Request For Quotes Sanitary Sewer Repair at 805 S. Lake Street
| Agency: | Gary Sanitary District |
|---|---|
| State: | Indiana |
| Type of Government: | State & Local |
| NAICS Category: |
|
| Posted Date: | Sep 30, 2026 |
| Due Date: | Oct 15, 2026 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
Project ID:
Title: Request For Quotes Sanitary Sewer Repair at 805 S. Lake Street
Addenda: 0
Release Date: 9/30/2026
Due Date: 10/15/2026
Post Information
Sealed Bid Process:Yes (Bids Sealed / Pricing Sealed)
Private Bid:No
Summary
Furnish all labor, materials, tools, equipment, superintendence, and all necessary incidentals for the repair of sanitary sewer pipe.
Manhole No. 567 Sewer Invert Depth is ± 13.6 ft
Manhole No. 568 Sewer Invert Depth is ± 15.3 ft
Manhole No. 570 Sewer Invert Depth is ± 11.1 ft
- Remove and replace existing 36-inch diameter pipe with 36-inch diameter PVC SDR 35 ± 46-linear feet from Manhole No. 567 going towards Manhole No. 568.
- Remove and replace existing 36-inch diameter pipe with 36-inch diameter PVC SDR 35 ± 57-linear feet starting 31 feet from Manhole No. 568 going towards Manhole No. 567.
- Remove and replace existing 36-inch diameter pipe with 36-inch diameter PVC SDR 35 ± 32-linear feet starting 93 feet from Manhole No. 568 going towards Manhole No. 570.
- Remove and replace existing 36-inch diameter pipe with 36-inch diameter PVC SDR 35 ± 33-linear feet starting 166 feet from Manhole No. 568 going towards Manhole No. 570.
Background
- Remove and replace existing 36-inch diameter pipe with 36-inch diameter PVC SDR 35 ± 46-linear feet from Manhole No. 567 going towards Manhole No. 568.
- Remove and replace existing 36-inch diameter pipe with 36-inch diameter PVC SDR 35 ± 57-linear feet starting 31 feet from Manhole No. 568 going towards Manhole No. 567.
- Remove and replace existing 36-inch diameter pipe with 36-inch diameter PVC SDR 35 ± 32-linear feet starting 93 feet from Manhole No. 568 going towards Manhole No. 570.
- Remove and replace existing 36-inch diameter pipe with 36-inch diameter PVC SDR 35 ± 33-linear feet starting 166 feet from Manhole No. 568 going towards Manhole No. 570.
- Contractor shall ensure pipe penetrations are sealed and watertight.
- Contractor shall connect new pipe to existing good pipe with a watertight connection. Connect new pipe to existing PVC pipe with neoprene rubber coupling with stainless steel straps or coupling provided by the manufacturer and approved by the owner. When adjoining new pipe to existing, the maximum space between the abutting pipes shall be 1/8 inches or less. Any further space between pipes shall not be acceptable.
- Submit pictures or request an inspection of rubber coupling and manhole connections before
and after installation to the Gary Sanitary District for verification.
Timeline
See Also
77441 - 2026 Sewer Rehabilitation #2 (Large Diameter) Quest Number: 10410060 Closing Date:
City of Fort Wayne
Due by 11/19/2026
project name company name pre-bid date bid date bids in SE878A Grove Lodge
Indiana University
Due by 12/03/2026
Bid Title: 2027 Pavement Markings Category: County Highway Dept. Status: Open Description: The
Hancock County
Due by 12/15/2026
Follow Vertical Construction MATOC Active Contract Opportunity Notice ID W9127826RA089 Related Notice Department/Ind.
DEPT OF DEFENSE