RFB Metal Building Rehab for Brook Forest Estates

Agency: Clear Creek County
State: Colorado
Type of Government: State & Local
NAICS Category:
  • 236220 - Commercial and Institutional Building Construction
Posted Date: May 4, 2026
Due Date: May 15, 2026
Solicitation No: PW26-06
Original Source: Please Login to View Page
Contact information: Please Login to View Page
Bid Documents: Please Login to View Page
Bid Number: PW26-06
Bid Title: RFB Metal Building Rehab for Brook Forest Estates
Category: Road and Bridge
Status: Open
Description:

PW 26-06 METAL BUILDING REHAB FOR BROOK FOREST ESTATES

Clear Creek County

Request for Bids

The Project includes the following Work:

Rehab of a 40 by 40-foot corrugated metal building located at 45 Apache Road, Evergreen, Colorado 80439. The work consists of roof replacement, side wall replacement, door replacement, new trim, and weatherproofing.

Obtaining the Bidding Documents

Information and Bidding Documents for the Project can be found at the following designated website:

https://www.clearcreekcounty.us/bids.aspx

Prospective Bidders may email Stacey Canada, Capital Projects Manager, with any questions or concerns.

Email For security reasons, you must enable JavaScript to view this E-mail address. ; subject line PW 26-06.

TIME SCHEDULE

The County will endeavor to use the following timetable for the Bid process through to the completion of construction:

May 4, 2026                                                        Request for Bid publicly advertised and available to Bidders

May 15, 2026 at 5:00 PM                              Bids submittals due

June 9, 2026                                                        Anticipated contract award date

June 16, 2026                                                     Anticipated earliest issue of Notice to Proceed

October 31, 2026                                              Substantial Completion

November 30, 2026                                         Ready for Final Payment

BID SUBMITTAL INFORMATION

All Bids for the construction of the Project will be received until 5:00 PM local time on Friday, May 15, 2026 by means of a PDF copy emailed to:

Email: For security reasons, you must enable JavaScript to view this E-mail address. ; subject line: PW 26-06 Submittal

Bid Submittal must include the following forms and documentation:

  • Bid Form
  • Qualifications Statement
  • List of Subcontractors

All Work shall be constructed in accordance with the Specifications and Contract Documents provided in the Bidding Documents. All Bids shall be made on the Bid Form furnished in the Bidding Documents. Complete submittals must be submitted as a PDF.

The County reserves the right to reject any or all bids, to re-advertise for new bids and to waive informalities that may be in the best interest of the County.

Publication Date/Time:
5/4/2026 12:00 PM
Closing Date/Time:
5/15/2026 5:00 PM
Submittal Information:
All submittal information is in the Bid Posting below
Contact Person:
Prospective Bidders may email Stacey Canada, Capital Projects Manager, with any questions or concerns and Bid Submittals.
Email scanada@clearcreekcounty.us; subject line PW 26-06.
Business Hours:
07:30-4:00 Monday - Thursday
Special Requirements:
All Work shall be constructed in accordance with the Specifications and Contract Documents provided in the Bidding Documents. All Bids shall be made on the Bid Form furnished in the Bidding Documents. Complete submittals must be submitted as a PDF.
Related Documents:

Attachment Preview

CLEAR CREEK COUNTY PUBLIC WORKS
3549 STANLEY ROAD
P.O. BOX 362
DUMONT, COLORADO 80436
REQUEST FOR BIDS
PW 26-06 METAL BUILDING REHAB
FOR BROOK FOREST ESTATES
Bids must be submitted no later than
5:00 p.m. local time on
May 15, 2026

TABLE OF CONTENTS
BIDDING REQUIREMENTS, CONTRACT FORMS AND CONDITIONS OF THE CONTRACT
1. GENERAL INFORMATION AND INSTRUCTIONS TO BIDDERS
2. SPECIFICATIONS
3. BID FORM
4. QUALIFICATIONS STATEMENT
5. CONTRACT AGREEMENT
PW26-06MetalBuildingRehabforBrookForestEstates
TableofContents

PW26-06METALBUILDINGREHABFORBROOKFORESTESTATES
GENERALINFORMATIONANDINSTRUCTIONSTOBIDDERS
CLEARCREEKCOUNTY,COLORADO
TheProjectincludesthefollowingWork:
Rehabofa40by40-footcorrugatedmetalbuildinglocatedat45ApacheRoad,Evergreen,Colorado80439.The
workconsistsofroofreplacement,sidewallreplacement,doorreplacement,newtrim,andweatherproofing.
OBTAININGTHEBIDDINGDOCUMENTS
InformationandBiddingDocumentsfortheProjectcanbefoundatthefollowingdesignatedwebsite:
https://www.clearcreekcounty.us/bids.aspx
ProspectiveBiddersmayemailStaceyCanada,CapitalProjectsManager,withanyquestionsorconcerns.
Emailscanada@clearcreekcounty.us;subjectlinePW26-06.
TIMESCHEDULE
The County will endeavor to use the following timetable for the Bid process through to the completion of
construction:
May4,2026 RequestforBidpubliclyadvertisedandavailabletoBidders
May15,2026at5:00PM Bidssubmittalsdue
June9,2026 Anticipatedcontractawarddate
June16,2026 AnticipatedearliestissueofNoticetoProceed
October31,2026 SubstantialCompletion
November30,2026 ReadyforFinalPayment
BIDSUBMITTALINFORMATION
AllBidsfortheconstructionoftheProjectwillbereceiveduntil5:00PMlocaltimeonFriday,May15,2026by
meansofaPDFcopyemailedto:
Email:scanada@clearcreekcounty.us;subjectline:PW26-06Submittal
BidSubmittalmustincludethefollowingformsanddocumentation:
* BidForm
* QualificationsStatement
* ListofSubcontractors
All Work shall be constructed in accordance with the Specifications and Contract Documents provided in the
Bidding Documents. All Bids shall be made on the Bid Form furnished in the Bidding Documents. Complete
submittalsmustbesubmittedasaPDF.
The County reserves the right to reject any or all bids, to re-advertise for new bids and to waive informalities
thatmaybeinthebestinterestoftheCounty.
PW26-06GeneralInformationandInstructionstoBidders
Page1of1

PW 26-06 METAL BUILDING REHAB IN BROOK FOREST ESTATES
SPECIFICATIONS
PROJECT
Thisprojectincludestherehabofa40by40-footcorrugatedmetalbuildinglocatedat45ApacheRoad,
Evergreen, Colorado 80439. The work consists of roof replacement, side wall replacement, door
replacement,newtrim,andweatherproofing.
PROJECTTIMELINE
* AnticipatedcontractawardonorbeforeJune9,2026
* SubstantialcompletionbyOctober31,2026
* ReadyforfinalpaymentbyNovember30,2026
PERMITS&LICENSING
ContractorshallregisterasalicensedContractor(minimumClassD)withtheCountythroughthePermit
&LicensingPlatform:https://clearcreekcounty.govbuilt.com/.PermitfeeswillbewaivedbytheCounty.
CONSTRUCTIONSUBMITTALS
ContractorshallsubmitproductdataforallnewmaterialstotheEngineerforreviewandapprovalprior
tostartingwork.
SCOPEOFWORK
1) Westwallreplacement
a) Remove and dispose of damaged wall panels along 40-ft westside wall, insulation, and base
channel
b) Installnewz-girtalongthe40-ftwidthofwallatapproximately312feetabovefinishedgrade
c) Installnew40-ftbasechannel
d) Installinsideclosurestripstosealgapsbetweenmetalwallpanelsandbuildingframe
e) Installnewsteelwallpanels
i) Wallpanelcolor:armygreen
f) Installnewr19facedfiberglasswallinsulation
2) Roofreplacement
a) Removeanddisposeof40by40-ftmetalroofandinsulation
b) Removeandprotecttwo(2)existingceiling-mountedelectricunitheaters
c) Installnewcorrugatedmetalroof
i) Applybutyltapewithinthelapjointofoverlappingpanelstopreventleaks
d) Sealallgapsincludingeaves,ridge,andgableendswithclosed-cellpolyethylenepre-moldedfoam
closurestrips
e) Installnewr19facedfiberglassroofinsulation
f) Installtwo(2)pzmetalpanelstoprotectroofinsulationfromexistingelectricunitheaters
g) Reinstalltwo(2)existingceiling-mountedelectricunitheaters
3) Rolling-doorframesandtrim
a) Repairexistingstructuralsteelpostframesby"straightening"bends
b) InstallnewJtrimfortwo(2)existingrolling-doorframes,approximately14-ftby14-ft
PW26-06MetalBuildingRehabforBrookForestEstates
SPECIFICATIONS
Page1of2

i) Trimcolor:cream/beige
ii) Weatherprooftrim/frameconnectionwithexterior-gradepolyurethaneorpolyethersealant
(e.g., Titebond Weathermaster or similar) that will expand and contract with temperature
changeswithoutcracking
iii) Jtrimshallbecutandinstalledtopreventwaterfromcollectingatthecorners(e.g.,45-degree
angles rather than square-cutting) with top trim ends bent down to cover the side pieces,
ensuringwaterflowsoverthesidejointsratherthanintothem
iv) ApplysealanttoallmiteredoroverlappingcornerswheretheJtrimpiecesmeet
4) Buildingcornertrim
a) Installnewgabletrimwithclosurestripsonsoutheastoutsidebuildingcorner
b) Removeandprotectthree(3)existingbuildingcornertrim
c) Installclosurestripsalongthree(3)buildingcornersandreinstallexistingcornertrim
5) Eastwallinsulationandgapsealing
a) Closeanygapsinconcretefooterwithsprayfoaminsulation
b) Reattachfiberglassinsulationwhereithasfallenawayfromwall
6) Personneldoorreplacement
a) Removeanddisposeofexistingwooddoorandframe
b) Modifyroughopeningasneededtoaccommodatethenewdoorframe
i) ensuretheopeningisplumbandlevel
ii) doorshallcomplywithfire-ratedclearancesbetweentheframeandopening
c) Installnew36-inby80-in,90-minutefire-rated,commercial,pre-hung/knockdown,hollowsteel
door
i) Doormaterialcashallowance:$800
d) Installaluminumthresholdwithvinylstrip
e) Installweatherstripping
f) Air-seal gapsbetweenframeandroughopeningwithlow-expansionfoam and/or100%silicone
sealant
g) Finishsealingdoorwith100%siliconesealantforasmoothfinish
PW26-06MetalBuildingRehabforBrookForestEstates
SPECIFICATIONS
Page2of2

It e m N o . D e s c r ip t io n U n it E s t . Q t y . U n it P r ic e E x t e n d e d P r ic e
1 R e p la c e m e n t o f w e s t w a ll, in s u la t io n , a n d b a s e c h a n n e l; in s t a ll o f n e w z -g ir t L S 1 $ $
2 R e p la c e m e n t o f r o o f a n d in s u la t io n ; in s t a ll o f (t w o ) n e w p r o t e c t io n p a n e ls L S 1 $ $
3 In s t a ll o f n e w r o llin g -d o o r fr a m e t r im ; s t r a ig h t e n in g o f e x is t in g d o o r fr a m e s L S 1 $ $
4 R e p la c e m e n t o f t r im o n (t h r e e ) b u ild in g c o r n e r s ; in s t a ll o f n e w t r im o n (o n e ) c o r n e r L S 1 $ $
5 R e a t t a c h e x is t in g e a s t -w a ll in s u la t io n a n d s e a l g a p s L S 1 $ $
6 R e p la c e m e n t o f p e r s o n n e l d o o r L S 1 $ $
T o t a l o f a ll e x t e n d e d p r ic e s f o r E s t im a t e d Q u a n t it ie s o f W o r k $

BID FORM
CLEAR CREEK COUNTY, COLORADO
PW 26-06 METAL BUILDING REHAB FOR BROOK FOREST ESTATES
The terms used in this Bid with initial capital letters have the meanings stated in the Instructions to
Bidders.
ARTICLE1-OWNERANDBIDDER
1.01 This Bid is submitted to: Clear Creek County, Road & Bridge Department, 3549 Stanley Road,
Dumont,CO80436viauploadedpdftotheProspectiveBidder'sSubmittalFolder.
1.02 TheundersignedBidderproposesandagrees,ifthisBidisaccepted,toenterintoaContractwith
Owner in the form included in the Bidding Documents to perform all Work as specified or
indicatedintheBiddingDocumentsforthepricesandwithinthetimesindicatedinthisBidand
inaccordancewiththeothertermsandconditionsoftheBiddingDocuments.
ARTICLE2-ATTACHMENTSTOTHISBID
2.01 ThefollowingdocumentsaresubmittedwithandmadeaconditionofthisBid:
A. RequiredBidderQualificationStatementwithsupportingdata.
B. ListofProposedSubcontractors.
ARTICLE3-BASISOFBID-UNITPRICES
3.01 UnitPriceBids
A. BidderwillperformthefollowingWorkattheindicatedunitprices:
B. Bidderacknowledgesthat:
1. each Bid Unit Price includes an amount considered by Bidder to be adequate to cover
Contractor'soverheadandprofitforeachseparatelyidentifieditem,and
PW26-06MetalBuildingRehabforBrookForestEstates
AdaptedfromEJCDC(R)C-410,BidForm
Page1of3
It e m
N o .
1
2
3
4
5
6
T o t a l
R e p la c e m e n t o f
c h a n n e l; in s t a ll
R e p la c e m e n t o f
n e w p r o t e c t io n
In s t a ll o f n e w r o
o f e x is t in g d o o r
R e p la c e m e n t o f
in s t a ll o f n e w t r
R e a t t a c h e x is t in
R e p la c e m e n t o f
o f a ll e x t e n d e d
D e s c r ip t io n
w e s t w a ll, in s u la t io n , a n d
o f n e w z -g ir t
r o o f a n d in s u la t io n ; in s t a
p a n e ls
llin g -d o o r fr a m e t r im ; s t r
fr a m e s
t r im o n (t h r e e ) b u ild in g c
im o n (o n e ) c o r n e r
g e a s t -w a ll in s u la t io n a n d
p e r s o n n e l d o o r
p r ic e s f o r E s t im a t e d Q u
b a s e
ll o f (t w
a ig h t e n
o r n e r s ;
s e a l g a
a n t it ie
o )
in g
p s
s o f
U
W
n it
L S
L S
L S
L S
L S
L S
o r k
E
Q
s
t
1
1
1
1
1
1
t
y
.
.
$
$
$
$
$
$
U n it P r ic e
$
$
$
$
$
$
$
E x t e n d e d P r ic e

TotalBidPrice $
AddendumNumber AddendumDate

2. estimatedquantitiesarenotguaranteed,andaresolelyforthepurposeofcomparisonof
Bids, and final payment for all Unit Price Work will be based on actual quantities,
determinedasprovidedintheContractDocuments.
3.02 TotalBidPrice
TotalBidPrice $
ARTICLE4-TIMEOFCOMPLETION
4.01 BidderagreesthattheWorkwillbesubstantiallycompleteandwillbecompletedandreadyfor
final payment in accordance with Article 4 of the Contract on or before the dates or within the
numberofcalendardaysindicatedintheContract.
4.02 BidderacceptstheprovisionsoftheContractastoliquidateddamages.
ARTICLE5-BIDDER'S ACKNOWLEDGEMENTS: ACCEPTANCE PERIOD, INSTRUCTIONS, AND RECEIPT OF
ADDENDA
5.01 BidAcceptancePeriod
A. ThisBidwillremainsubjecttoacceptancefor60daysaftertheBidopening,orforsuchlonger
periodoftimethatBiddermayagreetoinwritinguponrequestofOwner.
5.02 ReceiptofAddenda
A. BidderherebyacknowledgesreceiptofthefollowingAddenda:
AddendumNumber AddendumDate
ARTICLE6-BIDDER'SREPRESENTATIONSANDCERTIFICATIONS
6.01 Bidder'sRepresentations
A. InsubmittingthisBid,Bidderrepresentsthefollowing:
1. BidderhasexaminedandcarefullystudiedtheBiddingDocuments,includingAddenda.
2. Bidder has visited the Site, conducted a thorough visual examination of the Site and
adjacent areas, and become familiar with the general, local, and Site conditions that
mayaffectcost,progress,andperformanceoftheWork.
3. Bidder is familiar with all Laws and Regulations that may affect cost, progress, and
performanceoftheWork.
PW26-06MetalBuildingRehabforBrookForestEstates
AdaptedfromEJCDC(R)C-410,BidForm
Page2of3

BIDDER herebysubmitsthis Bidassetforthabove:
Bidder:
(typedorprintednameoforganization)
By:
(individual'ssignature)
Name:
(typedorprinted)
Title:
(typedorprinted)
Date:
(typedorprinted)
IfBidderisacorporation,apartnership,orajointventure,attachevidenceofauthoritytosign.
Attest:
(individual'ssignature)
Name:
(typedorprinted)
Title:
(typedorprinted)
Date:
(typedorprinted)
Addressforgivingnotices:
Bidder'sContact:
Name:
(typedorprinted)
Title:
(typedorprinted)
Phone:
Email:
Address:
Bidder'sContractorLicense No.: (ifapplicable)
PW26-06MetalBuildingRehabforBrookForestEstates
AdaptedfromEJCDC(R)C-410,BidForm
Page3of3

LegalNameofBusiness:
CorporateOffice
Name: Phonenumber:
Title: Emailaddress:
Businessaddressofcorporateoffice:
LocalOffice
Name: Phonenumber:
Title: Emailaddress:
Businessaddressoflocaloffice:
FormofBusiness: SoleProprietorshipPartnershipCorporation
LimitedLiabilityCompanyJointVenturecomprisedofthefollowingcompanies:
1.
2.
3.
ProvideaseparateQualificationStatementforeachJointVenturer.
DateBusinesswasformed: StateinwhichBusinesswasformed:
IsthisBusinessauthorizedtooperateintheProjectlocation? YesNoPending
NameofLicense:
LicensingAgency:

QUALIFICATIONS STATEMENT
CLEAR CREEK COUNTY, COLORADO
PW 26-06 METAL BUILDING REHAB FOR BROOK FOREST ESTATES
ARTICLE1- GENERALINFORMATION
1.01 ProvidecontactinformationfortheBusiness:
LegalNameofBusiness:
CorporateOffice
Name: Phonenumber:
Title: Emailaddress:
Businessaddressofcorporateoffice:
LocalOffice
Name: Phonenumber:
Title: Emailaddress:
Businessaddressoflocaloffice:
1.02 ProvideinformationontheBusiness'sorganizationalstructure:
FormofBusiness: SoleProprietorshipPartnershipCorporation
LimitedLiabilityCompanyJointVenturecomprisedofthefollowingcompanies:
1.
2.
3.
ProvideaseparateQualificationStatementforeachJointVenturer.
DateBusinesswasformed: StateinwhichBusinesswasformed:
IsthisBusinessauthorizedtooperateintheProjectlocation? YesNoPending
ARTICLE2- LICENSING
2.01 ProvideinformationregardinglicensureforBusiness:
NameofLicense:
LicensingAgency:
PW26-06MetalBuildingRehabforBrookForestEstates
QualificationsStatement
Page1of3

LicenseNo: ExpirationDate:
NameofLicense:
LicensingAgency:
LicenseNo: ExpirationDate:

LicenseNo: ExpirationDate:
NameofLicense:
LicensingAgency:
LicenseNo: ExpirationDate:
ARTICLE3- CONSTRUCTIONEXPERIENCE
3.01 Listaminimumofthreeandamaximumofsixprojectscompletedinthelast5yearsinScheduleA
andprovideindicatedinformationtodemonstratetheBusiness'sexperiencewithprojectssimilar
intypeandcostofconstruction.
ARTICLE4- REQUIREDATTACHMENTS
4.01 ProvidethefollowinginformationwiththeStatementofQualifications:
A. ScheduleA(PreviousExperiencewithSimilarProjects)asrequiredbyParagraph3.01.
B. Additionalitemsaspertinent.
PW26-06MetalBuildingRehabforBrookForestEstates
QualificationsStatement
Page2of3

This page summarizes the opportunity, including an overview and a preview of the attached documents.
* Disclaimer: This website provides information about bids, requests for proposals (RFPs), or requests for qualifications (RFQs) for convenience only and does not serve as an official public notice. Individuals who wish to respond to or inquire about bids, RFPs, or RFQs should contact the relevant government department directly.

Sign-up for a Free Trial, Government Bid Alerts

With Free Trial, you can:

You will have a full access to bids, website, and receive daily bid report via email and web.

Try One Week FREE Now

See Also

General Information Document ID DQ1-PMAA-2027000032-1 Status Open Description HPSF, SF2501T11, Government Creek OHV

State Government of Colorado

Bid Due: 8/12/2026

Description: RFQ Governor's Mansion Parking Lot Redevelopment Project Department: DPA - Executive Director

State Government of Colorado

Bid Due: 1/01/2099

Project ID: RFP 126DM011 Title: Dayton Station Painting Project- Phase 2 Addenda: 0

Regional Transportation District - Denver

Bid Due: 8/28/2026

Bid Number: IFB-SN-2026-27 Bid Title: Rollingstone Sewer Main Replacement Category: 2026 Bid's &

Steamboat Springs

Bid Due: 8/17/2026