid Due: 8/18/2026

Follow LaCroix Insulate Fire Garage Active Contract Opportunity Notice ID Related Notice Department/Ind.

AGRICULTURE, DEPARTMENT OF

Bid Due: 8/26/2026

Bid Title: 24-17 - Weaver Lake Road Rehab Category: General bid opportunities Status:

City of Maple Grove