RFB | Mt. Tolman, raise the crown base height

Agency: The Confederated Tribes of the Colville Reservation
State: Washington
Type of Government: State & Local
NAICS Category:
  • 237990 - Other Heavy and Civil Engineering Construction
Posted Date: Apr 28, 2026
Due Date: May 15, 2026
Original Source: Please Login to View Page
Contact information: Please Login to View Page
Bid Documents: Please Login to View Page

RFB | Mt. Tolman, raise the crown base height | Closing Date May 15, 2026 PDF

Attachment Preview

P [sd an & Confederated Tribes of the Colville Reservation
guts Mt. Tolman Fire Center
eee P.O. Box 188
Keller, Washington 99140
509-634-3100
Fax: 509-634-3149

BIDDING INFORMATION

It is the responsibility of the bidder to look at the site to be contracted, evaluate the amount of
work needed on each pay item and bid accordingly. The main intent here is to raise the crown
base height. Follow specifications as identified in the general specifications that are attached to
this IFB. Any changes to the contract specifications need to be discussed and agreed upon by the
COR, the districts Operation Technicians, and approved by the Contract Officer.

e All bids will be received by May 15, 2026.

Contract start date is projected June 01, 2026.

The Colville Tribe requires a minimum of $1,000,000 of general contractor's liability
insurance prior to start of work; time will begin when contract is signed.
(C) Contractors should be aware that the Colville Tribes will comply with all IRS tax
reporting requirements. Any monies paid to the contractor in connection with this

contract will be reported as required to the IRS. The Colville Tribes will issue Form 1099

to the contractor for tax reporting purposes as required by the IRS at the end of the year.
General and Technical Specifications for this project are attached.
Sams.gov and apply for a Unique Entity ID
Bids for this project will be selected based on several criteria which includes, but not

limited to:
o The most responsive, responsible bid
(C) Indian preference
(C) Past performance
ABid Evaluation Information sheet is attached and will need to be completed and
returned with your bid.
A Bid Sheet (Exhibit B) is attached and will need to be filled out and returned with your
bid packet.
Awork plan (Exhibit E) is attached and will need to be filled out and returned with your
bid packet.
The Colville Confederated Tribes, reserves the right to negotiate additional blocks/acres
in the event it is in the best interest of the Tribes.
The following equipment is recommended to successfully complete this contract:

a. Chainsaw
b. Pruner (Gas powered or Manual)
c. Compliance with all equipment manufacturer, Federal, and State laws,

regulations and instructions for work of this nature.
"This institution is an opportunity provider"

Bid Evaluation Information
Please complete the following information and return this document with your bid.
Bidder Name:

Contract Name:

1. Do you currently hold any other contracts? __Yes No
If yes please provide the following information:
Type of contract:
Agency or office issuing the contract:
Scheduled contract completion date:

2. Have you successfully completed similar contracts in the past?
Yes No

If yes please provide the following information:
Type of contract:

Agency or office issuing the contract:

Year contract completed:

Contact phone number of office issuing contract:

Contact of COR Name:

3. Do you own the recommended equipment necessary to successfully complete this
contract? Yes No

4. Do you qualify as an Indian owned business as defined by TERO?

<

es No

|

If yes indicate type of ownership below:

100% Colville business enterprise
Colville family business enterprise
Colville business enterprise

Indian business enterprise

5. Will you subcontract any of the work? __Yes No
If yes provide the following information:
Name of subcontract business:
Is the subcontract business Indianowned? ___-Yes No
If yes indicate type of ownership below:
100% Colville business enterprise
Colville family business enterprise

Colville business enterprise
Indian business enterprise

6. I will provide proof of insurance the day the contract is signed. Time starts the day I sign
the contract. Work will not start until I have proof of insurance. I will have a valid
insurance policy that provides $ 1,000,000 worth of general contractor liability insurance
as specified by the contract for property damage that may arise out of work under this
Contract, whether directly or indirectly by Contractor, or directly or indirectly by a
subcontractor.

Yes No

7. Unique Entity ID (Sam.Gov)

LADDER FUEL REDUCTION
CHAINSAW THINNING/PRUNING AND HANDPILING
TECHNICAL SPECIFICATIONS

1) Objective

Modify the fuels within the treatment area in such a way as to keep a wildfire burning on
the ground, reduce fire intensity, and provide a defensible space. This is to be
accomplished by creating stand conditions that are open and park like. Ideally when the

2) Phases of Work
Chainsaw thinning/ladder fuel reduction consists of cutting unwanted vegetation, pruning
limbs off the remaining standing trees and hand piling slash if required.

3) Selection of Leave Trees
In order to determine which trees are to be cut, the contractor needs to identify those trees
that are the most desirable to leave. As the contractor and crew works
through an area they should be looking ahead at the next patch of trees and select the best

is available.

4) Thinning Specifications

A.

Cut snags as directed by the COR: The intent is to leave 2-3 snags per acre greater
than 8 Inches DBH when present.

Cut trees less than or equal to 8 inches DBH to provide growing space for the
remaining trees. Space trees so they are free to grow and the crowns have room to
expand. Five to ten feet of unoccupied space between the branch tips of adjacent
trees is desirable. Spacing between trees will vary based on the size of the tree
left. Larger trees will be spaced wider then smaller trees. Average spacing should
be no less than 16" by 16" but may be greater based on the size of the trees left.
Trees cut should be from the intermediate and suppressed crown classes. In some
cases co-dominants may be cut to create growing space if they are equal to or less
than 8 inch DBH.

When the area is to be hand piled, or as directed by the COR cut all shrubs greater
than two feet in height. The COR may specify certain shrub species be left as a
wildlife food source.

. All stems shall be cut below the lowest live limb and stumps shall not exceed one

half the stump diameter.

. All cut stems shall be completely severed from the stump.

All stumps are to have a flat cut surface (no pointy stumps).

When hand piling is required buck all stems into lengths three to six feet long to
allow for handling or when specified to accelerate the natural decomposition
process.

. Remove all limbs from stem for hand pilling.

Measurement for Diameter at Breast Height (DBH) illustiatioi.

4) Be certain dbh Is measur:

the uphill ide. If = tree

Tree Crown Classification Illustration

D = Dominsat = i Ie
Ss Suppressed 'Mz Mortality Weol

Crown Ratio Calculation

Crown ratio % = length of live crown X 100
Total tree height

Examples

X

c 0

" ra
65% 45% 35%

Above illustrations from Keen, 1936
Pruning Illustrations from Forestry Handbook, Karl F. Wenger

PRUNING
TECHNICAL SPECIFICATIONS

Pruning Specifications

A. Prune limbs from trees to a height of 12 feet or a 50 percent crown ratio whichever is

less.

B. Use proper pruning techniques listed below and refer to attached pruning illustration.

Make smooth cuts

Never cut the branch collar

Never leave protruding stubs

Precut large heavy limbs to prevent splitting or peeling of bark.

C. Branch stubs should not exceed 1 1/2 inches in length.

Fig. 7. Precut large limbs to prevent splitting or pecting of bark; first cut at A, second at B, and final

out at C.

10

HAND PILING
TECHNICAL SPECIFICATIONS

Hand Piling Specifications

A.

Both new and old slash is to be hand piled Pieces larger than eight inches in
diameter do not need to be piled but limbs should be removed and piled.

Piles are to be constructed in openings located away from leave trees to prevent
scorching leave trees when the piles are burned. Do not locate piles underneath
overhead wires. Do not locate piles within 50 feet of structures or other
improvements that could be damaged by heat or fire.

Piles shall be taller than they are wide. Minimum pile size four feet in diameter,
five feet tall. Maximum pile size is six feet in diameter and eight feet tall. Adjust
the size of the pile to reflect the size of the opening it is built in. Small openings
between trees require small piles.

Pile limbwood first then add stemwood to top of pile see attached hand piling
specification photos .

Build compact piles. Fuels within the pile need to be compact enough to facilitate
burning. Trim pieces that extend from the pile more than thirty inches then place
trimmed pieces on the pile.

Cover piles with kraft paper. Pile limbwood first then trim the pile to remove
material that may puncture the kraft paper. Cover the pile with a piece of kraft
paper. Stand stem wood on end around pile on top of the kraft paper to keep the
paper from blowing off.

Recommended Tools.

Chainsaw

11

This page summarizes the opportunity, including an overview and a preview of the attached documents.
* Disclaimer: This website provides information about bids, requests for proposals (RFPs), or requests for qualifications (RFQs) for convenience only and does not serve as an official public notice. Individuals who wish to respond to or inquire about bids, RFPs, or RFQs should contact the relevant government department directly.

Sign-up for a Free Trial, Government Bid Alerts

With Free Trial, you can:

You will have a full access to bids, website, and receive daily bid report via email and web.

Try One Week FREE Now

See Also

Follow WADS GSA CLASS 5 IPS Container purchase Active Contract Opportunity Notice ID

DEPT OF DEFENSE

Bid Due: 7/27/2026

Follow HANEL LEAN LIFT CABINET (SOLE SOURCE) Active Contract Opportunity Notice ID SPMYM226Q7575

DEPT OF DEFENSE

Bid Due: 8/07/2026

Follow LOCKERS Active Contract Opportunity Notice ID W911S226U3806 Related Notice Department/Ind. Agency DEPT

DEPT OF DEFENSE

Bid Due: 7/30/2026

Abstract: G&S Solicitation KC001693 Title RFP-Behavioral Health and Recovery Division's (BHRD) Needs Survey

King County

Bid Due: 8/14/2026