RFB for Transformers

Agency: Greenville Utilities
State: North Carolina
Type of Government: State & Local
NAICS Category:
  • 335311 - Power, Distribution, and Specialty Transformer Manufacturing
Posted Date: Jul 13, 2026
Due Date: Jul 21, 2026
Solicitation No: 26-48
Original Source: Please Login to View Page
Contact information: Please Login to View Page
Bid Documents: Please Login to View Page
Bid Number Title Due Date Other Files Tab Sheet
26-48 RFB for Transformers Tue, 07/21/2026 - 02:00pm -

Attachment Preview

ADVERTISEMENT FOR BIDS
Sealed proposals will be received in the Office of the Procurement Manager,
Greenville Utilities Commission, 401 S. Greene Street, Greenville, North Carolina 27834 until
2:00 PM (EDT) on July 21, 2026 and immediately thereafter publicly opened and read
for the furnishing of approximately:
25 - STK# 205010 TRANSFORMER, 15 KVA CSP 7200V
25 - STK# 205020 TRANSFORMER, 25 KVA CSP 7200V
Instructions for submitting bids and complete specifications will be available in the Office
of the Procurement Manager, Greenville Utilities Commission, 401 S. Greene Street, Greenville,
North Carolina during regular office hours, which are 8:30AM - 5:00PM Monday through Friday.
Greenville Utilities Commission reserves the right to reject any or all bids. Late bids will
not be considered.
1 of 29

SECTION I
GENERAL INSTRUCTIONS FOR FORMAL BIDS
RELATED TO THE PURCHASE OF APPARATUS, SUPPLIES,
MATERIALS, AND EQUIPMENT
JULY 21, 2026
1.0 NOTICE TO BIDDERS
Sealed bids, subject to the conditions made a part hereof, will be received in the Office of the
Procurement Manager, Greenville Utilities Commission, 401 S. Greene Street, Greenville, North
Carolina 27834 until 2:00 PM (EDT) on the day of opening. Bids submitted in a fax or e-mail
in response to this Invitation for Bids will not be acceptable. Late Bids will not be
considered.
2.0 STANDARD FORMS REQUIRED
Each bidder must submit a proposal on the enclosed bid forms. The bid must be signed by
an authorized official of the firm. Return only the attached Proposal Form. Do not return
the Advertisement for Bids, Instructions to Bidders or Specifications.
3.0 PREPARATION OF BID
Bids must be in sealed envelopes clearly marked on the outside with the name of the bid and
the bid opening date and time. Bid shall be addressed to PROCUREMENT MANAGER,
GREENVILLE UTILITIES COMMISSION, 401 S. GREENE STREET, GREENVILLE, NORTH
CAROLINA, 27834.
4.0 TIME FOR OPENING BIDS
Bids will be opened promptly and read at the hour and on the date set forth in the advertisement
in the Office of the Procurement Manager, Greenville Utilities Main Office, 401 S. Greene Street,
Greenville, North Carolina. Bidders or their authorized agents are invited to be present.
5.0 DEPOSIT
A deposit is NOT required for this bid.
6.0 NC SALES TAX
Do not include NC sales taxes in bid figure; however, Greenville Utilities Commission (GUC)
does pay sales tax. Sales tax should be added to the invoice as a separate item.
7.0 FEDERAL EXCISE TAX
GUC is exempt from Federal Excise Tax and will issue a Federal Exemption Certificate upon
request to the successful bidder.
2 of 29

8.0 EXCEPTIONS TO BE CLEARLY STATED
If bid is not in strict accordance with Section II, "Specifications," bidder must list or note all
exceptions on the Request for Proposal Form, otherwise, it is fully understood that the
successful bidder will furnish equipment and/or materials exactly as specified. GUC reserves
the right to accept or reject bids with noted minor deviations from specifications and to
determine the lowest responsible, responsive bid from the standpoint of quality, performance,
delivery, and price.
9.0 EVALUATION AND AWARD OF BIDS
GUC reserves the right to reject any and all bids, to waive any and all informalities, and to
disregard all nonconforming or conditional bids or counter proposals. In evaluating bids, GUC
shall consider whether the bids comply with the prescribed requirements, plus all alternates or
options requested. GUC reserves the right to include or exclude any option or alternative in
GUC's opinion is in GUC's best interests. If a bid is to be awarded, it will be awarded to the
lowest responsible, responsive bidder whose evaluation by GUC indicates that the award will be
in GUC's best interests. Only firm prices will be considered for award of this bid.
Award of transformer bids shall be primarily based upon the lowest estimated total ownership
cost (TOC) to the Commission using the following currently approved ElectriCities Transformer
Formula. If the total ownership cost difference between the apparent lowest cost unit and any
other units is less than 3%, then the Commission has the option to evaluate these units on
lowest initial cost and award on this basis, taking into account quoted delivery time. In addition
to the estimated TOC, quoted delivery time and past performance of the bidder and/or
manufacturer with respect to other bid awards shall be considered in evaluating and awarding
bids.
For transformers base rated less than 100 KVA, the following formula will be used:
TOC = Unit Cost + $7.80/watt x NL Loss + $2.10/watt x Load Loss
For transformers base rated 100 KVA or greater, the following formula will be used:
TOC = Unit Cost + $7.80/watt x NL Loss + $2.10/watt x Load Loss
NOTE: TOC is the Total Ownership Cost for 30 years.
Unit Cost is the base cost of the transformer.
NL Loss is the loss, in watts, at No Load for the transformer.
Load Loss is the Load Loss, in watts, excluding no load losses, but including
breaker losses and any other load related losses.
Bidder shall provide guaranteed average no load and load losses as defined
under the latest revision of ANSI Standard C57.
10.0 PROMPT PAYMENT DISCOUNTS
Bidders are urged to compute all discounts into the price offered. If a prompt payment discount
is offered, it may be considered in the award of the contract.
3 of 29

11.0 NUMERICAL ERRORS
In the case of a discrepancy between a unit price and the extension (the unit price multiplied by
the number of units), the unit price governs. In the case where numerical bids are stated both in
numbers and in words, the words govern.
12.0 BID WITHDRAWAL
A bidder must notify GUC in writing of its request to withdraw a bid within seventy-two (72)
hours after the bid opening, not including Saturdays, Sundays, or holidays. In order to justify
withdrawal, the bidder must demonstrate that a substantial error exists and that the bid was
submitted in good faith.
13.0 MINORITY BUSINESS PARTICIPATION PROGRAM
GUC has adopted an Affirmative Action and Minority and Women Business Enterprise Plan
(M/WBE) Program. Firms submitting a proposal are attesting that they also have taken
affirmative action to ensure equality of opportunity in all aspects of employment, and to utilize
M/WBE suppliers of materials and/or labor.
14.0 QUANTITIES
Quantities specified are only estimates of GUC's requirements. GUC reserves the right to
purchase more or less than the stated quantities at prices indicated in the submitted Proposal
Form based on our actual needs.
15.0 DELIVERY
Shipments will be made only upon releases from a purchase order issued by GUC in
accordance with GUC's current needs.
Time is of the essence with respect to all deliveries under this Agreement.
Delivery of all equipment, materials, or supplies shall be made Free on Board (FOB) GUC
Warehouse, 701 Utility Way, Greenville, North Carolina 27834, unless otherwise specified. The
agreed price for such equipment, materials, or supplies shall include all costs of delivery and
ownership, and risks of loss shall not be transferred from Provider to GUC until express written
acceptance of delivery and inspection by GUC. Delivery hours are between 8:00 AM and 4:30
PM Monday-Friday only. GUC's purchase order number is to be shown on the packing slip
or any related documents. GUC reserves the right to refuse or return any delivery with no
purchase order number or which is damaged. GUC will not be charged a restocking fee for any
delivery which is refused or returned.
16.0 DELIVERY TIME
Delivery time is to be stated by the bidder and will be a factor in the evaluation of bids. The
ability of a bidder to provide the item(s) to be purchased in twenty (20) weeks or less is essential
for GUC to meet its customer requirements.
4 of 29

17.0 MANUFACTURER
Bidder is to specify the manufacturer of transformers being quoted. If requested, bidder shall
identify the place of manufacture of all transformers quoted. The successful bidder, on or
before the time of shipment, shall furnish the Commission with the catalog number of the
transformers bid.
18.0 CONTACT INFORMATION
Questions regarding this bid request should be directed to Cleve Haddock, Lifetime CLGPO,
Procurement Manager at (252) 551-1533, haddocgc@guc.com. All questions regarding this
bid must be received by or before 5:00 pm (EDT) on July 9, 2026.
19.0 TERMS AND CONDITIONS
The attached Terms and Conditions must be considered by all vendors as part of the bid
proposal.
[Balance of page left blank intentionally]
5 of 29

SECTION II
GREENVILLE UTILITIES COMMISSION
TRANSFORMER SPECIFICATIONS
Description
15 KVA CSP Distribution Transformers, single phase 60 Hz, single bushing (cover mounted)
12470/7200 volt grounded wye primary to 120/240 volt secondary,95 KV BIL, 65 degreesC rise, no
taps. Units to be CSP type and protected with H.V. weak link, low voltage secondary breaker
with emergency overload switch, pressure relief device, red overload light and 10 KV direct
connected MOV type arrester with ground lead isolator. Tank to be finished in high quality light
gray paint complete with dual hangers and neutral grounding strap. (GUC STK# 205010)
25 KVA CSP Distribution Transformers - single phase 60 Hz, single bushing (cover
mounted) 12470/7200 volt grounded wye primary to 120/240 volt secondary, 95 KV BIL 65 degreesC
rise, no taps. Units to be CSP type and protected with H.V. weak link, low voltage secondary
breaker with emergency overload switch, pressure relief device, red overload light and 10 KV
direct connected MOV type arrester with ground lead isolator. Tank to be finished in high
quality light gray paint complete with dual hangers and neutral grounding strap. (GUC STK#
205020)
[Balance of page left blank intentionally]
6 of 29

NOTES:
Pole Mount Transformers
(1) Pole mount type distribution transformers, both conventional and CSP, should comply
with the following:
a. High voltage bushings shall be of porcelain with a threaded bolt type top ("A" thread
5/16"-18) with a wildlife connector cap consisting of a hood and handwheel of sturdy
molded glass filled polyester with an eyebolt capacity of 7/16". The hood and
handwheel to be standard gray and equipped with a "knockout" slot where lightning
arrester leads are required. The wildlife connector cap to be of a type equal to
Porcelain Products type (Part No. 65014). See attachment.
b. The cover finish should be of a BIL rated material to enhance resistance to wildlife
contacts.
c. Arresters approved for use on CSP transformers are as follows:
Cooper URT10050X1A1B1A
(2) Successful manufacturer shall certify each unit as non-PCB at time of manufacture and
delivery to Greenville Utilities, to be shown on the name plate.
(3) Only new transformers will be considered; rebuilt and/or remanufactured transformers
are not acceptable and will not be considered.
(4) Only firm prices will be considered for award of this bid.
All Padmount Transformers
(1) Padmounted transformers are to be marked with bilingual safety labels in accordance
with NEMA Standard 260-1996 and conform to enclosure security requirements per
ANSI C57 12.28-4
(2) Successful manufacturer shall certify each unit as non-PCB at time of manufacture and
delivery to Greenville Utilities, to be shown on the name plate.
(3) Only new transformers will be considered; rebuilt and/or remanufactured transformers
are not acceptable and will not be considered.
(4) Only firm prices will be considered for award of this bid.
7 of 29

Padmount Transformers 750 kVA and Larger
(1) Impedance values for the units listed shall not be less than 4.5%.
DELIVERY TIME: Delivery time is to be stated and will be considered in the evaluation of bids.
Failure by the successful bidder to meet quoted delivery shall be interpreted as non-compliance
with these specifications and may be deemed sufficient cause for removal of the manufacturer
and/or distributor from our lists as acceptable manufacturers or bidders.
MANUFACTURER: Bidder is to specify the manufacturer of transformers being quoted. If
requested, bidder shall identify the place of manufacture of all transformers quoted. The
successful bidder, on or before the time of shipment, shall furnish the Commission with the
catalog number of the transformers bid.
LOSS DATA: Bidder shall provide guaranteed average no-load and load losses as defined
under the latest version of ANSI Standard C57.12.90 unless otherwise specified.
No-load losses shall be provided at 85 degreesC. Use the following formula and instructions for
temperature correction to 85 degreesC:
P = P (T )[1+(T -85)K ]
85 c m m T
where,
P = the no-load losses corrected to 85 degreesC
85
P (T ) = no-load losses, corrected for waveform, at temperature T in degreesC
c m m
K = an empirically derived per unit change in no-load loss per degreesC
T
If the actual value of K is not available, a value of 0.00065 per unit change per degreesC
T
should be used. This value is typical for cores constructed of grain oriented silicon steel
and is satisfactory as a correction for no-load losses over the temperature range
normally encountered in transformer testing. The core material to be utilized and the K
T
used for temperature correction shall be identified on the proposal form.
Load losses shall be provided at 85 degreesC as described in ANSI Standard C57.12.90-1987,
Section 9.4, "Calculation of Impedance Voltage and Load Loss from Test Data." The
losses shall include all losses, excluding no-load losses.
The winding material for high voltage and low voltage shall be indicated on the proposal
form.
METHOD OF AWARD: Each item will be purchased individually.
Award of transformer bids shall generally be based upon the lowest estimated total ownership
cost (TOC) to the Commission using the following currently approved Electricities Transformer
Formula. If the total ownership cost difference between the apparent lowest cost unit and any
other units is less than 3%, then the Commission has the option to evaluate these units on
8 of 29

lowest initial cost and award on this basis. As deemed appropriate by the Commission, in
addition to estimated TOC, quoted delivery time and part performance of the bidder and/or
manufacturer with respect to other bid awards shall be considered in evaluating and awarding
bids.
For transformers base rated less than 100 KVA, the following formula will be used:
TOC = Unit Cost + $7.80/watt x NL Loss + $2.10/watt x Load Loss
For transformers base rated 100 KVA or greater, the following formula will be used:
TOC = Unit Cost + $7.80/watt x NL Loss + $2.10/watt x Load Loss
NOTE: TOC is the Total Ownership Cost for 30 years.
Unit Cost is the base cost of the transformer.
NL Loss is the loss, in watts, at No Load for the transformer.
Load Loss is the Load Loss, in watts, excluding no load losses, but including
breaker losses and any other load related losses.
Bidder shall provide guaranteed average no load and load losses as defined
under the latest revision of ANSI Standard C57.
CERTIFIED TEST RESULTS: For the purpose of this bid, the successful bidder must submit
certified test results for each transformer before shipment can be considered completed and
accepted by the Commission. Payments for any shipments will be withheld until certified test
results for all transformers associated with that shipment are supplied and accepted by the
Commission.
Certified test reports must be received by the Commission within five (5) working days of
receipt of transformers. Failure to provide test results in a timely manner shall be interpreted as
non-compliance with these specifications and may be deemed sufficient cause for removal of
the manufacturer and/or distributor from our bid lists as acceptable suppliers.
All transformers in this bid shall be designed, manufactured and tested in accordance with the
latest revisions of the applicable ANSI Standards. No transformer supplied shall exceed a
guaranteed maximum no-load and load losses of 10% of quoted average No Load Loss
and/or 6% of quoted average Total Load Loss, i.e., No Load + Load Loss. Individual
transformers exceeding this requirement will not be accepted and will be returned to the
manufacturer and/or distributor freight collect.
If either the certified test results or the Commission's own testing of transformers received
reveals values exceeding the quoted average losses, No Load Loss and/or Load Loss, the
Commission will exercise one of the two options listed below:
1. Return any transformers up to and including all of the shipment, C.O.D., to be replaced
by the bidder with transformers that meet the quoted losses in the bid, or
2. Invoice, or receive a credit memo from the bidder toward the purchase order issued for
9 of 29

the award, for liquidated damages based upon two (2) times the excess TOC for the
total order to be incurred by the Commission in accepting the transformers supplied by
the bidder, i.e.,
Liquidated Damages = 2 x (Delivered TOC - Quoted TOC)
No credit shall be applied toward delivery and acceptance of transformers of an order
with a delivered TOC below the quoted TOC.
Payment of all damages by the bidder will be in the form of cash settlement or credit
memo to be applied against the purchase order. Substitution of additional transformers
or credit toward future purchases will not be accepted by the Commission.
In addition, the Commission may, at its option, remove the manufacturer and/or distributor from
its approved manufacturer and/or bidder lists until all damages are paid and the Commission is
convinced that the manufacturer and/or bidder can meet all performance requirements and
other obligations prescribed by the Commission.
MISCELLANEOUS: Aside from compliance with transformer loss requirements, transformers
that are found to be damaged upon delivery or fails to otherwise meet all other bid specifications
and requirements will not be accepted by the Commission.
ACCEPTABLE TRANSFORMER MANUFACTURERS: The following transformer
manufacturers are considered acceptable for this bid:
Power Partners/ABB
Central Moloney
Cooper Power Systems
ERMCO
GE/Prolec
Howard Industries
Kuhlman Electric Company
CG Power Systems
VanTran Industries Inc.
JSHP Transformer
AR Transformers Inc.
Maddox Transformer
JST Power Transformers
Kllen Group America
Bidders desiring to quote non-accepted transformer manufacturers must first contact the
Director of Electric Systems for conditional approval by the Commission for each bid.
Conditional approval shall not constitute acceptance of the manufacturer by the
Commission nor a commitment to award all or any part of any current or future bids to
the bidder until accepted as an approved manufacturer and added to GUC's
specifications as an acceptable manufacturer. As deemed appropriate by the Commission,
additional conditions or requirements may be extended as a condition of any purchases or
awards.
10 of 29

This page summarizes the opportunity, including an overview and a preview of the attached documents.
* Disclaimer: This website provides information about bids, requests for proposals (RFPs), or requests for qualifications (RFQs) for convenience only and does not serve as an official public notice. Individuals who wish to respond to or inquire about bids, RFPs, or RFQs should contact the relevant government department directly.

Sign-up for a Free Trial, Government Bid Alerts

With Free Trial, you can:

You will have a full access to bids, website, and receive daily bid report via email and web.

Try One Week FREE Now

See Also

Bid Number Title Due Date Other Files Tab Sheet 26-50 RFB for Cable

Greenville Utilities

Bid Due: 8/20/2026

Bid Number Title Due Date Other Files Tab Sheet 26-54 RFB for Transformers

Greenville Utilities

Bid Due: 9/01/2026

Bid Number Title Due Date Other Files Tab Sheet 26-54 RFB for Transformers

Greenville Utilities

Bid Due: 9/01/2026

Bid Number Title Due Date Other Files Tab Sheet 26-54 RFB for Transformers

Greenville Utilities

Bid Due: 9/01/2026