RFB | F&W, South Omak Lake Wildlife Mitigation Area Fence (Project # 40713 & 686444)

Agency: The Confederated Tribes of the Colville Reservation
State: Washington
Type of Government: State & Local
NAICS Category:
  • 237990 - Other Heavy and Civil Engineering Construction
  • 238990 - All Other Specialty Trade Contractors
Posted Date: Apr 6, 2026
Due Date: Apr 20, 2026
Original Source: Please Login to View Page
Contact information: Please Login to View Page
Bid Documents: Please Login to View Page

RFB | F&W, South Omak Lake Wildlife Mitigation Area Fence (Project # 40713 & 686444) | Closing Date April 20, 2026 PDF

Attachment Preview

The Confederated Tribes of the Colville Reservation
P.O. Box 150, Nespelem, WA 99155 (509)634-2110
FAX: (509) 634-2101
Posted Date: April 6, 2026 Closing Date: April 20, 2026
REQUEST FOR BID
for
South Omak Lake Wildlife Mitigation Area Fence
(Project # 40713 & 686444)
_____________________________________________________________________________
Scope of Work: The Confederated Tribes of the Colville Reservation (CTCR) Fish & Wildlife
Program (F&W) is requesting individual bids for two (2) areas to replace and/or repair
approximately 8.675 miles of boundary fence. (Bid 1) 3.625 miles (19,150 ft.) and (Bid 2) 5.05
miles (26,575 ft.), with no slope adjustment included in these distances. The applicant will
utilize force account and/or contract for the construction and repairs to South Omak Lake
Wildlife Management Area fence to restore this fence back to its pre-disaster design, function
and capacity (in-kind) within the existing footprint. The fence is measured as per horizontal
distance and no slope correction has been included in the distances.
The contractor will need to:
-Replace and/or repair ALL four wires - Class 3, 12.5-gauge wire with top and bottom
(barbless) and two center wires (2-pt barbed).
-Replace ALL wooden line posts with metal t-posts (1.33 lb. and 6-feet tall).
-Wooden H-braces will need to be installed to required specifications.
All work will comply with the CTCR Pronghorn Friendly fencing specifications.
A detailed Scope of Work is attached as Exhibit B.
Location Description: The locations for the South Omak Lake WMA Fencing Contract is listed
as two (2) Sections to be bid upon individually.
(Bid 1) Segment 1.1: Repair & Replace. The coordinates start at GPS coordinate 48.23732, -
119.40217, then travels east 0.57 mile, north 0.25 mile, east 0.25 mile, south 0.25 mile,
and east 0.23 mile to the end point at 48.23732, -119.38832 adjacent to Columbia River
Road (1.55 miles). The segment lies in Township 32 North, Range 27 East, Section 25
and 26.
Segment 1.2: Repair & Replace. The coordinates start at GPS coordinate 48.19228, -
119.37398, then travels north 0.75 mile, west 0.25 mile, north 0.5 mile, and east 0.575
mile to the end point at 48.21178, 119.36703 adjacent to Columbia River Road (2.075
miles). The segment lies in Township 31 North, Range 27 East, Section 1 and 12.
(Bid 2) Segment 2.1: Repair & Replace. The coordinates start at GPS coordinate 48.12705, -
119.21997, then travels north 1.2 miles along east side of Columbia River Road, north
0.32 mile, east 0.25 mile, north 0.85, and east 1.55 miles along the south side of Omak
Lake Road (4.17 miles) to the end point at 48.14681, -119.19877. The segment lies in

Fencing Site Inspections: will arrange for an inspection of the construction site Tuesday,
April 14, 2026 AT 9 AM. Meeting location will be at the intersection of Columbia River Roa
and Cold Springs Road. Contractors must attend inspection on 4/14/2026 in order for thei
bid to qualify for submission.

Township 32 North, Range 27 East, Section 25 and 36; and Township 32 North, Range
28 East, Section 29 and 30.
Segment 2.2: Repair and Replacement. The coordinates start at GPS coordinate
48.64091, -119.26703, then travels north 1.475 miles to the end point at 48.73726, -
119.25041 (0.87 miles). The segment lies in Township 31 North, Range 28 East,
Section 3 and 10.
Fencing Site Inspections: will arrange for an inspection of the construction site Tuesday,
April 14, 2026 AT 9 AM. Meeting location will be at the intersection of Columbia River Road
and Cold Springs Road. Contractors must attend inspection on 4/14/2026 in order for their
bid to qualify for submission.
*Award of contract shall be made to the responsive bidder and must provide
all documentation listed below. This Request for Bid is open to all bidders.
To qualify for consideration all bid packets submitted must include the following documents:
- Exhibit "A" Bid Sheet (Total Contract Amount)
- Exhibit "E" Schedule of Completion (time and manpower required to complete the project)
- Copy of Blue Card - to qualify as an Indian preference contractor the business owner must
provide a copy of the individual's blue card.
- Copy of Title Ten Certification - to qualify as a Title Ten Certified contractor.
- Provide proof of Contractors Liability Insurance in the amount of at least $1,000,000.
- Solid Waste Disposal Plan (must be submitted on form from CTCR Planning/Solid Waste
Enforcement)
- Provide current Sam.gov registration.
- List of References (second page of Exhibit "A" or on a separate sheet) that demonstrates
that the contractor has successfully completed similar work.
If a contract is not entered into within a reasonable time after selecting the proposal, the Tribes
may elect to cancel the award or award the Contract to the next highest ranked Bidder. The
Tribes shall not be bound or in any way obligated until both parties have executed a contract. No
party may incur any chargeable costs prior to the execution of a final contract.
After opening and ranking, an award may be made on the basis of the proposals initially
submitted, without discussion, clarification or modification. The Tribes may discuss cost
reduction and other elements of the Bidder's proposal with the selected Bidder. If the Tribes
determines that it is unable to reach a contract satisfactory to the Tribes with the selected Bidder,
then the Tribes will terminate discussions with the selected Bidder and proceed to the next
Bidder in order of selection ranking until a contract is reached, the Tribes has rejected all

proposals, or the Tribes determines that it is in its interest to re-open the bid or temporarily or
permanently abandon the procurement.
The Tribes reserves the right to award a contract for all or any portion of the requirements
proposed by reason of this request, to award multiple Contracts, or to reject any and all proposals
if deemed to be in the best interests of the Tribes. The Tribes additionally reserves the right to re-
solicit for proposals or to reject any and all proposals if deemed to be in the best interests of the
Tribes, and to temporarily or permanently abandon the procurement.
For additional information concerning this Request for Bid, please contact Jessica Davin at (509)
634-2375 or Kelly Singer (509) 722-7086.
The Contractor will:
Prior to commencing work, the Contractor will know and understand the Exhibit "C" Map listed
for this contract. Contractor will need to inspect the entire fence from "Start Point" to "End
Point". Approximate length of fence is based on horizontal distance so contractor will need to
include slope and topography into their bid.
Exhibit "C" may not be a complete description of the work necessary to construct
the fence to specifications. The contractor should perform their own on the ground
inspection of the worksite before formulating their bid.
Prior to commencing work, the Contractor will know and understand the Exhibit "D"
Specifications (NRCS and/or CTCR F&W Pronghorn) listed for this contract.
No work shall take place until a TERO Compliance and Utilization Plan has been signed,
approved, and filed with the TERO Office. The contractor shall comply with all regulations and
provisions of the Tribal Employment Rights Ordinance (TERO).
Prior to commencing work, the Contractor will inform the Fish & Wildlife Program's COR when
beginning work, so a Start Work Order shall be issued.
The contractor shall comply with Tribal occupational safety and health regulations.
The contractor shall protect and avoid disturbing survey monuments and bearing trees.
Monuments and bearing trees disturbed or lost due to the contractor's action will be re-
established at the contractor's expense.
The contractor will install all range improvements in the location designated and will notify the
F&W COR if/when a deviation from the project plan is necessary PRIOR to construction.
Improvements that are to be repaired are not to be moved from their existing location without
PRIOR approval from the COR.
The contractor shall supply ALL materials, equipment, tools, transportation, supervision,
operating supplies, safety measures and labor to successfully complete the contract. All materials
and equipment must be hauled to the work site by the contractor.

Vehicles, ATV's or any other motorized equipment, will be operated responsibly to minimize
damage to the vegetation and soils.
Complete work to specifications provided, where applicable fencing specifications will also
include:
Clear a path for the fence as necessary that is free of debris including shrubs and trees
less than six (6) inches in diameter. Remove all snags with the potential to fall onto the
fence.
Clean up and remove all wire, T-posts, treated wooden posts, and/or other materials from
the project to a pre-approved site. The Okanogan County Landfill will accept fencing
materials, except treated wooden posts. Should the Contractor fail to perform clean up,
the cost of the removal and disposal shall be deducted from the final payment.
The contractor shall IMMEDIATELY suspend all project activities and notify the Tribal
Archaeology Department and/or Tribal Historic Preservation Office if ANY cultural find is
encountered. This includes but is NOT limited to arrow points, pottery, tools, bones and
the like. History & Archaeology Department phone number is 509-634-2691.
Contractor shall comply with Industrial Fire Precaution requirements as administered by Mt.
Tolman Fire Center. Failure to do so could result in the contractor being held liable for any fire
directly related to equipment operation or operator negligence.
The Program will:
Mark work sites by flagging or other means. (The fence is marked with Pink ribbon and the
DOUBLE Pink ribbon indicates start and end of fence).
Provide maps and necessary specifications for construction.
Provide a pre-construction tour of the project site.
Ensure that the Contractor has secured any and all necessary permits and documentation required
by the Colville Confederated Tribes for project implementation on the site.
The Program will maintain close communication with Mt. Tolman Fire Center, and the Tribal
History & Archaeology Department to ensure that all cultural and natural resource concerns are
adequately addressed and/or resolved.
The Program COR will arrange, at the contractor's request, to have a technical representative
present on site to offer technical assistance and answer questions concerning contract
specifications through the course of the project. Requests for technical assistance must be
scheduled in advance.

Conditions:
A pre-construction meeting will take place between the Contractor(s), COR, and any other
necessary agency personnel before work is to begin.
No start-up advances, capital or materials will be granted to the contractor for the project. Partial
payments for completed and approved work at the agreed upon contract amount will be paid to
the contractor periodically as agreed upon.
**No change orders will be granted for the project due to misjudgment or errors in initial
bid price.**
Start of Work:
Once the contract is awarded and approved the date for actual start of work will be coordinated
between the Contractor and the Contracting Officer Representative but work must be completed
by November 30, 2026.
Stop Work Orders:
Will be issued if any concerns arise during the duration of the contract such as,
changes in weather conditions, which may include but are not limited to erosion,
increased fire danger /shutting down the woods, too much snow on the ground, and/or
an inability to access the project site. The COR may adjust the contract length to
compensate for these situations.
Conditions for Default and Cancellations of Contract:
- Failure to meet completion date: The Colville Tribes may declare the contract
in default if the contractor fails to complete work by the specified completion
date. Requests for extension of time limits must be in writing from the
contractor and must be received by the Fish and Wildlife Program five (5) days
prior to specified completion date.
- Contract specifications not met: Work not performed according to the contract
specifications shall be grounds for default.
- Loss of eligibility for future contracts: If a contractor defaults on a contract,
he/she will not be eligible future F&W Program contracts for a period of one
year. His/her eligibility will be reconsidered upon application to the contracting
officer.
- Relationship to other contracts: If the contractor holds more than two Range
Program contracts and fails to meet the schedule outlined in the work plan
submitted, the COR may at his/her absolute discretion declare all contracts in
default.

Contractor Name:
Contractor Address:
Contractor License yes no License #
Do you claim Indian Preference? (Provide blue card copy in submitted bid) yes no
ARE YOU TITLE 10 CERTIFIED? Provide co of certification in submitted bid __________ yes ____________ no
WHAT TRIBE ARE YOU AFFILIATED WITH?
ENROLLMENT NUMBER
PHONE NUMBER
MESSAGE NUMBER

EXHIBIT A-1
REQUEST FOR BID
for
South Omak Lake WMA Fencing (Bid 1)
PROGRAM: Fish and Wildlife
CLOSING DATE: April 20, 2026
PROJECT DESCRIPTION: The CTCR F&W is requesting bids to repair and/or replace
approximately 3.625 miles (19,150 ft.) of fencing and gates to stock tight condition. Fence is
measured as per horizontal distance and is not adjusted for slope.
The contractor will need to:
-Repair and/or replace ALL four wires and the top and bottom wires will be barbless wire.
-Replace ALL wooden posts with metal t-posts.
-Wooden H-braces will need to be installed, as needed.
All work will comply with the CTCR Pronghorn Friendly fencing specifications.
A detailed Scope of Work is attached as Exhibit B.
Contractor Name:
Contractor Address:
Contractor License yes no
License #
Do you claim Indian Preference?
(Provide blue card copy in submitted bid) yes no
ARE YOU TITLE 10 CERTIFIED? __________ yes ____________ no
Provide co of certification in submitted bid
WHAT TRIBE ARE YOU AFFILIATED
WITH?
ENROLLMENT NUMBER
PHONE NUMBER
MESSAGE NUMBER
Total Contract Amount must include: Labor, Materials, Fuel, Transportation, etc.
I hereby submit my bid in the amounts of:
Total Contract Amount: $

1
2
3
4
5

References - Please list previous clients for which your business has completed similar contracts. A
minimum of three REQUIRED, five or more preferred.
NAME ADDRESS PHONE #
1
2
3
4
5
COMMENTS:
Signature of Proposed Bidder Date
Prospective Bidders: Please examine the included scope of work, specification attachments, and maps. In addition,
you should visit the sites described prior to bidding. Contact Jessica Davin of the Fish and Wildlife Program of
the Colville Confederated Tribes at (509)-634-2375 with any questions.
SUBMIT BIDS IN A SEALED ENVELOPE LABELED: Sealed Bid South Omak Lake WMA
Fencing Contract (Bid 1)
** Failure to properly label envelopes will result in rejection of bid
Sealed Bids for this project may be submitted in person or by mail to:
CTCR F&W Program
Attn: Jessica Davin
PO Box 150
Nespelem, WA 99155
BIDS WILL BE RECEIVED AT CTCR Fish & Wildlife PROGRAM, UNTIL 2:00 P.M. on
Monday, April 20, 2026.

Exhibit B-1
SCOPE of WORK (Bid 1)
The Colville Tribal Fish and Wildlife Department is requesting bids for South Omak Lake
Fencing Contract
Physical Conditions: The Colville Tribe is requesting bids for repair and/or replace
approximately 3.625 miles (19,150 ft.) of fencing and gates to stock tight condition. Fence is
measured as per horizontal distance and is not adjusted for slope.
The contractor will need to:
-Replace and/or repair ALL four wires and the top and bottom wires will be barbless wire.
-Replace ALL wooden posts with metal t-posts.
-Wooden H-braces will need to be installed.
All work will comply with the CTCR Pronghorn Friendly fencing specifications.
Obstruction Removal: Roll up all barbed wire, remove all clips, and burnt wooden posts that
will be replaced. Metal posts suitable for re-use may be used in the reconstruction of the fence.
All other materials are to be disposed of as specified in the contract disposal plan. Should the
Contractor fail to perform clean up. the cost of the removal and disposal shall be deducted from
the final payment.
Fencing: The fence will consist of 4 strands of barbed and barbless (top and bottom wires) 12.5
(Class 3) gauge wire, with metal t-posts (1.33 lbs. 6 ft.) installed every 16 feet. Reinforce fence
by constructing H-braces where needed by using 2 (5-inch diameter, 7-8 feet long) posts and 1
rail (4inch diameter, 8 feet long); reinforce H - brace with double wrap wires installed
diagonally around the posts and tightened by twisting. H-braces should be installed at corners,
gates, slope breaks and/or every 1/4 mile.
Wire Gate Requirement: Gates require an H - brace on each side of the opening. Attach 4
strands of 12.5 gauge barbed wire to the H-brace on one side of the opening, extend wire across
gate opening and attach it to a wooden gate post (3-inch diameter, 4 feet long), and install 3
evenly spaced wooden stays or metal stays to the center portion of the gate. Gate opening should
be approximately 17 ft. wide, but some cases will vary. Attach wire loops to the wooden post, top
and bottom, that will allow the gate to be secured in the closed position.
4-post H Brace: Whenever fences make a tum of 20-60 degrees a 4-post H-brace is required. This
involves constructing 2 H-braces end to end that form the angle necessary to make the turn.
Install 2 (5-inch diameter, 7-8 feet long) posts and 1 rail (4inch diameter, 8 feet long); reinforce
H-brace with double wrap wires installed diagonally around the posts and tightened by twisting.
Install another H-brace at correct angle approximately 1-2 ft. apart. String wire to close the gap
between the 2 H-braces.

Fencing specifications will also include: Clear a path for the fence as necessary that is free of
debris including shrubs and trees less than six (6) inches in diameter. Remove all snags with the
potential to fall onto the fence.
All fence construction will conform to Washington State - NRCS specifications for standard,
four wire, barbed wire livestock fencing, utilizing metal T-posts and wooden H -braces. If the
fence will be tying into a cattle guard, then an H-Brace must be put in place. All fenced gates
must be reinstalled in their proper location. Hang-mans will be put in place if needed. All basic
fencing materials, labor, and equipment will be furnished by the Contractor.
Construction Sites: Please review the attached maps showing the construction locations.

Contractor Name:
Contractor Address:
Contractor License yes no License #
Do you claim Indian Preference? (Provide blue card copy in submitted bid) yes no
ARE YOU TITLE 10 CERTIFIED? Provide co of certification in submitted bid __________ yes ____________ no
WHAT TRIBE ARE YOU AFFILIATED WITH?
ENROLLMENT NUMBER
PHONE NUMBER
MESSAGE NUMBER

EXHIBIT A-2
REQUEST FOR BID
for
South Omak Lake WMA Fencing (Bid 2)
PROGRAM: Fish and Wildlife
CLOSING DATE: April 20, 2026
PROJECT DESCRIPTION: The CTCR F&W is requesting bids to repair and/or replace
approximately 5.05 miles (26,575 ft.) of fencing and gates to stock tight condition. Fence is
measured as per horizontal distance and is not adjusted for slope.
The contractor will need to:
-Repair and/or replace ALL four wires and the top and bottom wires will be barbless wire.
-Replace ALL wooden posts with metal t-posts.
-Wooden H-braces will need to be installed, as needed.
All work will comply with the CTCR Pronghorn Friendly fencing specifications.
A detailed Scope of Work is attached as Exhibit B.
Contractor Name:
Contractor Address:
Contractor License yes no
License #
Do you claim Indian Preference?
(Provide blue card copy in submitted bid) yes no
ARE YOU TITLE 10 CERTIFIED? __________ yes ____________ no
Provide co of certification in submitted bid
WHAT TRIBE ARE YOU AFFILIATED
WITH?
ENROLLMENT NUMBER
PHONE NUMBER
MESSAGE NUMBER
Total Contract Amount must include: Labor, Materials, Fuel, Transportation, etc.
I hereby submit my bid in the amounts of:
Total Contract Amount: $

This page summarizes the opportunity, including an overview and a preview of the attached documents.
* Disclaimer: This website provides information about bids, requests for proposals (RFPs), or requests for qualifications (RFQs) for convenience only and does not serve as an official public notice. Individuals who wish to respond to or inquire about bids, RFPs, or RFQs should contact the relevant government department directly.

Sign-up for a Free Trial, Government Bid Alerts

With Free Trial, you can:

You will have a full access to bids, website, and receive daily bid report via email and web.

Try One Week FREE Now

See Also

Sam Chastain Trial Project - Request for Qualifications are due by Monday, August

City of Renton

Bid Due: 8/10/2026

Solicitation Close Date: 08/27/26 Title: Lower Snake River Dams Replacement Energy and Grid

State Government of Washington

Bid Due: 8/27/2026

PACIFIC COMMUNITY PARK PLAYGROUND FALL SURFACING PROJECT Bid Number: 2838 General Information: The

Clark County

Bid Due: 8/04/2026

Solicitation Close Date: 07/30/26 Title: CBC - Potable Water Line Replacement Ref #:2026-173

State Government of Washington

Bid Due: 7/30/2026