RFB 2026-07 ? Marina Parking Lot Improvements
| Agency: | City of Isle of Palms |
|---|---|
| State: | South Carolina |
| Type of Government: | State & Local |
| NAICS Category: |
|
| Posted Date: | Sep 23, 2026 |
| Due Date: | Sep 25, 2026 |
| Solicitation No: | RFB 2026-07 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
RFB 2026-07 – Marina Parking Lot Improvements
The City of Isle of Palms is seeking bids from qualified general contractors to redevelop and modify the parking lot and driveways at the Isle of Palms Marina site, 50 41st Avenue. The work includes demolition and asphalt milling, grading and drainage improvements, asphalt pavement and asphalt-millings parking areas, ADA parking and access improvements, concrete work, curbing, gates, fencing, signage, pavement markings, erosion control, and related site improvements shown in the attached plans prepared by Cline Engineering and dated August 24, 2026.
The deadline for questions is 5:00 p.m., Eastern Time, September 18, 2026.
The deadline for submission is 10:00 a.m., Eastern Time, September 25, 2026
Bid documents are available here .
Attachment Preview
| CDM | CDM | CDM | CDM | .VPPA | |||||
|---|---|---|---|---|---|---|---|---|---|
| -- | -- | -- | -- | NWARD | |||||
| LAVORPPA DNA WEIVER ROF DEUSSI | LAVORPPA DNA WEIVER ROF DEUSSI | LAVORPPA DNA WEIVER ROF DEUSSI | LAVORPPA DNA WEIVER ROF DEUSSI | NOITPIRCSED | |||||
| 6202/92/70 | 6202/42/80 | 6202/71/90 | 6202/22/90 | ETAD | |||||
| A | B | C | D | .VER | |||||
| GNITLUSNOC E G N I N R E I E N NGISED L I G C N E LANOISSEFORP | |||||||||
| NALP RETSAM POI | REVOC | ANILORAC EUNEVA HTUOS TS14 ,SMLAP 08 FO ELSI | |||||||
| PROJECT MANAGER | MDC | ||||||||
| DRAWN BY | AJ/JR | ||||||||
| PROJECT DATE | AUGUST 2022 | ||||||||
| JOB NUMBER | 22047 | ||||||||
| SHEET NUMBER | |||||||||
| G-1 |
| SITE CONTACTS | ||
|---|---|---|
| CLIENT | CIVIL ENGINEER MATTHEW CLINE, P.E. CLINE ENGINEERING P.O. BOX 21204 CHARLESTON, SC 29413 PHONE (843) 991-7239 | PROJECT SURVEYOR |
| CITY OF ISLE OF PALMS DOUGLAS KERR PO DRAWER 508 ISLE OF PALMS, SC 29451 PHONE (843) 886-6428 | SOUTH CAROLINA EROSION CONTROL S.C.D.E.S. B.C.M. STORMWATER DIVISION 1362 MCMILLAN AVE. SUITE 400 CHARLESTON, SC 29405 PHONE (843) 953-0200 | SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION DISTRICT 6 6355 FAIN BLVD. NORTH CHARLESTON, SC 29406 PHONE (843) 740-1667 |
| SHEET LIST TABLE | |
|---|---|
| SHEET NUMBER | SHEET TITLE |
| G-1 | COVER |
| G-2 | GENERAL NOTES |
| G-3 | GENERAL NOTES |
| V-1 | SITE CONDITIONS |
| C-1 | SITE PLAN |
| C-2 | DEMOLITION AND SWPPP |
| C-3 | GRADING AND DRAINAGE PLAN |
| C-4 | UTILITY PLAN |
| C-5 | CONSTRUCTION DETAILS |
| C-6 | CONSTRUCTION DETAILS |
| C-7 | CONSTRUCTION DETAILS |
| ADD-1 | UTILITY ADDENDUM 1 |
| ADD-2 | UTILITY ADDENDUM 2 |
| ADD-3 | UTILITY ADDENDUM 3 |
| ADA COMPLIANCE |
|---|
| THE PUBLIC RIGHT-OF-WAY MUST REMAIN ADA COMPLIANT DURING CONSTRUCTION OR AN ALTERNATIVE ROUTE MUST BE PROVIDED. IT IS THE OWNERS RESPONSIBILITY TO REPAIR ALL DAMAGED SIDEWALKS TO REINSTATE AN ADA ACCESSIBLE ROUTE. |
| PROJECT DESCRIPTION |
|---|
| SITE IMPROVEMENTS WILL CONSIST OF THE REDEVELOPMENT OF PARKING LOT AND DRIVEWAYS. |
.GNITIRW
NI
.CNI
,GNIREENIGNE
ENILC
YB
DEZIROHTUA
NAHT
REHTO
YAW
YNA
NI
DECUDORPER
RO
DESU
EB
TON
LLAHS
DNA
.CNI
,GNIREENIGNE
ENILC
FO
YTREPORP
EHT
DNA
ECIVRES
FO
TNEMURTSNI
NA
ERA
SELIF
DAC
DETAICOSSA
DNA
GNIWARD
SIHT
7200.DP\SGNIWARD.NOITCUDORP\X\100\DACA.74022\2202\:X
:NOITACOL
ELIF
MP
64:15:3
6202/22/9
:ETAD
TOLP
E
N
I
L
C
G
N
I
R
E
E
N
I
G
N
E
.VPPA
NWARD
NOITPIRCSED
ETAD
.VER
PROJECT MANAGER
DRAWN BY
PROJECT DATE
JOB NUMBER
SHEET NUMBER
NALP
RETSAM
POI
EUNEVA
TS14
08
GNITLUSNOC
NGISED
LANOISSEFORP
ANILORAC
HTUOS
,SMLAP
FO
ELSI
MDC
AJ/JR
AUGUST 2022
22047
CDM
--
LAVORPPA
DNA
WEIVER
ROF
DEUSSI
6202/92/70
A
CDM
--
LAVORPPA
DNA
WEIVER
ROF
DEUSSI
6202/42/80
B
CDM
--
LAVORPPA
DNA
WEIVER
ROF
DEUSSI
6202/71/90
C
CDM
--
LAVORPPA
DNA
WEIVER
ROF
DEUSSI
6202/22/90
D
G-1
REVOC
site development plans
for
IOP MASTER PLAN
80 41ST AVENUE
ISLE OF PALMS, south carolina
SITE CONTACTS SHEET LIST TABLE
PROJECT
LOCATION
CLIENT CIVIL ENGINEER PROJECT SURVEYOR
SHEET NUMBER SHEET TITLE
MATTHEW CLINE, P.E.
CLINE ENGINEERING G-1 COVER
P.O. BOX 21204 G-2 GENERAL NOTES
CHARLESTON, SC 29413
G-3 GENERAL NOTES
PHONE (843) 991-7239
V-1 SITE CONDITIONS
CITY OF ISLE OF PALMS SOUTH CAROLINA EROSION CONTROL SOUTH CAROLINA DEPARTMENT OF
C-1 SITE PLAN
DOUGLAS KERR S.C.D.E.S. B.C.M. TRANSPORTATION DISTRICT 6
PO DRAWER 508 STORMWATER DIVISION 6355 FAIN BLVD. C-2 DEMOLITION AND SWPPP
ISLE OF PALMS, SC 29451 1362 MCMILLAN AVE. SUITE 400 NORTH CHARLESTON, SC 29406 C-3 GRADING AND DRAINAGE PLAN
PHONE (843) 886-6428 CHARLESTON, SC 29405 PHONE (843) 740-1667
C-4 UTILITY PLAN
PHONE (843) 953-0200
C-5 CONSTRUCTION DETAILS
C-6 CONSTRUCTION DETAILS
C-7 CONSTRUCTION DETAILS
ADD-1 UTILITY ADDENDUM 1
ADD-2 UTILITY ADDENDUM 2
ADD-3 UTILITY ADDENDUM 3
ADA COMPLIANCE PROJECT DESCRIPTION
THE PUBLIC RIGHT-OF-WAY MUST REMAIN ADA COMPLIANT DURING SITE IMPROVEMENTS WILL CONSIST OF THE REDEVELOPMENT OF
CONSTRUCTION OR AN ALTERNATIVE ROUTE MUST BE PROVIDED. IT PARKING LOT AND DRIVEWAYS.
IS THE OWNERS RESPONSIBILITY TO REPAIR ALL DAMAGED
SIDEWALKS TO REINSTATE AN ADA ACCESSIBLE ROUTE.
VICINITY MAP
SCALE 1" = 1000'
| CDM | CDM | CDM | CDM | .VPPA | |||||
|---|---|---|---|---|---|---|---|---|---|
| -- | -- | -- | -- | NWARD | |||||
| LAVORPPA DNA WEIVER ROF DEUSSI | LAVORPPA DNA WEIVER ROF DEUSSI | LAVORPPA DNA WEIVER ROF DEUSSI | LAVORPPA DNA WEIVER ROF DEUSSI | NOITPIRCSED | |||||
| 6202/92/70 | 6202/42/80 | 6202/71/90 | 6202/22/90 | ETAD | |||||
| A | B | C | D | .VER | |||||
| GNITLUSNOC E G N I N R E I E N NGISED L I G C N E LANOISSEFORP | |||||||||
| NALP RETSAM POI | SETON LARENEG | ANILORAC EUNEVA HTUOS TS14 ,SMLAP 08 FO ELSI | |||||||
| PROJECT MANAGER | MDC | ||||||||
| DRAWN BY | AJ/JR | ||||||||
| PROJECT DATE | AUGUST 2022 | ||||||||
| JOB NUMBER | 22047 | ||||||||
| SHEET NUMBER | |||||||||
| G-2 |
| PERMANENT SEEDING - COASTAL | ||
|---|---|---|
| SPECIES | RATES PER ACRE | PLANTING DATES |
| SANDY, DROUGHTY SITES | ||
| BROWNTOP MILLET BAHIAGRASS | 10 LBS. 40 LBS. | MAR. 10 - SEPT. 1 |
| BROWNTOP MILLET BAHIAGRASS SERICEA LESPEDEZA | 10 LBS. 30 LBS. 40 LBS. | MAR. 10 - SEPT. 1 |
| BROWNTOP MILLET ATLANTIC COASTAL PANICGRASS | 10 LBS. 15 LBS. PLS | MAR. 10 - JUN. 25 |
| BROWNTOP MILLET SWITCHGRASS (ALAMO) LITTLE BLUESTEM SERICEA LESPEDEZA | 10 LBS. 8 LBS. PLS 4 LBS. 20 LBS. | MAR. 10 - JUN. 25 |
| BROWNTOP MILLET WEEPING LOVEGRASS | 10 LBS. 8 LBS. | MAR. 10 - JUN. 25 |
| WELL DRAINED, CLAYEY/LOAMEY SITES | ||
| BROWNTOP MILLET BAHIAGRASS | 10 LBS. 40 LBS. | MAR. 15 - SEPT. 1 |
| RYE, GRAIN BAHIAGRASS CLOVER, CRIMSON (ANNUAL) | 10 LBS. 40 LBS. 5 LBS. | SEPT. 1 - NOV. 10 |
| BROWNTOP MILLET BAHIAGRASS SERICEA LESPEDEZA | 10 LBS. 30 LBS. 40 LBS. | MAR. 15 - SEPT. 1 |
| BROWNTOP MILLET BERMUDA, COMMON SERICEA LESPEDEZA | 10 LBS. 10 LBS. 40 LBS. | MAR. 15 - SEPT. 1 |
| BROWNTOP MILLET BERMUDA, COMMON KOBE LESPEDEZA (ANNUAL) | 10 LBS. 12 LBS. 10 LBS. | MAR. 15 - SEPT. 1 |
| BROWNTOP MILLET BAHIAGRASS BERMUDA, COMMON SERICEA LESPEDEZA | 10 LBS. 20 LBS. 6 LBS. 40 LBS. | MAR. 15 - SEPT. 1 |
| BROWNTOP MILLET SWITCHGRASS LITTLE BLUESTEM INDIANGRASS | 10 LBS. 8 LBS. PLS 3 LBS. PLS 3 LBS. PLS | MAR. 15 - SEPT. 1 |
| TEMPORARY SEEDING - COASTAL | ||
|---|---|---|
| SPECIES | RATES PER ACRE | PLANTING DATES |
| SANDY, DROUGHTY SITES | ||
| BROWNTOP MILLET | 40 LBS. | MAR. 10 - SEPT. 1 |
| RYE, GRAIN | 56 LBS. | SEPT. 1 - MAR. 15 |
| RYEGRASS | 50 LBS. | SEPT. 1 - APR. 15 |
| WELL DRAINED, CLAYEY/LOAMEY SITES | ||
| BROWNTOP MILLET OR JAPANESE MILLET | 40 LBS. | MAR. 15 - SEPT. 1 |
| RYE, GRAIN OR OATS | 56 LBS. 75 LBS. | SEPT. 1 - MAR. 15 |
| RYEGRASS | 50 LBS. | SEPT. 1 - APR. 15 |
.GNITIRW
NI
.CNI
,GNIREENIGNE
ENILC
YB
DEZIROHTUA
NAHT
REHTO
YAW
YNA
NI DECUDORPER
RO
DESU
EB
TON
LLAHS
DNA
.CNI
,GNIREENIGNE
ENILC
FO
YTREPORP
EHT
DNA
ECIVRES
FO
TNEMURTSNI
NA
ERA
SELIF
DAC
DETAICOSSA
DNA
GNIWARD
SIHT
8200.DP\SGNIWARD.NOITCUDORP\X\100\DACA.74022\2202\:X
:NOITACOL
ELIF
MP
45:15:3
6202/22/9
:ETAD
TOLP
E
N
I
L
C
G
N
I
R
E
E
N
I
G
N
E
.VPPA
NWARD
NOITPIRCSED
ETAD
.VER
PROJECT MANAGER
DRAWN BY
PROJECT DATE
JOB NUMBER
SHEET NUMBER
NALP
RETSAM
POI
EUNEVA
TS14
08
GNITLUSNOC
NGISED
LANOISSEFORP
ANILORAC
HTUOS
,SMLAP
FO
ELSI
MDC
AJ/JR
AUGUST 2022
22047
CDM
--
LAVORPPA
DNA
WEIVER
ROF
DEUSSI
6202/92/70
A
CDM
--
LAVORPPA
DNA
WEIVER
ROF
DEUSSI
6202/42/80
B
CDM
--
LAVORPPA
DNA
WEIVER
ROF
DEUSSI
6202/71/90
C
CDM
--
LAVORPPA
DNA
WEIVER
ROF
DEUSSI
6202/22/90
D
G-2
SETON
LARENEG
SITEWORK 49. THE CONTRACTOR SHALL PROVIDE A TRAFFIC CONTROL PLAN FOR ALL LANE AND SHOULDER CLOSURES WILL NEED TO BE SUBMITTED FOR ALL WORK WITHIN PERMANENT SEEDING
THE R/W PRIOR TO CONSTRUCTION. NIGHT WORK COULD BE REQUIRED FOR ANY AND ALL LANE CLOSURES.
1. TOPOGRAPHIC AND BOUNDARY SURVEY BY OTHERS AND PROVIDED TO CLINE ENGINEERING BY CLIENT. DESCRIPTION
50. THE OWNER SHALL BE RESPONSIBLE FOR THE MAINTENANCE OF DRIVEWAYS AND OTHER ACCESS POINTS, INCLUDING ANY NEW DRAINAGE STRUCTURES, 2. THE CONTRACTOR SHALL VERIFY THE LOCATION AND INVERT ELEVATION OF ALL UNDERGROUND UTILITIES, AND VERIFY PROPERTY CORNERS AND FOR AREAS WITHIN THE RIGHTS-OF-WAYS OF STATE MAINTAINED FACILITIES IN PERPETUITY. CONTROLLING RUNOFF AND PREVENTING EROSION BY ESTABLISHING A PERENNIAL VEGETATIVE COVER WITH SEED.
TOPOGRAPHY BEFORE ANY CONSTRUCTION IS BEGUN. CALL UTILITY COMPANIES BEFORE EXCAVATION TO LOCATE ALL BURIED CABLES AND UNDERGROUND
UTILITIES. PRIOR TO INSTALLATION OF STORM OR SANITARY SEWER, THE CONTRACTOR SHALL VERIFY THE INVERTS OF EXISTING STRUCTURES AND INFORM 51. THE CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING ANY EXISTING UTILITIES NECESSARY FOR SITE CONSTRUCTION INCLUDING ALL PERMITS AND WHEN AND WHERE TO USE IT
THE OWNER AND THE ENGINEER OF ANY CONFLICTS PRIOR TO CONSTRUCTION. FEES. A MAJOR CONSIDERATION IN THE SELECTION OF THE TYPE OF PERMANENT GRASS TO ESTABLISH IS THE INTENDED USE OF THE LAND. LAND USE IS SEPARATED IN
3. THE CONTRACTOR SHOULD NOTIFY THE ENGINEERS FOR A REVIEW SHOULD DISCREPANCIES BE DISCOVERED AT THE SITE OR ON THE DRAWINGS BEFORE 52. THE CONTRACTOR SHALL VERIFY BENCH MARK LOCATION AND ELEVATION WITH SURVEYOR BEFORE BEGINNING CONSTRUCTION. TO TWO CATEGORIES, HIGH-MAINTENANCE AND LOW-MAINTENANCE.
AND DURING CONSTRUCTION. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO COORDINATE BETWEEN ALL CIVIL DRAWINGS WITH GRADING AND UTILITY * HIGH-MAINTENANCE: HIGH MAINTENANCE AREAS ARE MOWED FREQUENTLY, LIME OR FERTILIZED ON A REGULAR BASIS, AND REQUIRE MAINTENANCE TO AN CONTRACTORS IN ORDER TO AVOID PROBLEMS DURING CONSTRUCTION. 53. THE CONTRACTOR SHALL VERIFY THE LOCATIONS OF ALL EASEMENTS ON THE SITE BEFORE PROCEEDING WITH CONSTRUCTION. AESTHETIC STANDARD. LAND USES WITH HIGH MAINTENANCE GRASSES INCLUDE HOMES, INDUSTRIAL PARKS, SCHOOLS, CHURCHES, AND RECREATIONAL
54. ALL PARKING LOT STRIPING IS TO BE PER SOUTH CAROLINA D.O.T. SPECIFICATIONS AND HAVE TWO (2) COATS OF PAINT. THE CONTRACTOR IS RESPONSIBLE AREAS SUCH AS PARKS, ATHLETIC FIELDS, AND GOLF COURSES.
4. CONTRACTOR TO SCHEDULE A PRECONSTRUCTION MEETING WITH ALL UTILITY COMPANIES PRIOR TO CONSTRUCTION. CONTRACTOR SHALL NOTIFY THE
ENGINEER AND UTILITY COMPANIES DURING CONSTRUCTION OF WATER AND SEWER SO PERIODIC OBSERVATIONS CAN BE MADE. CONTRACTOR WILL FOR PROVIDING FIRE LANE STRIPING AND SIGNAGE TO MEET LOCAL REQUIREMENTS. THE BASES OF ALL LIGHT POLES, ALL SPEED BUMPS, ALL BOLLARDS, * LOW-MAINTENANCE: LOW MAINTENANCE AREAS ARE MOWED INFREQUENTLY, IF AT ALL, AND LIME AND FERTILIZER MAY NOT BE APPLIED ON A REGULAR
CERTIFY TO THE ENGINEER IN WRITING THAT WATER AND SEWER LINES HAVE BEEN TESTED AND CONSTRUCTED ACCORDING TO THE ENGINEER'S AND AND ALL FACES OF SIDEWALK THAT ARE NOT FLUSH WITH ASPHALT ARE TO BE PAINTED TRAFFIC YELLOW. SCHEDULE. THESE AREAS ARE NOT SUBJECT TO INTENSE USE AND DO NOT REQUIRE A UNIFORM APPEARANCE. THE VEGETATION MUST BE ABLE TO SURVIVE
UTILITY COMPANY'S DRAWINGS AND SPECIFICATIONS. 55. IN THE CASE OF A CONFLICT IN SPECIFICATIONS, NOTES, OR DETAILS, THE STRICTER SHALL GOVERN. WITH LITTLE MAINTENANCE OVER LONG PERIODS OF TIME. GRASS AND LEGUME MIXTURES ARE FAVORED IN THESE AREAS BECAUSE LEGUMES ARE CAPABLE
OF FIXING NITROGEN IN THE SOIL FOR THEIR OWN USE AND THE USE OF THE GRASSES AROUND THEM. LAND USES REQUIRING LOW-MAINTENANCE GRASSES
5. EXISTING DRAINAGE STRUCTURES TO BE INSPECTED AND REPAIRED AS NEEDED AND EXISTING PIPES TO BE CLEANED OUT TO REMOVE ALL SILT AND DEBRIS. DEMOLITION NOTES INCLUDE STEEP SLOPES, STREAM AND CHANNEL BANKS, ROAD BANKS, AND COMMERCIAL AND INDUSTRIAL AREAS WITH LIMITED ACCESS.
6. ALL REFERENCE TO SPECIFICATIONS FOR HIGHWAY CONSTRUCTION OR MATERIALS ARE MADE FROM SOUTH CAROLINA STATE HIGHWAY DEPARTMENT'S 1. DEMOLITION INCLUDES THE REMOVAL AND DISPOSAL OF DEMOLISHED MATERIALS, AS SHOWN ON THE DRAWINGS AND HEREIN SPECIFIED.
STANDARD SPECIFICATION, LATEST EDITION. SEED SELECTION
2. CONDITIONS EXISTING AT THE TIME OF INSPECTION FOR BIDDING PURPOSES WILL BE MAINTAINED BY THE OWNER IN SO FAR AS PRACTICABLE, HOWEVER, 7. ALL DIMENSIONS SHOWN ARE MEASURED FROM OUTSIDE FACE OF BUILDING WALL AND TO FACE OF CURB LINE. MIDDLE LINE IS THE FACE OF CURB. THE USE OF NATIVE SPECIES IS PREFERRED WHEN SELECTING VEGETATION. BASE PLANT SEED SELECTION ON GEOGRAPHICAL LOCATION, THE TYPE OF SOIL, THE
VARIATIONS MAY OCCUR.
SEASON OF THE YEAR IN WHICH THE PLANTING IS TO BE DONE, AND THE NEEDS AND DESIRES OF THE PERMANENT LAND USER. FAILURE TO CAREFULLY FOLLOW
8. EARTHWORK SHALL BE TO THE LINES AND GRADES SHOWN. PROOF ROLLING AND COMPACTION TEST SHALL BE ACCOMPLISHED IN THE FIELD TO TEST ALL 3. STORAGE OR SALE OF DEMOLISHED MATERIAL ON THE SITE WILL NOT BE PERMITTED. AGRONOMIC RECOMMENDATIONS RESULTS IN AN INADEQUATE STAND OF PERMANENT VEGETATION THAT PROVIDES LITTLE OR NO EROSION CONTROL.
AREAS. THE OWNER SHALL RETAIN THE SERVICES OF A TESTING COMPANY TO TEST ALL AREAS. MASS AREAS OF FILL SHALL BE PLACED IN LOOSELY
MEASURED LIFTS NOT EXCEEDING 8" THICKNESS. ISOLATED AREAS OF FILL (SUCH AS TRENCH BACKFILL) SHALL BE PLACED IN LIFTS NOT EXCEEDING 6" 4. THE USE OF EXPLOSIVES WILL BE PERMITTED ONLY WHEN AUTHORIZED BY THE CONSTRUCTION PROJECT MANAGER.
INSTALLATION
THICKNESS.
5. CONDUCT DEMOLITION OPERATIONS AND THE REMOVAL OF DEBRIS TO ENSURE MINIMUM INTERFERENCE WITH ROADS, STREETS, WALKS, AND OTHER * TOPSOIL: APPLY TOPSOIL IF THE SURFACE SOIL OF THE SEEDBED IS NOT ADEQUATE FOR PLANT GROWTH.
9. CONTRACTOR SHALL PROTECT ALL TREES THAT ARE TO REMAIN AS MARKED IN THE FIELD BY OWNER'S REPRESENTATIVE. ADJACENT OCCUPIED OR USED FACILITIES OR ADJACENT CONSTRUCTION PROCESSES.
* TILLAGE: IF THE AREA HAS BEEN RECENTLY PLOWED, NO TILLAGE IS REQUIRED OTHER THAN RAKING OR SURFACE ROUGHENING TO BREAK ANY CRUST THAT
10. THE GRADING CONTRACTOR SHALL PROOF-ROLL THE CONSTRUCTION AREA WITH A FULLY-LOADED TANDEM-AXLE DUMP TRUCK, OR APPROVED EQUAL, BY 6. DO NOT CLOSE OR OBSTRUCT STREETS, WALKS OR OTHER OCCUPIED OR USED FACILITIES WITHOUT PERMISSION FROM THE CONSTRUCTION PROJECT HAS FORMED LEAVING A TEXTURED SURFACE. DISK THE SOIL FOR OPTIMAL GERMINATION WHEN THE SOIL IS COMPACTED LESS THAN 6-INCHES. IF THE SOIL
MAKING 2 COMPLETE PASSES IN EACH OF 2 PERPENDICULAR DIRECTIONS. ALL SOFT SPOTS SHALL BE UNDERCUT AND RE-COMPACTED WITH SUITABLE MANAGER AND THE AUTHORITIES HAVING JURISDICTION. PROVIDE ALTERNATE ROUTES AROUND CLOSED OR OBSTRUCTED TRAFFIC WAYS IF REQUIRED BY IS COMPACTED MORE THAN 6-INCHES, SUB-SOILED AND DISK THE AREA.
STRUCTURAL FILL MATERIAL. MINIMUM AXLE WEIGHT = 10 TONS. GOVERNING REGULATIONS. * SOIL TESTING: SOIL TESTING IS AVAILABLE THROUGH CLEMSON UNIVERSITY COOPERATIVE EXTENSION SERVICE.
11. THE CONTRACTOR SHALL BE SOLELY AND COMPLETELY RESPONSIBLE FOR CONDITIONS OF THE JOB SITE, INCLUDING SAFETY OF ALL PERSONS AND 7. ENSURE THE SAFE PASSAGE OF PERSONS AROUND THE AREA OF DEMOLITION. CONDUCT OPERATIONS TO PREVENT INJURY TO ADJACENT BUILDINGS,
PROPERTY DURING PERFORMANCE OF THE WORK. THIS REQUIREMENT WILL APPLY CONTINUOUSLY AND WILL NOT BE LIMITED TO NORMAL WORKING HOURS. STRUCTURES, OTHER FACILITIES, AND PERSONS. * LIME: UNLESS A SPECIFIC SOIL TEST INDICATES OTHERWISE, APPLY 112 TONS OF GROUND COURSE TEXTURED AGRICULTURAL LIMESTONE PER ACRE (70
POUNDS PER 1000 SQUARE FEET).
THE DUTY OF THE ENGINEER TO CONDUCT CONSTRUCTION REVIEW OF THE CONTRACTOR'S PERFORMANCE IS NOT INTENDED TO INCLUDE REVIEW OF THE
8. PROMPTLY REPAIR DAMAGES CAUSED TO ADJACENT FACILITIES BY DEMOLITION OPERATIONS AT NO COST TO THE OWNER.
ADEQUACY OF THE CONTRACTOR'S SAFETY MEASURES, IN, ON, OR NEAR THE CONSTRUCTION SITE. THE CONTRACTOR WILL BE RESPONSIBLE FOR * FERTILIZER: APPLY A MINIMUM OF 1000 POUNDS PER ACRE OF A COMPLETE 10-10-10 FERTILIZER (23 POUNDS PER 1000 SQUARE FEET) OR EQUIVALENT
PROVIDING AND MAINTAINING ALL BARRICADES, WARNING SIGNS, FLASHING LIGHTS, AND TRAFFIC CONTROL DEVICES DURING CONSTRUCTION. THE 9. MAINTAIN EXISTING UTILITIES, INDICATED TO REMAIN, KEEP IN SERVICE, AND PROTECT AGAINST DAMAGE DURING DEMOLITION OPERATIONS. CONTRACTOR DURING PERMANENT SEEDING OF GRASSES UNLESS A SOIL TEST INDICATES A DIFFERENT REQUIREMENT. INCORPORATE FERTILIZER AND LIME (IF USED) INTO
CONTRACTOR IS TO COMPLY WITH ALL OSHA REGULATIONS, REQUIREMENTS, AND SAFETY MEETING REQUIREMENTS. SHALL FIELD LOCATE AND VERIFY ALL UTILITIES ON SITE. THE TOP 4-6 INCHES OF THE SOIL BY DISKING OR OTHER MEANS WHERE CONDITIONS ALLOW. DO NOT MIX THE LIME AND THE FERTILIZER PRIOR TO THE FIELD
APPLICATION.
12. ALL NEW ELEVATIONS SHOWN ARE FINISH GRADE ELEVATION. THE GRADING CONTRACTOR SHALL DEDUCT THE FOLLOWING FOR SUBGRADE ELEVATION: 10. DO NOT INTERRUPT EXISTING UTILITIES SERVING OCCUPIED OR USED FACILITIES, EXCEPT WHEN AUTHORIZED IN WRITING FROM THE CONSTRUCTION
PROJECT MANAGER AND THE AUTHORITIES HAVING JURISDICTION. PROVIDE TEMPORARY SERVICES DURING INTERRUPTIONS TO EXISTING UTILITIES, AS * SEEDING: LOOSEN THE SURFACE OF THE SOIL JUST BEFORE BROADCASTING THE SEED. EVENLY APPLY SEED BY THE MOST CONVENIENT METHOD AVAILABLE
* BUILDING FLOOR - SEE ARCHITECTURAL PLANS
ACCEPTABLE TO THE GOVERNING AUTHORITIES. NOTIFY ALL BUSINESSES IMPACTED IN ADVANCE OF ALL SCHEDULED UTILITY INTERRUPTIONS. FOR THE TYPE OF SEED APPLIED AND THE LOCATION OF THE SEEDING. TYPICAL APPLICATION METHODS INCLUDE BUT ARE NOT LIMITED TO CYCLONE
* HEAVY DUTY PAVEMENT - 11" SEEDERS, ROTARY SPREADERS, DROP SPREADERS, BROADCAST SPREADERS, HAND SPREADERS, CULTIPACKER SEEDER, AND HYDRO-SEEDERS. COVER
11. COMPLY WITH GOVERNING REGULATIONS PERTAINING TO ENVIRONMENTAL PROTECTION.
APPLIED SEED BY RAKING OR DRAGGING A CHAIN OR BRUSH MAT, AND THEN LIGHTLY FIRM THE AREA WITH A ROLLER OR CULTIPACKER. DO NOT ROLL SEED
* LIGHT DUTY PAVEMENT - 8" 12. DEMOLISH CONCRETE AND MASONRY IN SMALL SECTIONS. THAT IS APPLIED WITH A HYDRO-SEEDER AND HYDRO-MULCH.
* PCC PAVEMENT - 12"
13. COMPLETELY FILL BELOW-GRADE AREAS AND VOIDS RESULTING FROM THE DEMOLITION OF STRUCTURES BELOW GRADE. * MULCHING: COVER ALL PERMANENT SEEDED AREAS WITH MULCH IMMEDIATELY UPON COMPLETION OF THE SEEDING APPLICATION TO RETAIN SOIL MOISTURE
* SIDEWALKS - 4" AND REDUCE EROSION DURING ESTABLISHMENT OF VEGETATION. APPLY THE MULCH EVENLY IN SUCH A MANNER THAT IT PROVIDES A MINIMUM OF 75% 14. PLACE FILL MATERIALS IN HORIZONTAL LAYERS NOT EXCEEDING 6" IN LOOSE DEPTH. COMPACT EACH LAYER AT OPTIMUM MOISTURE CONTENT OF THE FILL
COVERAGE. TYPICAL MULCH APPLICATIONS INCLUDE STRAW, WOOD FIBER, HYDROMULCHES, BFM AND FGM. USE HYDROMULCHES WITH A MINIMUM BLEND OF
* TURF AREAS - 4" MATERIAL TO A DENSITY EQUAL TO THE ORIGINAL ADJACENT GROUND, UNLESS SUBSEQUENT EXCAVATION FOR NEW WORK IS REQUIRED. AFTER FILL 70% WOOD FIBERS. THE MOST COMMONLY ACCEPTED MULCH USED IN CONJUNCTION WITH PERMANENT SEEDING IS SMALL GRAIN STRAW. SELECT STRAW
PLACEMENT AND COMPACTION, GRADE THE SURFACE TO MEET ADJACENT CONTOURS AND TO PROVIDE FLOW TO SURFACE DRAINAGE STRUCTURES.
THAT IS DRY AND FREE FROM MOLD DAMAGE AND NOXIOUS WEEDS. THE STRAW MAY NEED TO BE ANCHORED WITH NETTING OR ASPHALT EMULSIONS TO
13. THE CONTRACTOR SHALL REMOVE ALL TREES AND VEGETATION THAT ARE WITHIN 5 FEET OF NEW CONSTRUCTION. REMOVE DEBRIS FROM SITE OR BURN IN
ACCORDANCE WITH LOCAL LAWS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING NECESSARY BURNING PERMITS. PROTECT ALL TREES THAT 15. REMOVE FROM THE SITE DEBRIS, RUBBISH, AND OTHER MATERIALS RESULTING FROM DEMOLITION OPERATIONS, OR AS DIRECTED BY THE CONSTRUCTION PREVENT IT FROM BEING BLOWN OR WASHED AWAY. APPLY STRAW MULCH BY HAND OR MACHINE AT THE RATE 2 TONS PER ACRE (90 POUNDS PER 1000
ARE TO REMAIN. PROJECT MANAGER AND LEGALLY DISPOSE OF DEBRIS "OFF-SITE". SQUARE FEET). FREQUENT INSPECTIONS ARE NECESSARY TO CHECK THAT CONDITIONS FOR GROWTH ARE GOOD.
14. TOPSOIL SHALL BE STRIPPED TO A DEPTH AS REQUIRED BY OWNER OR GEOTECH AND STOCKPILED AS DIRECTED BY THE OWNER'S REPRESENTATIVE. 16. ALL PIPING, FENCING AND OTHER MATERIALS THAT INTERFERE WITH NEW CONSTRUCTION SHALL BE REMOVED OR ABANDONED AS DIRECTED BY THE * IRRIGATION: KEEP PERMANENT SEEDED AREAS ADEQUATELY MOIST, ESPECIALLY LATE IN THE SPECIFIC GROWING SEASON. IRRIGATE THE SEEDED AREA IF
CONSTRUCTION PROJECT MANAGER. NORMAL RAINFALL IS NOT ADEQUATE FOR THE GERMINATION AND GROWTH OF SEEDLINGS. WATER SEEDED AREAS AT CONTROLLED RATES THAT ARE LESS
15. THE TOP 18" OF FILL SHALL BE COMPACTED TO 98% OF MAXIMUM DRY DENSITY BY THE STANDARD PROCTOR METHOD ASTM D-698. ALL OTHER FILL SHALL BE THAN THE RATE AT WHICH THE SOIL CAN ABSORB WATER TO PREVENT RUNOFF. RUNOFF OF IRRIGATION WATER WASTES WATER AND CAN CAUSE EROSION.
COMPACTED TO 95% MAXIMUM DRY DENSITY. MOISTURE SHALL BE CONTROLLED TO WITHIN 2% OF OPTIMUM. 17. ALL SALVAGEABLE MATERIALS WILL REMAIN THE PROPERTY OF THE OWNER. THE CONTRACTOR SHALL REMOVE AND STORE THIS MATERIAL AS DIRECTED BY
THE CONSTRUCTION PROJECT MANAGER. * RE-SEEDING: INSPECT PERMANENTLY SEEDED AREAS FOR FAILURE, MAKE NECESSARY REPAIRS AND RE-SEED OR OVERSEED WITHIN THE SAME GROWING
16. ALL EXCAVATION SHALL BE "CLASSIFIED EXCAVATION". EXCAVATION SHALL BE "CLASSIFIED" AS "COMMON EXCAVATION" OR "ROCK EXCAVATION". ROCK SEASON IF POSSIBLE. IF THE GRASS COVER IS SPARSE OR PATCHY, RE-EVALUATE THE CHOICE OF GRASS AND QUANTITIES OF LIME AND FERTILIZER APPLIED.
EXCAVATION SHALL BE CLASSIFIED AS FOLLOWS: 18. TRANSPORT MATERIALS REMOVED FROM DEMOLISHED STRUCTURES AND DISPOSE OF "OFF" SITE AS REQUIRED. DEBRIS SHALL NOT BE "BURIED" OR LEFT ON FINAL STABILIZATION BY PERMANENT SEEDING OF THE SITE REQUIRES THAT IT BE COVERED BY A 70% COVERAGE RATE.
SITE EXCEPT AS ALLOWED BY ALL APPLICABLE LAWS AND BY THE GEOTECHNICAL ENGINEER.
* MASSIVE ROCK EXCAVATION - ANY MATERIAL WHICH CANNOT BE EXCAVATED WITH A SINGLE TOOTH RIPPER DRAWN BY A CRAWLER TRACTOR HAVING A
MINIMUM DRAW BAR RATED AT NOT LESS THAN 53,000 POUNDS (CATERPILLAR D-8 OR EQUIVALENT) AND OCCUPYING AN ORIGINAL VOLUME OF AT LEAST ONE 19. THE CONTRACTOR IS TO MAINTAIN MINIMUM COVER OVER ALL UTILITY LINES THROUGHOUT CONSTRUCTION. THE CONTRACTOR IS RESPONSIBLE FOR INSPECTION AND MAINTENANCE FOR PERMANENT SEEDING
CUBIC YARD OR MORE. REPAIRING ANY DAMAGE TO UTILITY LINES AT NO ADDITIONAL COST TO THE OWNER. * INSPECT SEEDED AREAS FOR FAILURE AND MAKE NECESSARY REPAIRS AND RE-SEED IMMEDIATELY. CONDUCT A FOLLOW-UP SURVEY AFTER ONE YEAR AND
* TRENCH EXCAVATION - ANY MATERIAL WHICH CANNOT BE EXCAVATED WITH A POWER SHOVEL HAVING THE CAPACITY OF AT LEAST THAT OF A CATERPILLAR 20. THE CONTRACTOR IS RESPONSIBLE FOR REPAIRING ANY DAMAGE TO THE SITE OR TO THE BUILDING AND IMPROVEMENTS ON THE SITE THAT OCCUR DURING REPLACE FAILED PLANTS WHERE NECESSARY.
225 AND OCCUPYING AN ORIGINAL VOLUME OF AT LEAST 1/2 CUBIC YARD OR MORE. CONSTRUCTION AT NO ADDITIONAL COST TO THE OWNER.
* IF VEGETATIVE COVER IS INADEQUATE TO PREVENT RILL EROSION, OVERSEED AND FERTILIZE IN ACCORDANCE WITH SOIL TEST RESULTS.
COMMON EXCAVATION SHALL INCLUDE ALL MATERIALS THAT CAN BE RIPPED, BOULDERS, AND ALL OTHER MATERIALS THAT DO NOT FALL IN THE CATEGORY 21. THE CONTRACTOR MUST VISIT SITE PRIOR TO SUBMITTING BID AND INCLUDE IN HIS PRICE ALL DEMOLITION AND DISPOSAL COSTS TO REMOVE/RELOCATE ANY
* IF A STAND OF PERMANENT VEGETATION HAS LESS THAN 40 PERCENT COVER, RE-EVALUATE CHOICE OF PLANT MATERIALS AND QUANTITIES OF LIME AND
OF ROCK EXCAVATION AS DEFINED ABOVE. AND ALL ITEMS THAT MAY INTERFERE WITH NEW CONSTRUCTION.
FERTILIZER.
17. THE CLASSIFICATION OF SOILS INCLUDE: TOPSOIL, FILL MATERIAL, UNSUITABLE MATERIAL, AND ROCK EXCAVATION. THE CLASSIFICATION OF SOILS IS THE 22. THE CONTRACTOR SHALL CONTACT ALL UTILITY COMPANIES AND COORDINATE THE DEMOLITION, REMOVAL, RELOCATION, ABANDONMENT, ETC. OF ALL
* RE-ESTABLISH THE STAND FOLLOWING SEED BED PREPARATION AND SEEDING RECOMMENDATIONS, OMITTING LIME AND FERTILIZER IN THE ABSENCE OF
RESPONSIBILITY OF THE OWNER'S SOIL TESTING FIRM. UTILITIES THAT INTERFERE WITH NEW CONSTRUCTION. ANY DEMOLITION AND RELOCATION SHOWN IS SCHEMATIC ONLY. THE CONTRACTOR IS RESPONSIBLE SOIL TEST RESULTS.
FOR COORDINATING THE DESIGN, CONSTRUCTION, AND EASEMENTS OF ALL UTILITY WORK WITH THE APPROPRIATE UTILITIES.
18. ALL FILL MATERIAL SHALL CONSIST OF AN APPROVED MATERIAL AND BE FREE OF ORGANIC MATTER AND DEBRIS. IMPORTED FILL SHALL HAVE A MINIMUM
* IF THE SEASON PREVENTS RE-SOWING, MULCH IS AN EFFECTIVE TEMPORARY COVER.
STANDARD PROCTOR MAXIMUM DRY DENSITY OF 95 PCF, CLAY/SILT FINES CONTENT NOT GREATER THAN 25%, AND A PLASTICITY INDEX LESS THAN 15%. 23. DEMOLISH ALL EXISTING UTILITIES THAT LIE UNDER AND 10' OUTSIDE OF NEW BUILDING. THE EXISTING UTILITIES 10' OR MORE OUTSIDE NEW BUILDINGS MAY
BE DRAINED AND FILLED WITH FLOWABLE FILL IF TESTING COMPANY APPROVES EXISTING BACKFILL. * FINAL STABILIZATION OF THE SITE REQUIRES A 70 PERCENT OVERALL COVERAGE RATE. THIS DOES NOT MEAN THAT 30 PERCENT OF THE SITE CAN REMAIN
19. ALL EXISTING SLOPES STEEPER THAN 4:1 THAT WILL RECEIVE FILL SHALL BE PLOWED AND SCARIFIED SO NEW FILL WILL BOND WITH EXISTING SURFACE.
BARE. THE COVERAGE IS DEFINED AS LOOKING AT A SQUARE YARD OF COVERAGE, IN WHICH 70 PERCENT OF THAT SQUARE YARD IS COVERED WITH TEMPORARY SEEDING
20. CONTRACTOR SHALL SCARIFY ALL EXISTING ASPHALT PAVEMENT BEFORE PLACING FILL, UNLESS OVERLAYING ASPHALT ONTO EXISTING ASPHALT. VEGETATION.
21. THE GRADING CONTRACTOR SHALL CONFORM TO ELEVATIONS AND DIMENSIONS SHOWN WITHIN A TOLERANCE OF PLUS OR MINUS 0.05 FEET. (FINAL GRADED DESCRIPTION
SURFACE UNDER BUILDING SLABS SHALL BE WITHIN A TOLERANCE OF 3/8" WHEN MEASURED WITH A 10' STRAIGHT EDGE). (FINAL PAVEMENT WEARING THE PURPOSE OF TEMPORARY SEEDING IS TO REDUCE EROSION AND SEDIMENTATION BY STABILIZING DISTURBED AREAS THAT WOULD OTHERWISE LAY BARE FOR PERMANENT SEEDING - COASTAL
COURSE SURFACE SHALL BE WITHIN A TOLERANCE OF 3/16" WHEN MEASURED WITH A 10' STRAIGHT EDGE.) (PAVEMENT VARIATION FROM TRUE DESIGN LONG PERIODS OF TIME BEFORE THEY ARE WORKED OR STABILIZED. TEMPORARY SEEDING IS ALSO USED WHERE PERMANENT VEGETATION GROWTH IS NOT
ELEVATION SHALL BE 1/4" OR LESS.) NECESSARY OR APPROPRIATE.
SPECIES RATES PER ACRE PLANTING DATES
22. SPOT ELEVATIONS SHALL TAKE PRECEDENCE OVER CONTOURS AND SLOPES SHOWN. THE CONTRACTOR SHALL NOTIFY THE ENGINEER OF SPOT ELEVATIONS
WHEN AND WHERE TO USE IT SANDY, DROUGHTY SITES
WHICH DO NOT APPEAR TO BE CONSISTENT WITH THE CONTOURS AND SLOPES. SPOT ELEVATIONS SHALL BE USED FOR SETTING ELEVATIONS OF CURB AND
GUTTER AND UTILITIES. TEMPORARY SEEDING IS USED ON EXPOSED SOIL SURFACES SUCH AS DENUDED AREAS, SOIL STOCKPILES, DIKES, DAMS, BANKS OF SEDIMENT BASINS, BANKS OF BROWNTOP MILLET 10 LBS. MAR. 10 - SEPT. 1
SEDIMENT TRAPS, AND TEMPORARY ROAD BANKS. TEMPORARY SEEDING PREVENTS AND LIMITS COSTLY MAINTENANCE OPERATIONS ON OTHER SEDIMENT
BAHIAGRASS 40 LBS.
23. IF GRADE ADJUSTMENTS ARE REQUIRED, THE CONTRACTOR SHALL NOTIFY THE THE ENGINEER TO INVESTIGATE SUCH ADJUSTMENTS. CONTROL STRUCTURES. SEDIMENT CLEANOUT REQUIREMENTS FOR SEDIMENT BASINS, SEDIMENT, TRAPS, AND SILT FENCE IS REDUCED IF THE DRAINAGE AREA IS
SEEDED WHEN GRADING AND CONSTRUCTION OPERATION ARE NOT TAKING PLACE. BROWNTOP MILLET 10 LBS. MAR. 10 - SEPT. 1
24. GRADES SHOWN AT ALL ENTRANCES ARE DESIGN GRADES. CONTRACTOR SHALL COORDINATE GRADING IN THESE AREAS WITH THE EXISTING FEATURES IN BAHIAGRASS 30 LBS.
TEMPORARY STABILIZATION IS REQUIRED WITHIN 14 DAYS AFTER CONSTRUCTION ACTIVITY IS COMPLETE UNLESS CONSTRUCTION ACTIVITY IS GOING TO RESUME
THE FIELD AND/OR CURRENT DESIGN DRAWINGS. SERICEA LESPEDEZA 40 LBS.
WITHIN 21 DAYS. COVER SEEDED AREAS WITH AN APPROPRIATE MULCH TO PROVIDE PROTECTION FROM THE WEATHER. WHEN THE TEMPORARY VEGETATION
25. SITE CONTRACTOR SHALL EXTEND UNDERGROUND ROOF DRAINAGE PIPING TO WITHIN 5 FT OF BUILDING FOR CONNECTION TO ROOF DOWNSPOUTS. DOES NOT GROW QUICKLY OR THICK ENOUGH TO PREVENT EROSION, RE-SEED AS SOON AS POSSIBLE. KEEP SEEDED AREAS ADEQUATELY MOIST. IRRIGATE THE BROWNTOP MILLET 10 LBS. MAR. 10 - JUN. 25
CONNECTIONS SHALL BE COORDINATED WITH BUILDING CONTRACTOR. SEEDED AREA IF NORMAL RAINFALL IS NOT ADEQUATE FOR THE GERMINATION AND GROWTH OF SEEDLINGS. WATER SEEDED AREAS AT CONTROLLED RATES THAT ATLANTIC COASTAL 15 LBS.
ARE LESS THAN THE RATE AT WHICH THE SOIL CAN ABSORB WATER TO PREVENT RUNOFF. RUNOFF OF IRRIGATION WATER WASTES WATER AND CAN CAUSE PANICGRASS PLS
26. ALL ROADS AND PARKING LOTS SHALL HAVE A MINIMUM 3'-0" WIDE GRASSED SHOULDER. A 5'-0" WIDE SHOULDER IS PREFERRED AND SHALL BE PROVIDED
EROSION.
WHERE POSSIBLE. BROWNTOP MILLET 10 LBS. MAR. 10 - JUN. 25
SWITCHGRASS (ALAMO) 8 LBS. PLS
27. ALL REINFORCED CONCRETE PIPE (RCP) SHALL BE CLASS III, UNLESS NOTED ON DRAWINGS WITH BELL & SPIGOT ENDS AND SHALL CONFORM TO ALL SEED SELECTION LITTLE BLUESTEM 4 LBS.
REQUIREMENTS OF ASTM C 76, LATEST EDITION, INSTALLED WITH FLEXIBLE PLASTIC (BITUMEN) GASKETS AT ALL JOINTS. GASKETS SHALL COMPLY WITH SEED SELECTION IS BASED ON GEOGRAPHICAL LOCATION, SOIL TYPE AND THE SEASON OF THE YEAR IN WHICH THE PLANTING IS TO BE DONE. USE THE TABLES IN SERICEA LESPEDEZA 20 LBS.
AASHTO M-198 751, TYPE B, AND SHALL BE INSTALLED IN STRICT ACCORDANCE WITH PIPE MANUFACTURER'S RECOMMENDATIONS. APPENDIX C AS A GUIDE FOR CONVENTIONAL TILLAGE METHODS (PLOWING, SEEDBED PREPARATION, HYDROSEEDING, ETC). IF A FAST GROWING CROP TO NURSE BROWNTOP MILLET 10 LBS. MAR. 10 - JUN. 25
28. ALL CORRUGATED PLASTIC PIPE SHALL MEET THE REQUIREMENTS OF AASHTO M-294, TYPE S, SHALL BE SMOOTH INTERIOR WITH ANNULAR CORRUGATED THE PERMANENT SPECIE OR SPECIES IS REQUIRED, THEN USE THE MIX RATE. FAILURE TO CAREFULLY FOLLOW AGRONOMIC RECOMMENDATIONS RESULTS IN AN WEEPING LOVEGRASS 8 LBS.
EXTERIOR. HI-Q SURE-LOCK 10.8 PIPE, ADS, N-12, OR APPROVED EQUAL. ALL JOINTS SHALL BE BELL AND SPIGOT AND SHALL MEET THE REQUIREMENTS OF INADEQUATE STAND OF TEMPORARY VEGETATION THAT PROVIDES LITTLE OR NO EROSION CONTROL.
WELL DRAINED, CLAYEY/LOAMEY SITES
AASHTO M-294, SHALL BE WATERTIGHT, MEETING THE REQUIREMENTS OF ASTM D 3212. THE GASKETS SHALL BE MADE OF POLYISOPRENE MEETING THE
REQUIREMENTS OF ASTM F 477. INSTALLATION SHALL CONFORM TO AASHTO M-294, ASTM D-2321, AND MANUFACTURERS INSTALLATION PROCEDURES. INSTALLATION BROWNTOP MILLET 10 LBS. MAR. 15 - SEPT. 1
* TILLAGE: IF THE AREA HAS BEEN RECENTLY PLOWED, NO TILLAGE IS REQUIRED OTHER THAN RAKING OR SURFACE ROUGHENING TO BREAK ANY CRUST THAT BAHIAGRASS 40 LBS.
29. ANY REINFORCED CONCRETE PIPE WITH MORE THAN 15 FOOT OF COVER SHALL BE CLASS IV WITH O-RING JOINTS.
HAS FORMED LEAVING A TEXTURED SURFACE. DISK THE SOIL FOR OPTIMAL GERMINATION WHEN THE SOIL IS COMPACTED LESS THAN 6-INCHES. RYE, GRAIN 10 LBS. SEPT. 1 - NOV. 10
30. ALL STORM PIPE LENGTH AND ELEVATIONS (TOPS AND INVERTS) OF STORM DRAINAGE STRUCTURES SHOWN ON THE DRAWINGS ARE APPROXIMATE. BAHIAGRASS 40 LBS.
* SOIL TESTING: SOIL TESTING IS AVAILABLE THROUGH CLEMSON UNIVERSITY COOPERATIVE EXTENSION SERVICE.
CONTRACTOR MAY HAVE TO FIELD ADJUST AS NECESSARY DURING CONSTRUCTION. THE CONTRACTOR MAY USE PRE-CAST DRAINAGE STRUCTURES AS AN CLOVER, CRIMSON (ANNUAL) 5 LBS.
ALTERNATE FOR STRUCTURES SPECIFIED ON THIS PLAN. HOWEVER, THE OWNER AND CLINE ENGINEERING, INC. ASSUME NO RESPONSIBILITY FOR THESE * LIME: LIME IS NOT REQUIRED FOR TEMPORARY SEEDING UNLESS A SOIL TEST SHOWS THAT THE SOIL PH IS BELOW 5.0. IT MAY BE DESIRABLE TO APPLY LIME
BROWNTOP MILLET 10 LBS. MAR. 15 - SEPT. 1
STRUCTURES, AS FIELD CONDITIONS DURING CONSTRUCTION OFTEN DICTATE ADJUSTMENTS STORM DRAINAGE STRUCTURES. THE CONTRACTOR RETAINS DURING THE TEMPORARY SEEDING OPERATION TO BENEFIT THE LONG-TERM PERMANENT SEEDING.
BAHIAGRASS 30 LBS.
ALL RESPONSIBILITY AND EXPENSE FOR MODIFYING THESE PRE-CAST STRUCTURES TO ACCOMMODATE THESE ADJUSTMENTS.
* FERTILIZER: APPLY A MINIMUM OF 1.5 TONS OF LIME/ACRE (70 POUNDS PER 1000 SQUARE FEET) IF IT IS TO BE USED.APPLY A MINIMUM OF 500 POUNDS PER SERICEA LESPEDEZA 40 LBS.
31. ANY REINFORCED CONCRETE PIPE STEEPER THAN 10 PERCENT MUST HAVE CONCRETE COLLARS. CORRUGATED METAL PIPE WITH HUGGER BANDS MAY BE ACRE OF 10-10-10 FERTILIZER (11.5 POUNDS PER 1000 SQUARE FEET) OR EQUIVALENT DURING TEMPORARY SEEDING UNLESS A SOIL TEST INDICATES A BROWNTOP MILLET 10 LBS. MAR. 15 - SEPT. 1
SUBSTITUTED. THE NUMBER OF CONCRETE COLLARS AND TYPE OF STORM PIPE WILL BE DETERMINED TOGETHER BY THE CONTRACTOR AND THE ENGINEER. DIFFERENT REQUIREMENT. INCORPORATE FERTILIZER AND LIME (IF USED) INTO THE TOP 4-6 INCHES OF THE SOIL BY DISKING OR OTHER MEANS WHERE BERMUDA, COMMON 10 LBS.
32. ALL SANITARY SEWER WORK SHALL BE CONSTRUCTED TO LINES AND GRADES SHOWN AND AS DETAILED ON THE DRAWINGS. ALL MANHOLE/CLEANOUT TOP CONDITIONS ALLOW. SERICEA LESPEDEZA 40 LBS.
ELEVATIONS ON CIVIL DRAWINGS ARE APPROXIMATE. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO ENSURE THAT ALL MANHOLE/CLEANOUT TOPS ARE * SEEDING: LOOSEN THE SOIL SURFACE BEFORE BROADCASTING THE SEED. APPLY SEED EVENLY BY THE MOST CONVENIENT METHOD AVAILABLE FOR THE BROWNTOP MILLET 10 LBS. MAR. 15 - SEPT. 1
FLUSH WITH PAVEMENT FINISHED GRADE THROUGHOUT THE PROJECT. TYPE OF SEED USED AND THE LOCATION OF THE TEMPORARY SEEDING. TYPICAL APPLICATION METHODS INCLUDE BUT ARE NOT LIMITED TO CYCLONE BERMUDA, COMMON 12 LBS.
SEEDERS, ROTARY SPREADERS, DROP SPREADERS, BROADCAST SPREADERS, HAND SPREADERS, CULTIPACKER SEEDER, AND HYDRO-SEEDERS. COVER KOBE LESPEDEZA (ANNUAL) 10 LBS.
33. THE CONTRACTOR SHALL PROVIDE STANDARD CLEAN-OUTS OR MANHOLES AT ALL BENDS AND CHANGES IN GRADE IN SEWER LINES AND CONNECTIONS TO
APPLIED SEED BY RAKING OR DRAGGING A CHAIN, AND THEN LIGHTLY FIRM THE AREA WITH A ROLLER OR CULTIPACKER.
EXISTING SEWER LINES. PIPE BEDDING AND BACKFILL SHALL BE CAREFULLY CONTROLLED. ALL SANITARY SEWER WORK SHALL COMPLY WITH LOCAL CODES BROWNTOP MILLET 10 LBS. MAR. 15 - SEPT. 1
AND ORDINANCES. THE CONTRACTOR SHALL BE RESPONSIBLE FOR MEETING WITH THE LOCAL AND STATE SEWER APPROVAL AUTHORITIES TO INSURE THAT * MULCHING: USE MULCH WITH TEMPORARY SEED APPLICATIONS TO RETAIN SOIL MOISTURE AND REDUCE EROSION DURING THE ESTABLISHMENT OF BAHIAGRASS 20 LBS.
ALL MATERIALS, INSTALLATION, TESTING, AND AS-BUILT DRAWING REQUIREMENTS WILL BE TO THE SATISFACTION OF THE LOCAL AND STATE AUTHORITIES. VEGETATION. TYPICAL MULCH APPLICATIONS INCLUDE STRAW, WOOD FIBER, HYDROMULCHES, BFM AND FGM. USE HYDROMULCHES WITH A MINIMUM BLEND BERMUDA, COMMON 6 LBS.
OF 70% WOOD FIBERS. THE MOST COMMONLY ACCEPTED MULCH USED IN CONJUNCTION WITH TEMPORARY SEEDING IS SMALL GRAIN STRAW. THIS STRAW SERICEA LESPEDEZA 40 LBS.
34. ALL WATER LINES SHALL BE INSTALLED AS SHOWN ON THE DRAWINGS. ALL PIPES, VALVES, AND FITTINGS SHALL COMPLY WITH AWWA STANDARDS, ALL LOCAL
AND STATE CODES AND ORDINANCES. PIPE BEDDING AND BACKFILL SHALL BE CAREFULLY CONTROLLED. WATER LINES SHALL BE PRESSURE TESTED, AND SHOULD BE DRY AND FREE FROM MOLD DAMAGE AND NOXIOUS WEEDS. THE STRAW MAY NEED TO BE ANCHORED WITH NETTING OR EMULSIONS TO PREVENT BROWNTOP MILLET 10 LBS. MAR. 15 - SEPT. 1
DISINFECTED AS REQUIRED. ALL NECESSARY AS-BUILTS SHALL BE ACCOMPLISHED TO THE SATISFACTION OF THE LOCAL AUTHORITY. IT FROM BEING BLOWN OR WASHED AWAY. APPLY THE STRAW MULCH BY HAND OR MACHINE AT THE RATE 1.5-2 TONS PER ACRE (90 POUNDS PER 1000 SWITCHGRASS 8 LBS. PLS
SQUARE FEET). FREQUENT INSPECTIONS ARE NECESSARY TO CHECK THAT CONDITIONS FOR GROWTH ARE GOOD. LITTLE BLUESTEM 3 LBS. PLS
35. ALL UTILITY TRENCHES SHALL BE THOROUGHLY COMPACTED AND TESTED TO PREVENT SETTLEMENT AND DAMAGE TO FUTURE PAVEMENT AND STRUCTURES. INDIANGRASS 3 LBS. PLS
* IRRIGATION: SEEDED AREAS SHOULD BE KEPT ADEQUATELY MOIST. IRRIGATE THE SEEDED AREA IF NORMAL RAINFALL IS NOT ADEQUATE FOR THE
36. ASPHALT PAVING FOR LIGHT DUTY AREAS SHALL BE CONSTRUCTED ON A PREPARED AND WELL-DRAINED SUBGRADE COMPACTED AS SPECIFIED. THE BASE GERMINATION AND GROWTH OF SEEDLINGS. WATER SEEDED AREAS AT CONTROLLED RATES THAT ARE LESS THAN THE RATE AT WHICH THE SOIL CAN
COURSE SHALL BE CONSTRUCTED WITH 6" COMPACTED THICKNESS STONE BASE. THE SURFACE COURSE SHALL BE CONSTRUCTED WITH 2" COMPACTED ABSORB WATER TO PREVENT RUNOFF. RUNOFF OF IRRIGATION WATER WASTES WATER AND CAN CAUSE EROSION.
THICKNESS ALL PAVING WORK (MATERIALS AND CONSTRUCTION) SHALL COMPLY WITH STATE SPECIFICATIONS.
* RE-SEEDING: RE-SEED AREAS WHERE SEEDING DOES NOT GROW QUICKLY, THICK ENOUGH, OR ADEQUATELY TO PREVENT EROSION. BASE SEED SELECTION
37. ASPHALT PAVING FOR HEAVY DUTY AREAS SHALL BE CONSTRUCTED ON A PREPARED AND WELL-DRAINED SUBGRADE COMPACTED AS SPECIFIED. THE BASE SHOULD ON THE REQUIREMENTS OF LOCAL SPECIFICATIONS.
COURSE SHALL BE CONSTRUCTED WITH 8" COMPACTED THICKNESS STONE BASE. THE BINDER COURSE SHALL BE CONSTRUCTED WITH 1.5" COMPACTED
THICKNESS ASPHALT CONCRETE. THE SURFACE COURSE SHALL BE CONSTRUCTED WITH 1.5" COMPACTED THICKNESS ASPHALT CONCRETE. ALL PAVING
INSPECTION AND MAINTENANCE
WORK (MATERIALS AND CONSTRUCTION) SHALL COMPLY WITH STATE SPECIFICATIONS.
* INSPECT EVERY 7 CALENDAR DAYS AND WITHIN 24-HOURS AFTER EACH RAINFALL EVENT THAT PRODUCES 12-INCHES OR MORE OF PRECIPITATION.
38. CONCRETE TRUCK PAVEMENT SHALL BE CONSTRUCTED WITH 4,000 PSI CONCRETE, 6" THICK REINFORCED WITH 6" X 6" - W2.9 X W2.9 W.W.M. JOINTS SHALL BE
CONSTRUCTED AS SHOWN ON DETAILS. * COVER SEEDED WITH MULCH TO PROVIDE PROTECTION. FREQUENT INSPECTIONS ARE NECESSARY TO CHECK THAT CONDITIONS FOR GROWTH ARE GOOD.
39. CONCRETE SIDEWALKS SHALL BE CONSTRUCTED WITH 3,000 PSI CONCRETE, 4" THICK NON-REINFORCED WITH JOINTS AS SHOWN ON DETAILS. * SUPPLY TEMPORARY SEEDING WITH ADEQUATE MOISTURE. SUPPLY WATER AS NEEDED, ESPECIALLY IN ABNORMALLY HOT OR DRY WEATHER OR ON
ADVERSE SITES. CONTROL WATER APPLICATION RATES TO PREVENT RUNOFF.
40. ALL AREAS NOT COVERED BY BUILDINGS AND PAVEMENT SHALL RECEIVE TOPSOIL AND BE GRASSED IN ACCORDANCE WITH SPECIFICATIONS.
* BASE SEED SELECTION ON LOCAL SPECIFICATIONS.
41. CONCRETE CURB AND GUTTER SHALL BE 18" WIDE WITH 6" CURB CONSTRUCTED WITH 3,000 PSI CONCRETE WITH EXPANSION JOINTS AND CONTRACTION
JOINTS INSTALLED TO COMPLY WITH S.C.D.O.T. STANDARD SPECIFICATION FOR MATERIALS AND CONSTRUCTION OF CURB AND GUTTER. * RE-SEED AREAS WHERE THE PLANTS DO NOT GROW QUICK ENOUGH, THICK ENOUGH, OR ADEQUATELY ENOUGH TO PREVENT EROSION SHOULD BE
RE-SEEDED.
42. THE GRADING CONTRACTOR SHALL MAINTAIN POSITIVE DRAINAGE AWAY FROM BUILDING AT ALL TIMES. CONTRACTOR SHALL BRING TO THE ATTENTION OF
THE ENGINEER ANY AREAS THAT MAY NOT DRAIN PROPERLY DURING CONSTRUCTION.
43. GRADING CONTRACTOR SHALL INCLUDE IN COST ALL CUT/FILL AND IMPORT/EXPORT NECESSARY FOR EARTHWORK BALANCE. CONTRACTOR SHALL INCLUDE TEMPORARY SEEDING - COASTAL
IN COST ALL WETTING/DRYING OF SOILS NECESSARY TO ACHIEVE COMPACTION PER SPECIFICATIONS.
44. THE CONTRACTOR SHALL CONFORM TO THE CONSTRUCTION SEQUENCE. SPECIES RATES PER ACRE PLANTING DATES
45. THE CONTRACTOR SHALL CONSTRUCT TEMPORARY SEDIMENT TRAPS BEFORE OTHER SITE GRADING AND SITEWORK IS BEGUN. THE SEDIMENT TRAPS AND SANDY, DROUGHTY SITES
SEDIMENT CONTROL DURING CONSTRUCTION SHALL COMPLY WITH ALL LOCAL CODES AND REGULATIONS. AFTER ALL SITEWORK IS COMPLETED AND BROWNTOP MILLET 40 LBS. MAR. 10 - SEPT. 1
GRASSING ESTABLISHED, THE GRADING CONTRACTOR SHALL REMOVE ALL SILT FROM THE SITE AND LEGALLY DISPOSE OF ALL SILT OFF-SITE AT NO
ADDITIONAL COST TO THE OWNER. RYE, GRAIN 56 LBS. SEPT. 1 - MAR. 15
46. THE CONTRACTOR SHALL NOTIFY THE OWNER'S REPRESENTATIVE WHEN INSTRUCTIONS FROM REGULATORY AGENCIES ARE RECEIVED AND COMPLY WITH RYEGRASS 50 LBS. SEPT. 1 - APR. 15
INSTRUCTIONS AS DIRECTED BY THE OWNER'S REPRESENTATIVE.
WELL DRAINED, CLAYEY/LOAMEY SITES
47. THE CONTRACTOR SHALL CAREFULLY STUDY AND COMPARE THE CONSTRUCTION DOCUMENTS AND SHALL AT ONCE REPORT TO THE ENGINEER ANY BROWNTOP MILLET OR JAPANESE MILLET 40 LBS. MAR. 15 - SEPT. 1
INCONSISTENCIES OR OMISSIONS DISCOVERED. THE CONTRACTOR SHALL TAKE FIELD MEASUREMENTS TO VERIFY THAT ALL LOCATIONS ARE CORRECT
PRIOR TO COMMENCING CONSTRUCTION. RYE, GRAIN 56 LBS. SEPT. 1 - MAR. 15
OR OATS 75 LBS.
48. THE CONTRACTOR SHALL NOT PERFORM ANY WORK ON ANY UTILITIES OR IN ANY PUBLIC RIGHT-OF-WAYS UNTIL HE HAS OBTAINED COPIES OF ALL
RYEGRASS 50 LBS. SEPT. 1 - APR. 15
NECESSARY ENCROACHMENT AND CONSTRUCTION PERMITS. ANY FIELD CHANGES WITHIN SCDOT R/W OR CHANGES THAT WOULD IMPACT SCDOT R/W WILL
REQUIRE WRITTEN SCDOT APPROVAL PRIOR TO CHANGES BEING IMPLEMENTED IN THE FIELD. (E.G. DRAINAGE, GRADING, ACCESS DESIGN ETC..).
| WATER LINES SCDES 1. ALL WATER LINES SHALL BE INSTALLED IN ACCORDANCE WITH THE SPECIFICATIONS AND DETAILS. ALL MATERIALS AND PRODUCTS THAT CONTACT POTABLE 1. IF NECESSARY, SLOPES, WHICH EXCEED EIGHT (8) VERTICAL FEET SHOULD BE STABILIZED WITH SYNTHETIC OR VEGETATIVE MATS, IN ADDITION TO WATER MUST BE THIRD PARTY CERTIFIED AS MEETING THE SPECIFICATIONS OF ANSI/NSF STANDARD 61. ALL PIPING MATERIALS AND INSTALLATION SHALL HYDROSEEDING. IT MAY BE NECESSARY TO INSTALL TEMPORARY SLOPE DRAINS DURING CONSTRUCTION. TEMPORARY BERMS MAY BE NEEDED UNTIL THE MEET THE APPROVAL OF THE LOCAL AUTHORITY AND THE STATE HEALTH AUTHORITY. SLOPE IS BROUGHT TO GRADE. 2. ALL DUCTILE IRON PIPE (DIP) SHALL BE PRESSURE CLASS "350" CONFORMING TO AWWA C151. ALL FITTINGS SHALL BE EITHER MECHANICAL OR PUSH-ON JOINT 2. STABILIZATION MEASURES SHALL BE INITIATED AS SOON AS PRACTICABLE IN PORTIONS OF THE SITE WHERE CONSTRUCTION ACTIVITIES HAVE TEMPORARILY AND SHALL COMPLY WITH AWWA C110. ALL POLY-VINYL CHLORIDE WATER LINES 4" AND SMALLER SHALL BE CLASS 200 -SDR21 CONFORMING TO ASTM D-2241 OR PERMANENTLY CEASED, BUT IN NO CASE MORE THAN FOURTEEN (14) DAYS AFTER WORK HAS CEASED, EXCEPT AS STATED BELOW. AND ASTM D-1784. WATER LINES 6" AND LARGER SHALL BE 235, DR18, JM EAGLE OR APPROVED EQUAL CONFORMING TO AWWA C-900 AND N.S.F. APPROVED. A * WHERE STABILIZATION BY THE 14TH DAY IS PRECLUDED BY SNOW COVER OR FROZEN GROUND CONDITIONS STABILIZATION MEASURES MUST BE DETECTABLE TAPE WITH THE WORDS "CAUTION: WATERLINE BURIED BELOW" SHALL BE INSTALLED 6" TO 12" ABOVE THE PIPE. INITIATED AS SOON AS PRACTICABLE. 3. SEAMLESS COPPER TUBING, 3" AND SMALLER SHALL BE TYPE "K" ROLL FORM TO COMPLY WITH ASTM B-88, LATEST REVISION AND SHALL BE INSTALLED WITH * WHERE CONSTRUCTION ACTIVITY ON A PORTION OF THE SITE IS TEMPORARILY CEASED, AND EARTH-DISTURBING ACTIVITIES WILL BE RESUMED WITHIN 14 WROUGHT COPPER (95-5 TIN ANTIMONY SOLDER JOINT) FITTINGS IN ACCORDANCE WITH ASTM B16.22. DAYS, TEMPORARY STABILIZATION MEASURES DO NOT HAVE TO BE INITIATED ON THAT PORTION OF THE SITE. 4. ALL WATER LINES SHALL BE PRESSURE TESTED TO 1.5 TIMES THE MAXIMUM WORKING PRESSURE, 150 PSIG (MINIMUM), CLEANED, STERILIZED, AND FLUSHED 3. ALL SEDIMENT AND EROSION CONTROL DEVICES SHALL BE INSPECTED ONCE EVERY CALENDAR WEEK. IF PERIODIC INSPECTION OR OTHER INFORMATION UNTIL TWO SUCCESSIVE SATISFACTORY WATER BACTERIOLOGICAL SAMPLES TAKEN AT LEAST 24 HOURS APART ARE OBTAINED. THE SAMPLES SHALL BE INDICATES THAT A BMP HAS BEEN INAPPROPRIATELY, OR INCORRECTLY, THE PERMITTEE MUST ADDRESS THE NECESSARY REPLACEMENT OR MODIFICATION ANALYZED BY A STATE APPROVED LABORATORY. THE RESULTS SHALL INCLUDE BOTH COLIFORM AND NON-COLIFORM GROWTH. ALL BACKFLOW PREVENTION REQUIRED TO CORRECT THE BMP WITHIN 48 HOURS OF IDENTIFICATION. DEVICES SHALL BE INSPECTED AND CERTIFIED BY A LICENSED INSPECTOR. 4. PROVIDE SILT FENCE AND/OR OTHER CONTROL DEVICES, AS MAY BE REQUIRED, TO CONTROL SOIL EROSION DURING UTILITY CONSTRUCTION. ALL DISTURBED 5. ALL FIRE HYDRANTS SHALL COMPLY WITH AWWA C502 AND MEET THE APPROVAL OF THE LOCAL WATER AUTHORITY. AREAS SHALL BE CLEANED, GRADED, AND STABILIZED WITH GRASSING IMMEDIATELY AFTER THE UTILITY INSTALLATION. FILL, COVER, AND TEMPORARY 6. ALL GATE VALVES SHALL COMPLY WITH AWWA C500, 175 PSI WORKING PRESSURE AND MEET THE APPROVAL OF THE LOCAL WATER AUTHORITY. SEEDING AT THE END OF EACH DAY ARE RECOMMENDED. IF WATER IS ENCOUNTERED WHILE TRENCHING, THE WATER SHOULD BE FILTERED TO REMOVE SEDIMENT BEFORE BEING PUMPED BACK INTO ANY WATERS OF THE STATE. 7. A MINIMUM OF A DOUBLE CHECK VALVE (BACKFLOW PREVENTOR) ASSEMBLY SHALL BE INSTALLED ON ALL LINES DEDICATED FOR FIRE LINE SPRINKLER SYSTEMS IN A MANNER ACCEPTABLE TO THE LOCAL AUTHORITY. A BACKFLOW PREVENTION DEVICE MEETING STATE AND LOCAL REQUIREMENTS SHALL BE 5. ALL EROSION CONTROL DEVICES SHALL BE PROPERLY MAINTAINED DURING ALL PHASES OF CONSTRUCTION UNTIL THE COMPLETION OF ALL CONSTRUCTION INSTALLED ON ALL DOMESTIC WATER LINES. ACTIVITIES AND ALL DISTURBED AREAS HAVE BEEN STABILIZED. ADDITIONAL CONTROL DEVICES MAY BE REQUIRED DURING CONSTRUCTION IN ORDER TO CONTROL EROSION AND/OR OFFSITE SEDIMENTATION. ALL TEMPORARY CONTROL DEVICES SHALL BE REMOVED ONCE CONSTRUCTION IS COMPLETE AND THE 8. ALL PIPE MATERIAL, SOLDER AND FLUX SHALL BE LEAD FREE (LESS THAN 0.2% LEAD IN SOLDER AND FLUX AND LESS THAN 8.0% LEAD IN PIPES AND FITTINGS). SITE IS STABILIZED. LUBRICANTS WHICH WILL SUPPORT MICROBIOLOGICAL GROWTH SHALL NOT BE USED FOR SLIP ON JOINTS. VEGETABLE SHORTENING SHALL NOT BE USED TO LUBRICATE JOINTS. NATURAL RUBBER OR OTHER MATERIAL WHICH WILL SUPPORT MICROBIOLOGICAL GROWTH MAY NOT BE USED FOR ANY GASKETS, 6. THE CONTRACTOR MUST TAKE NECESSARY ACTION TO MINIMIZE THE TRACKING OF MUD ONTO PAVED ROADWAY(S) FROM CONSTRUCTION AREAS AND THE O-RINGS, AND OTHER PRODUCTS USED FOR JOINTING PIPES, SETTING METERS OR VALVES, OR OTHER APPURTENANCES WHICH WILL EXPOSE THE MATERIAL GENERATION OF DUST. THE CONTRACTOR SHALL DAILY REMOVE MUD/SOIL FROM PAVEMENT, AS MAY BE REQUIRED. TO THE WATER. 7. RESIDENTIAL SUBDIVISIONS REQUIRE EROSION CONTROL FEATURES FOR INFRASTRUCTURE AS WELL AS FOR INDIVIDUAL LOT CONSTRUCTION. INDIVIDUAL 9. ALL WATER LINES SHALL BE INSPECTED BY THE UTILITY COMPANY AND THE ENGINEER AND CERTIFIED TO THE STATE HEALTH AUTHORITY BEFORE PROPERTY OWNERS SHALL FOLLOW THESE PLANS DURING CONSTRUCTION OR OBTAIN APPROVAL OF AN INDIVIDUAL PLAN IN ACCORDANCE WITH S.C REG. ACCEPTANCE AND A PERMIT TO OPERATE WILL BE ISSUED AS REQUIRED. 72-300 ET SEQ. AND SCR100000. 10. ALL WATER LINE SHALL HAVE A MINIMUM 3'-0" COVER. 8. TEMPORARY DIVERSION BERMS AND/OR DITCHES WILL BE PROVIDED AS NEEDED DURING CONSTRUCTION TO PROTECT WORK AREAS FROM UPSLOPE RUNOFF AND/OR TO DIVERT SEDIMENT-LADEN WATER TO APPROPRIATE TRAPS OR STABLE OUTLETS. 11. WATER LINE SHALL BE INSTALLED AFTER SANITARY SEWER LINES ARE COMPLETE WHERE THEY CROSS. CONTRACTOR SHALL MAINTAIN A 10' HORIZONTAL AND 2' VERTICAL CLEARANCE OF WATER AND SEWER LINES. ALL WATER LINES SHALL CROSS ABOVE SEWER LINES. 9. ALL WATERS OF THE STATE (WOS), INCLUDING WETLANDS, ARE TO BE FLAGGED OR OTHERWISE CLEARLY MARKED IN THE FIELD. A DOUBLE ROW OF SILT FENCE IS TO BE INSTALLED IN ALL AREAS WHERE A 50-FOOT BUFFER CAN'T BE MAINTAINED BETWEEN THE DISTURBED AREA AND ALL WOS. A 10-FOOT BUFFER 12. CONTRACTOR SHALL INCLUDE COST OF METER AND TAP FEES IN PROPOSAL. THE CONTRACTOR WILL BE RESPONSIBLE FOR ALL EXCAVATION, COORDINATION SHOULD BE MAINTAINED BETWEEN THE LAST ROW OF SILT FENCE AND ALL WOS.. AND SCHEDULING OF TAPS. THE CONTRACTOR WILL INSTALL WATER METER AND BOX AS FURNISHED BY THE LOCAL AUTHORITY AND INSTALL SERVICES LINES TO WITHIN 5' OF BUILDING AS INDICATED ON THE DRAWINGS. 10. LITTER, CONSTRUCTION DEBRIS, OILS, FUELS, AND BUILDING PRODUCTS WITH SIGNIFICANT POTENTIAL FOR IMPACT (SUCH AS STOCKPILES OF FRESHLY TREATED LUMBER) AND CONSTRUCTION CHEMICALS THAT COULD BE EXPOSED TO STORM WATER MUST BE PREVENTED FROM BECOMING A POLLUTANT 13. THE CONTRACTOR WILL FOLLOW PROCEDURES AS DIRECTED TO FLUSH, STERILIZE AND FURNISH WATER SAMPLES FOR TESTING AS PER AWWA 651 UNTIL SOURCE IN STORM WATER DISCHARGES. APPROVAL IS GRANTED BY THE STATE HEALTH AUTHORITY AND THE LOCAL WATER SYSTEM. A PERMIT TO OPERATE WILL NOT BE ISSUED UNTIL THE COMPLETED WATER SYSTEM MEETS ALL REQUIRED STATE AND LOCAL APPROVALS. THE CONTRACTOR IS RESPONSIBLE TO FURNISH THE OWNER WITH A 11. A COPY OF THE SWPPP, INSPECTIONS RECORDS, AND RAINFALL DATA MUST BE RETAINED AT THE CONSTRUCTION SITE OR A NEARBY LOCATION EASILY COMPLETED AND APPROVED WATER SYSTEM ALONG WITH A SET OF APPROVED AS-BUILT DRAWINGS IN A FORMAT ACCEPTABLE TO THE LOCAL UTILITY ACCESSIBLE DURING NORMAL BUSINESS HOURS, FROM THE DATE OF COMMENCEMENT OF CONSTRUCTION ACTIVITIES TO THE DATE THAT FINAL AUTHORITY. STABILIZATION IS REACHED. 14. THE CONTRACTOR SHALL NOT PERFORM ANY WORK UNTIL HE HAS OBTAINED COPIES OF ALL NECESSARY ENCROACHMENT AND CONSTRUCTION PERMITS. 12. INITIATE STABILIZATION MEASURES ON ANY EXPOSED STEEP SLOPE (3H:1V OR GREATER) WHERE LAND-DISTURBING ACTIVITIES HAVE PERMANENTLY OR TEMPORARILY CEASED, AND WILL NOT RESUME FOR A PERIOD OF 7 CALENDAR DAYS. 15. THE CONTRACTOR IS RESPONSIBLE FOR CONTACTING THE LOCAL WATER AUTHORITY AND DETERMINING THE REQUIREMENTS AND PROCEDURES FOR OBTAINING THE AUTHORITY'S APPROVAL OF THE WATER SYSTEM PRIOR TO SUBMITTING A PRICE TO THE OWNER. THE DETAILS AND SPECIFICATIONS OF THE 13. MINIMIZE SOIL COMPACTION AND, UNLESS INFEASIBLE, PRESERVE TOPSOIL. LOCAL WATER AUTHORITY SHALL GOVERN. 14. MINIMIZE THE DISCHARGE OF POLLUTANTS FROM EQUIPMENT AND VEHICLE WASHING, WHEEL WASH WATER, AND OTHER WASH WATERS. WASH WATERS SANITARY SEWER LINES MUST BE TREATED IN A SEDIMENT BASIN OR ALTERNATIVE CONTROL THAT PROVIDES EQUIVALENT OR BETTER TREATMENT PRIOR TO DISCHARGE; 15. MINIMIZE THE DISCHARGE OF POLLUTANTS FROM DEWATERING OF TRENCHES AND EXCAVATED AREAS. THESE DISCHARGES ARE TO BE ROUTED THROUGH 1. ALL CONSTRUCTION SHALL BE PER THE LOCAL SEWER UTILITY'S REQUIREMENTS AND SPECIFICATIONS. APPROPRIATE BMPS (SEDIMENT BASIN, FILTER BAG, ETC.). 2. THE PLUMBER IS RESPONSIBLE FOR SETTING INVERT ELEVATIONS, PIPE SLOPES, ETC MEETING ALL LOCAL AND STATE CODES. 16. THE FOLLOWING DISCHARGES FROM SITES ARE PROHIBITED 3. EACH JOINT SHALL BE CLEARLY AND LEGIBLY MARKED WITH THE MANUFACTURER'S NAME OR IDENTIFYING SYMBOL WITH THE LETTERS E.S. APPEARING ON * WASTEWATER FROM WASHOUT OF CONCRETE, UNLESS MANAGED BY AN APPROPRIATE CONTROL; THE EXTERIOR OF THE PIPE NEAR THE SOCKET. * WASTEWATER FROM WASHOUT AND CLEANOUT OF STUCCO, PAINT, FORM RELEASE OILS, CURING COMPOUNDS AND OTHER CONSTRUCTION MATERIALS; 4. A MINIMUM OF 3 FEET OF COVER SHALL BE MAINTAINED OVER ALL PVC PIPE LINES. * FUELS, OILS, OR OTHER POLLUTANTS USED IN VEHICLE AND EQUIPMENT OPERATION AND MAINTENANCE; AND 5. WATER LINES SHALL BE INSTALLED AFTER ALL GRAVITY SEWER LINES ARE INSTALLED. * SOAPS OR SOLVENTS USED IN VEHICLE AND EQUIPMENT WASHING. 6. THIS CONTRACTOR SHALL VERIFY THE LOCATION OF ALL EXISTING UNDERGROUND UTILITIES BEFORE COMMENCING WORK. CONTACT WATER, TELEPHONE, POWER AND GAS COMPANY BEFORE EXCAVATION IS BEGUN. 17. AFTER CONSTRUCTION ACTIVITIES BEGIN, INSPECTIONS MUST BE CONDUCTED AT A MINIMUM OF AT LEAST ONCE EVERY CALENDAR WEEK AND MUST BE CONDUCTED UNTIL FINAL STABILIZATION IS REACHED ON ALL AREAS OF THE CONSTRUCTION SITE. 7. THIS CONTRACTOR SHALL BE RESPONSIBLE FOR ALL SURVEY WORK NECESSARY TO STAKE SEWER LINES. THE CENTERLINE AND ALL CLEANOUT LOCATIONS SHALL BE STAKED IN THE FIELD. THE OWNER'S SURVEYOR WILL SET ALL LOT CORNERS. THE CONTRACTOR SHALL PROTECT ALL PROPERTY MARKERS. 18. IF EXISTING BMPS NEED TO BE MODIFIED OR IF ADDITIONAL BMPS ARE NECESSARY TO COMPLY WITH THE REQUIREMENTS OF THIS PERMIT AND/OR SC'S WATER QUALITY STANDARDS, IMPLEMENTATION MUST BE COMPLETED BEFORE THE NEXT STORM EVENT WHENEVER PRACTICABLE. IF IMPLEMENTATION 8. ALL UTILITY TRENCHES SHALL BE THOROUGHLY COMPACTED TO PREVENT SETTLEMENT AND DAMAGE TO FUTURE PAVEMENT AND STRUCTURES. BEFORE THE NEXT STORM EVENT IS IMPRACTICABLE, THE SITUATION MUST BE DOCUMENTED IN THE SWPPP AND ALTERNATIVE BMPS MUST BE IMPLEMENTED AS SOON AS REASONABLY POSSIBLE. 9. THE CONTRACTOR SHALL BE RESPONSIBLE FOR REPAIRS TO EXISTING ROADS USED BY HIS OPERATION. THE CONTRACTOR SHALL REMOVE MUD AND DEBRIS FROM HIGHWAY AND NOT ALLOW DUST TO BECOME A NUISANCE OR SAFETY HAZARD. 19. A PRE-CONSTRUCTION CONFERENCE MUST BE HELD FOR EACH CONSTRUCTION SITE WITH AN APPROVED ON-SITE SWPPP PRIOR TO THE IMPLEMENTATION OF CONSTRUCTION ACTIVITIES. FOR NON-LINEAR PROJECTS THAT DISTURB 10 ACRES OR MORE THIS CONFERENCE MUST BE HELD ON-SITE UNLESS THE 10. ALL SANITARY SEWER WORK SHALL BE CONSTRUCTED TO LINES AND GRADES SHOWN AS DETAILED ON THE DRAWING. THE CONTRACTOR SHALL PROVIDE DEPARTMENT HAS APPROVED OTHERWISE. STANDARD MANHOLES OR CLEAN-OUTS AT ALL BENDS AND CHANGES IN GRADE IN SEWER LINES AND CONNECTIONS TO EXISTING SEWER LINES. PIPE BEDDING AND BACKFILL SHALL BE CAREFULLY CONTROLLED. ALL SANITARY SEWER WORK SHALL COMPLY WITH LOCAL CODES AN ORDINANCES. THE MISCELLANEOUS ENGINEER, THE LOCAL AUTHORITY AND THE STATE HEALTH AUTHORITY MUST INSPECT ALL SEWER WORK AS REQUIRED BEFORE BEING PUT IN SERVICE. 11. ALL WORK SHALL BE CONSTRUCTED IN STRICT ACCORDANCE WITH THE PLANS AND SPECIFICATIONS AND INSTRUCTIONS GIVEN BY THE OWNER'S 1. ALL RIP RAP FOR CHECK DAMS, EMERGENCY SPILLWAYS, AND OUTLET STABILIZATION PROTECTION TO BE UNDERLAIN WITH FILTER FABRIC. ALL RIP-RAP REPRESENTATIVE, THE STATE HEALTH AUTHORITY AND THE LOCAL GOVERNING AUTHORITY. SHALL BE DUMPED RIP-RAP IN ACCORDANCE WITH THE SOUTH CAROLINA STATE HIGHWAY DEPARTMENT STANDARD SPECIFICATIONS FOR HIGHWAY CONSTRUCTION, LATEST EDITION. PIECES SHALL BE NO LARGER THAN 24 INCHES. 12. ALL SEWER LINES IN RELATION TO WATER LINES MUST CONFORM TO "TEN STATES STANDARDS", SECTION 38.3, 1990 EDITION, AT A MINIMUM. MAINTAIN A MINIMUM OF 10' HORIZONTAL AND 2' VERTICAL SEPARATION BETWEEN THE WATER AND SANITARY SEWER LINES. WATER LINES SHALL CROSS OVER SANITARY 2. ASPHALT DESIGN SHALL BE DONE BY GEOTECHICAL ENGINEER. CONTRACTOR TO COORDINATE WITH OWNER FOR ASPHALT SPECIFICATION. SEWER LINES. 3. THE CONTRACTOR IS RESPONSIBLE FOR OBTAINING ALL PERMITS HIS REQUIRED FOR BORROW AREA (IF NEEDED). 13. CONTRACTOR TO ASSUME CLASS "B" BEDDING FOR SDR-26 PVC IN HIS BID PROPOSAL. CLASS "A" BEDDING WILL BE PAID FOR AS AN "EXTRA" SHOULD FIELD 4. ALL EROSION CONTROL FOR STOCKPILING OF DIRT SHALL COMPLY WITH SCDES STANDARDS. CONDITIONS REQUIRE THIS BEDDING. 5. SEDIMENT MUST BE REMOVED FROM SEDIMENT CONTROL DIKE WHEN SEDIMENT REACHES 50% OF THE SEDIMENT STORAGE VOLUME OR THE TOP OF THE 14. COUPLINGS SHALL BE EASTERN STANDARD SEWER REPAIR COUPLINGS AS MANUFACTURED BY MISSION RUBBER COMPANY, INC. CATALOG NO. 0408-807 CLEAN-OUT STAKE, WHICHEVER IS LESS. (8640) 0410-704 (0636), OR 0412-6250 (2636), OR AS MANUFACTURED BY FERNCO JOINT SEALER CO., FERNDALE, MICHIGAN, OR APPROVED EQUAL. 6. ALL SLOPES DRAINING OFF-SITE, (NOT THROUGH POND) TO BE GRASSED AND STABILIZED WITH EROSION CONTROL BLANKETS. 15. SANITARY SEWER SERVICES SHALL BE INSTALLED PER DETAILS. LOCATION OF SERVICE LINES SHALL BE MEASURED FROM MANHOLES AND FURNISHED WITH "AS-BUILT" DRAWINGS TO THE ENGINEER. EACH BUILDING SHALL HAVE (1) 6" OR 4" SERVICE LINE, AS SPECIFIED FOR ON THE DRAWINGS, BROUGHT TO WITHIN 5' OF THE BUILDING. SERVICE LINES SHALL BE INSTALLED AS REQUIRED ON PLANS. MINIMUM SLOPE AND CLEANOUT SPACING SHALL 1.04% FOR 6" AND 2.08% FOR 4" SERIES. 16. ALL WATER AND SEWER LINE BACKFILL SHALL BE COMPACTED TO 95% STD. PROCTOR BY CONTRACTOR. THE OWNER SHALL TEST COMPACTION. 17. THE OWNER SHALL PAY ALL SEWER TAP FEES TO THE LOCAL GOVERNING AUTHORITY. THE CONTRACTOR SHALL COORDINATE WITH LOCAL AUTHORITY ON SEWER TAPS. 18. THIS CONTRACTOR SHALL SHORE TRENCH EXCAVATION AND USE PIPE BOX TO COMPLY WITH ALL OSHA SAFETY REGULATIONS. IT IS THE CONTRACTORS SOLE RESPONSIBILITY TO PROVIDE JOB SITE SAFETY AND COMPLY WITH ALL SAFETY REQUIREMENTS. THE CONTRACTOR IS RESPONSIBLE FOR HIS MEANS AND METHODS OF CONSTRUCTION. 19. POLYVINYL CHLORIDE (PVC) 8" AND LARGER SHALL CONFORM TO ASTM D-3034, SDR-26, INSTALLED IN ACCORDANCE WITH ASTM D-2321. ELASTOMERIC JOINTS SHALL COMPLY WITH ASTM D-3212. SDR-26 SHALL BE INSTALLED IN CLASS "B" BEDDING AS DETAILED ON THE DRAWINGS. PVC SEWER 6" AND SMALLER SHALL CONFORM TO SCHEDULE 40. 20. DUCTILE IRON SHALL BE PRESSURE CLASS "350", CONFORMING TO AWWA C151, FURNISHED AND INSTALLED IN ACCORDANCE WITH THE SPECIFICATIONS. JOINTS IN DIP AT THE CREEK CROSSING SHALL BE RESTRAINED FROM MOVEMENT (LOK-TIGHT OR APPROVED EQUAL). 21. THE CONTRACTOR IS RESPONSIBLE FOR CONTACTING THE LOCAL SEWER AUTHORITY AND DETERMINING THE REQUIREMENTS AND PROCEDURES FOR OBTAINING THE AUTHORITY'S APPROVAL OF THE SEWER SYSTEM PRIOR TO SUBMITTING A PRICE TO THE OWNER. THE DETAILS AND SPECIFICATIONS OF THE LOCAL SEWER AUTHORITY SHALL GOVERN. 22. MANHOLE FRAME AND COVER SHALL BE MF-11 AND MC-18 RESPECTIVELY AS MANUFACTURED BY SUMTER MACHINERY COMPANY OR SEWER AUTHORITY APPROVED EQUAL. FRAME SHALL WEIGH 208 POUNDS AND COVER SHALL WEIGH 120 POUNDS. ALL SURFACES OF FRAME AND COVER SHALL BE BITUMINOUS COATED. 23. STEPS SHALL BE COPOLYMER POLYPROPYLENE PLASTIC, REINFORCED WITH 1/2" GRADE 60 REINFORCEMENT OR SEWER DISTRICT APPROVED (IF ALLOWED BY LOCAL AUTHORITY). 24. ALL SANITARY SEWER LINES SHALL BE AIR TESTED AND MUST CONFORM TO ASTM C828, LATEST REVISION. 25. ALL FLEXIBLE AND SEMI-RIGID PIPE SHALL BE TESTED BY PULLING A MANDREL, GO/NO GO, DEVICE BY HAND NO EARLIER THAN 30 DAYS AFTER THE TRENCHING HAS BEEN COMPLETELY BACKFILLED. THE MAXIMUM ALLOWABLE DEFLECTION SHALL NOT EXCEED 5 PERCENT OF NOMINAL INSIDE DIAMETER. 26. CONTRACTOR SHALL NOT TIE NEW SEWER LINE TO EXISTING MANHOLE UNTIL ALL CONSTRUCTION IS APPROVED, TESTED AND ACCEPTED BY THE LOCAL GOVERNING AUTHORITY. 27. A PRE-CONSTRUCTION CONFERENCE WITH THE CONTRACTOR, SEWER AUTHORITY, STATE HEALTH AUTHORITY, AND THE ENGINEER WILL BE HELD PRIOR TO SEWER LINE CONSTRUCTION. CONTRACTOR SHALL SET UP PRE-CONSTRUCTION CONFERENCE WITH CITY. 28. THE CONTRACTOR SHALL GRASS ALL RIGHT-OF-WAY IN ACCORDANCE WITH SPECIFICATIONS FOR GRASSING. 29. ALL SEWER LINE WORK SHALL BE "APPROVED" BY THE STATE HEALTH AND LOCAL AUTHORITY, AND "APPROVED" AS-BUILT DRAWINGS SHALL BE FURNISH TO THE OWNER BEFORE CONTRACTOR RECEIVES FINAL PAYMENT. 30. THE CONTRACTOR SHALL NOT PERFORM ANY WORK UNTIL HE HAS OBTAINED COPIES OF ALL NECESSARY ENCROACHMENT AND CONSTRUCTION PERMITS. | ABBREVIATIONS MORE OR LESS DIAMETER AASHTO AMERICAN ASSOCIATION OF STATE HIGHWAY TRANSPORTATION OFFICIALS Ac. ACRE ADA AMERICANS WITH DISABILITY ACT ANSI AMERICAN NATIONAL STANDARDS INSTITUTE ASTM AMERICAN SOCIETY OF TESTING AND MATERIALS AWWA AMERICAN WATER WORKS ASSOCIATION BM BENCHMARK BMP EROSION CONTROL BEST MANAGEMENT PRACTICES BOW BOTTOM OF WALL C&G CURB AND GUTTER CB CATCH BASIN CIP CAST IN PLACE CL CENTERLINE CY CUBIC YARD DBH DIAMETER BREAST HEIGHT DES DEPARTMENT OF ENVIRONMENTAL SERVICES DIP DUCTILE IRON PIPE E EAST E.G. EXAMPLE GIVEN EL ELEVATION ETC ETCETERA FDC FIRE DEPARTMENT CONNECTION FFE FINISHED FLOOR ELEVATION FHWA FEDERAL HIGHWAY ADMINISTRATION FIRM FLOOD INSURANCE RATE MAP FPE FINISHED PAD ELEVATION FT FEET (LENGTH) H HORIZONTAL HDPE HIGH-DENSITY POLYETHYLENE HP HIGH POINT IBC INTERNATIONAL BUILDING CODE IE INVERT ELEVATION INV INVERT LBS POUNDS LF LINEAR FEET (LENGTH) LP LOW POINT MAX MAXIMUM MIN MINIMUM MPCE MATCH PRE-CONSTRUCTION ELEVATION MS4s STORMWATER DISCHARGE FROM MUNICIPAL SEPARATE STORM SEWER SYSTEMS MUTCD MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES N NORTH NE NORTHEAST NO. NUMBER NSF NATIONAL SANITATION FOUNDATION NTS NOT TO SCALE NW NORTHWEST OC ON CENTER OSHA OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION PC PRECAST PVC POLYVINYLCHLORIDE R RADIUS RCP REINFORCED CONCRETE PIPE R/W RIGHT OF WAY PSF POUNDS PER SQUARE FOOT (PRESSURE) PSI POUNDS PER SQUARE INCH (PRESSURE) PSIG POUNDS PER SQUARE INCH GUAGE S SOUTH SCDES SOUTH CAROLINA DEPARTMENT OF ENVIRONMENTAL SERVICES SCDOT SOUTH CAROLINA DEPARTMENT OF TRANSPORATION SE SOUTHEAST SF SQUARE FEET STA STATION STD. STANDARD SW SOUTHWEST TC TOP OF CURB TP TOP OF PAVEMENT TOW TOP OF WALL TYP TYPICAL V VERTICAL VCP VITRIFIED CLAY PIPE W WEST WWF WELDED WIRE FABRIC THERE MAY BE ADDITIONAL ABBREVIATIONS USED IN THESE PLANS. PLEASE CONTACT ENGINEER IF ANY ABBREVIATION IS UNDEFINED OR UNCLEAR. | LEGEND EXISTING PROPOSED DESCRIPTION BENCHMARK INLET PROTECTION TYPE A INLET PROTECTION TYPE F INLET PROTECTION TYPE E SILTSACK INLET PROTECTION GUTTER EEL INLET PROTECTION ROCK CHECK DAM ROCK SEDIMENT DIKE ROCK OUTLET STABILIZATION CONCRETE WASHOUT or STORM DRAINAGE - MISCELLANEOUS STORM DRAINAGE - CATCH BASIN TYPE 16 STORM DRAINAGE - CATCH BASIN TYPE 9 STORM DRAINAGE - CURB INLET TYPE 1 STORM DRAINAGE - DROP INLET STORM DRAINAGE - JUNCTION BOX or SANITARY SEWER MANHOLE or SEWER CLEANOUT FIRE HYDRANT or WATER METER WATER VALVE REDUCER or LIGHT POLE IRON PIN SIGN UTILITY POLE ELECTRICAL BOX ELECTRICAL MANHOLE CABLE BOX TELEPHONE BOX TELEPHONE MANHOLE PARKING COUNT PARKING ISLAND FIRE DEPARTMENT CONNECTION POST INDICATOR VALVE TREE TREE - TO BE RELOCATED TREE - TO BE REMOVED LIMITS OF DISTURBANCE PROPERTY BOUNDARY ADJACENT/INTERNAL PROPERTY LINES BUFFER EASEMENT SETBACK WETLANDS CENTERLINE TURBIDITY BARRIER DB DIVERSION BERM DD DIVERSION DITCH XG G GAS HP HOSE PULL XOC OC OVERHEAD CABLE XOE OE OVERHEAD ELECTRIC XOT OT OVERHEAD TELEPHONE PD PERMANENT DIVERSION DITCH RD ROOF DRAIN RSF REINFORCED SILT FENCE XD SD STORM DRAINAGE XS SS SANITARY SEWER SF SILT FENCE SSD SUBSURFACE DRAIN TB TREE PROTECTION BARRICADE TD TEMPORARY DIVERSION DITCH TP TREE PROTECTION XC C UNDERGROUND COMMUNICATION XE E UNDERGROUND ELECTRIC XW W WATER FW FIRE SERVICE XX X FENCE WETLANDS UTILITY LINE, PIPE, OR CURB TO BE DEMOLISHED ENTITY TO BE DEMOLISHED ASPHALT PAVEMENT (LIGHT DUTY) ASPHALT PAVEMENT (HEAVY DUTY) CONCRETE PAVEMENT BRICK PAVEMENT OR HARDSCAPE GRAVEL PAVEMENT THERE MAY BE ADDITIONAL SYMBOLS USED IN THESE PLANS. PLEASE CONTACT ENGINEER IF ANY SYMBOL IS UNDEFINED OR UNCLEAR. |
|---|---|---|
| CDM | CDM | CDM | CDM | .VPPA | |||||
|---|---|---|---|---|---|---|---|---|---|
| -- | -- | -- | -- | NWARD | |||||
| LAVORPPA DNA WEIVER ROF DEUSSI | LAVORPPA DNA WEIVER ROF DEUSSI | LAVORPPA DNA WEIVER ROF DEUSSI | LAVORPPA DNA WEIVER ROF DEUSSI | NOITPIRCSED | |||||
| 6202/92/70 | 6202/42/80 | 6202/71/90 | 6202/22/90 | ETAD | |||||
| A | B | C | D | .VER | |||||
| GNITLUSNOC E G N I N R E I E N NGISED L I G C N E LANOISSEFORP | |||||||||
| NALP RETSAM POI | SETON LARENEG | ANILORAC EUNEVA HTUOS TS14 ,SMLAP 08 FO ELSI | |||||||
| PROJECT MANAGER | MDC | ||||||||
| DRAWN BY | AJ/JR | ||||||||
| PROJECT DATE | AUGUST 2022 | ||||||||
| JOB NUMBER | 22047 | ||||||||
| SHEET NUMBER | |||||||||
| G-3 |
See Also
RFB 2026-07 - Marina Parking Lot Improvements The City of Isle of Palms
City of Isle of Palms
Due by 9/25/2026
DESCRIPTION SOLICITATION # OPENING/CLOSING DATE AWARD STATEMENT New Dutch Fork Elementary School 2027-009
School District Five of Lexington and Richland Counties (District 5)
Due by 10/08/2026
Follow JB Charleston Multiple Award Construction Contract Active Contract Opportunity Notice ID FA441826R0009
DEPT OF DEFENSE
Due by 10/14/2026
Ad Title: Town of Central Community Park Building Restoration Project Purchasing Agent/Entity: Town
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Due by 10/13/2026