RFB - South Pool Renovation

Agency: Town of Superior
State: Colorado
Type of Government: State & Local
NAICS Category:
  • 236220 - Commercial and Institutional Building Construction
Posted Date: Apr 1, 2026
Due Date: Apr 29, 2026
Original Source: Please Login to View Page
Contact information: Please Login to View Page
Bid Documents: Please Login to View Page
  • RFB - South Pool Renovation (PDF, 469KB)

    Work: South Pool Renovation

    Work No.: PW-2026-05

    Submittal Date and Location:

    Date of Request: April 1, 2026

    Due Date for Bids: April 29 by 2:00 P.M.

    Submit one copy of the Bid to:

    Jordan Hayes
    South Pool Renovation
    Town of Superior
    124 E. Coal Creek Drive
    Superior, CO 80027

    Mandatory Pre-Bid Meeting:

    Date & Time: Thursday, April 9, 2026 10:00 A.M.

    Location: South Pool
    3300 Huron Peak Ave
    Superior, CO 80027

    Bidders are required to attend the pre-bid meeting. If pre-bid meeting is required, Bids will not be accepted from bidders that do not attend.

    The Town of Superior requests Bids for:

    A complete renovation of South Pool (3300 Huron Peak Ave) - a 150,000-gallon outdoor community pool. The project will include an all new pool, splash pad, and run-out slide, as well as a renovation of the bathhouse.

  • Attachment Preview

    100% CD
    Job #: 2025.082
    MARCH 27, 2026

    PROJECT MANUAL
    Superior South Pool
    Superior, Colorado
    100% CD
    Job #: 2025.082
    MARCH 27, 2026

    SECTION003100
    AVAILABLEPROJECTINFORMATION
    PART1 GENERAL
    1.01 EXISTINGCONDITIONS
    A. Certaininformationrelatingtoexistingsurfaceandsubsurfaceconditionsandstructuresisavailableto
    ContractorbutwillnotbepartofContractDocuments,asfollows:
    B. GeotechnicalReport: GeotechnicalInvestigation,SuperiorSouthSwimmingPoolReplacement,3300
    HuronPeakAvenue,Superior,Colorado 80027;preparedbyCTL/Thompson;ProjectNo.DN52801-125,
    datedFebruary4,2026.
    1. AcopyisincludedimmediatelyfollowingthisSection.
    2. GeneralInformation:
    a. Thisreportidentifiespropertiesofbelowgradeconditionsandoffersrecommendationsforthe
    designoffoundationsandotherconstructionelements,preparedprimarilyforuseofArchitectand
    otherdesignteamconsultants.
    b. RecommendationscontainedinthisdocumentshallnotbeconstruedasrequirementsofContract
    Documents.
    c. Interpretation: Reportisprovidedonlyforinformationandconvenience. OwnerandArchitect
    disclaimresponsibilityforaccuracy,truelocationandextentofsubsurfaceconditionsthathave
    beenevaluatedandreportedbyothers. OwnerandArchitectfurtherdisclaimresponsibilityfor
    interpretationofreportdatabyContractor;includingbutnotlimitedtoprojectingsoilbearing
    values,rockprofiles,soilstability,orpresence,level,andextentofundergroundwaterorother
    potentiallydeleterioussubstances.
    d. ApplicableRequirements: Specificandvariablerecommendationscontainedinthisdocument
    aresubjecttoacceptancebyOwnerforincorporationinContractDocumentspreparedby
    Architectandotherdesignteamconsultants. ComplywithrequirementsspecifiedinContract
    Documentsforearthwork,pavingsystems,andotherapplicableworkscopeitems.
    PART2 PRODUCTS-NOTUSED
    PART3 EXECUTION-NOTUSED
    ENDOFSECTION
    2025.082 003100-1 3/27/2026
    Superior,COSouthPool AVAILABLEPROJECTINFORMATION 100%ConstructionDocuments

    This page intentionally left blank

    GEOTECHNICAL INVESTIGATION
    SUPERIOR SOUTH SWIMMING POOL REPLACEMENT
    3300 HURON PEAK AVENUE
    SUPERIOR, COLORADO 80027
    Prepared For:
    BARKER RINKER SEACAT ARCHITECTURE
    990 South Broadway, Suite 222
    Denver, Colorado 80209
    Attention: Ms. Mary Schambach
    Project No. DN52801-125
    February 4, 2026
    CTL|Thompson, Inc.
    Denver, Fort Collins, Colorado Springs, Glenwood Springs, Pueblo, Summit County - Colorado
    Cheyenne, Wyoming and Bozeman, Montana

    TABLE OF CONTENTS
    SCOPE ............................................................................................................................ 1
    SUMMARY OF CONCLUSIONS ..................................................................................... 1
    SITE CONDITIONS ......................................................................................................... 2
    PROPOSED CONSTRUCTION ...................................................................................... 3
    INVESTIGATION............................................................................................................. 4
    SUBSURFACE CONDITIONS ........................................................................................ 5
    Fill ......................................................................................................................... 5
    Natural Clay and Bedrock ..................................................................................... 6
    Groundwater ......................................................................................................... 6
    Seismicity ............................................................................................................. 6
    SITE DEVELOPMENT .................................................................................................... 7
    Existing Fill ........................................................................................................... 7
    Expansive Soils .................................................................................................... 8
    Soft Soils .............................................................................................................. 8
    Excavation ............................................................................................................ 9
    Fill Placement ....................................................................................................... 9
    FOUNDATIONS ............................................................................................................ 10
    Spread Footings ................................................................................................. 11
    SWIMMING POOL AND POOL DECK .......................................................................... 11
    Swimming Pool ................................................................................................... 12
    Pool Deck ........................................................................................................... 12
    Exterior Flatwork ................................................................................................. 13
    BELOW-GRADE CONSTRUCTION .............................................................................. 13
    CONCRETE .................................................................................................................. 13
    CORROSIVITY ............................................................................................................. 14
    SURFACE DRAINAGE ................................................................................................. 16
    CONSTRUCTION OBSERVATIONS ............................................................................ 16
    GEOTECHNICAL RISK ................................................................................................. 17
    LIMITATIONS ................................................................................................................ 17
    FIG. 1 - LOCATION OF EXPLORATORY BORINGS
    FIG. 2 - SWIMMING POOL PERIMETER DRAIN DETAIL
    APPENDIX A - SUMMARY LOGS OF EXPLORATORY BORINGS
    APPENDIX B - LABORATORY TEST RESULTS
    TABLE B-1 - SUMMARY OF LABORATORY TESTING
    BARKER RINKER SEACAT ARCHITECTURE
    SUPERIOR SOUTH SWIMMING POOL REPLACEMENT
    CTL|T PROJECT NO. DN52801-125 R1

    This page summarizes the opportunity, including an overview and a preview of the attached documents.
    * Disclaimer: This website provides information about bids, requests for proposals (RFPs), or requests for qualifications (RFQs) for convenience only and does not serve as an official public notice. Individuals who wish to respond to or inquire about bids, RFPs, or RFQs should contact the relevant government department directly.

    Sign-up for a Free Trial, Government Bid Alerts

    With Free Trial, you can:

    You will have a full access to bids, website, and receive daily bid report via email and web.

    Try One Week FREE Now

    See Also

    General Information Document ID DQ1-PMAA-2027000032-1 Status Open Description HPSF, SF2501T11, Government Creek OHV

    State Government of Colorado

    Bid Due: 8/12/2026

    Description: RFQ Governor's Mansion Parking Lot Redevelopment Project Department: DPA - Executive Director

    State Government of Colorado

    Bid Due: 1/01/2099

    Project ID: RFP 126DM011 Title: Dayton Station Painting Project- Phase 2 Addenda: 0

    Regional Transportation District - Denver

    Bid Due: 8/28/2026

    Bid Number: IFB-SN-2026-27 Bid Title: Rollingstone Sewer Main Replacement Category: 2026 Bid's &

    Steamboat Springs

    Bid Due: 8/17/2026