Request for Qualifications (RFQ) forFlightline Boulevard Rehabilitation,#26-20-1878

Agency: Spokane International Airport
State: Washington
Type of Government: State & Local
NAICS Category:
  • 541330 - Engineering Services
  • 541611 - Administrative Management and General Management Consulting Services
  • 541690 - Other Scientific and Technical Consulting Services
Posted Date: Feb 14, 2026
Due Date: Mar 3, 2026
Original Source: Please Login to View Page
Contact information: Please Login to View Page
Bid Documents: Please Login to View Page

2/15/2026

Request for Qualifications (RFQ) for Flightline Boulevard Rehabilitation, #26-20-1878

RFQ Document

Attachment Preview

REQUEST FOR QUALIFICATIONS
Professional Engineering Services
FLIGHTLINE BOULEVARD REHABILITATION, #26-20-1878
Issue Date: February 15, 2026
Response due: March 3, 2026 at 2:00 PM
The Spokane Airport Board (the “Board”) is requesting Statements of Qualifications (SOQ) from
qualified consulting firms or teams of firms for engineering, design, and construction
management/administration services for Flightline Boulevard Rehabilitation at Spokane
International Airport (SIA).
A. SCOPE OF WORK
Preliminary Site Investigation & Data Collection:
o Conduct site visits to assess current pavement distresses and drainage issues.
o Perform topographic surveys to establish elevations, centerlines, and right-of-way
lines.
o Gather traffic data (volume and axle loads) and conduct geotechnical testing (soil
subgrade, existing pavement thickness).
Engineering Design & Analysis:
o Develop rehabilitation strategies (e.g., milling, resurfacing, reconstruction) based on
pavement structural analysis.
o Select appropriate materials
o Design improvements for drainage, curb/gutter, and safety, such as widening or
slope adjustment.
o Prepare detailed construction plans, specifications, and profiles.
Project Management & Documentation:
o Provide, maintain, and review detailed cost estimates for rehabilitation, materials,
and construction.
o Prepare bid-ready construction documents, technical specifications, and
construction phasing plans.
o Coordinate with local authorities, stakeholders, and regulatory agencies.
Construction Support Services:
o Assist in bid analysis and contractor selection.
o Provide construction-phase services, such as reviewing contractor submittals and
inspecting for compliance
Funding: Grant and/or Federal funds will not be used for the work under this RFP.
Planned Project Schedule: This project is planned for solicitation in July 2026 and be
presented to our board in August 2026.
Page 1 of 4
Flightline Boulevard Rehabilitation, #26-20-1878
B. INFORMATIONAL MEETING
A non-mandatory informational virtual meeting is scheduled for 10:00 a.m. on Friday, February
20, 2026
Join Teams Meeting Link
https://teams.microsoft.com/meet/26930516776720?p=cdp5dvZTVCHBApKoQD
Meeting ID: 269 305 167 767 20 Passcode: NU23HZ9i
Dial in by phone: 1-929-229-5351 Phone conference ID: 450 366 204#
C. SUBMITTAL REQUIREMENTS
Please submit one (1) electronic copy, in searchable Adobe PDF format.
email to: Margaret Merin, mmerin@spokaneairports.net
subject line RFQ: Flightline Boulevard Rehabilitation, #26-20-1878
Upon receipt of the electronic submission, a receipt email will be issued confirming your
submission.
Proposals delivered by hand, fax, or telephone or any postal carrier will not be accepted.
Electronic submittal shall be limited to the requirements specified in the SOQ section D, and
shall not include additional brochures, booklets or other sales materials that are not
specifically requested.
1. Clarifications
Any questions or request for clarification must be received via email no later than:
February 24, 2026 and shall be directed to:
Margaret Merin, mmerin@spokaneairports.net
Subject line RFQ: Flightline Boulevard Rehabilitation, RFQ# 26-20-1878
Information, clarifications or modifications will be provided in writing by the Airport and
will be communicated no later than February 25, 2026 via the Airport’s website at:
http://business.spokaneairports.net/rfp.
2. Related Information
Firms are advised to familiarize themselves with the Airport’s standard Professional
Service Agreement (PSA) and are prepared to accept without modification the terms and
conditions contained therein. The selected consultant will be expected to execute the
Airport’s PSA. It is anticipated that a PSA will be awarded by the Board at its August 2026
meeting.
This Request for Qualifications (RFQ) and information regarding this RFQ are posted on
the Spokane Airports website.
D. STATEMENT OF QUALIFICATIONS (SOQ)
SOQs shall respond to the criteria listed below. SOQs should be clear and concise and
formatted as outlined below to provide the Selection Committee with the following information
and allow for consistent evaluation of each submittal.
Page 2 of 4
Flightline Boulevard Rehabilitation, #26-20-1878
Transmittal Letter
Provide a one-page transmittal letter which introduces the consulting firm and team.
Discuss services offered, size of staff, and office location(s) of the consulting firm(s). Include
the point of contact information, including email and phone number of the firm responding
to the RFQ.
Table of Contents
Include an identification of the material by section and page number.
Statement of Qualifications
Provide no more than 15 double-sided pages describing the qualifications, experience, and
capabilities of the proposing firm and team in the order presented below. The transmittal
letter, and table of contents will not be included in the page count.
1. Project Organization and Staff Experience. Include the organizational structure that is
proposed to implement the Project, identifying the primary point of contact, support
staff, subconsultants, and location of office where most of the work of the prime
consultant will be completed. Include brief resumes of the key project personnel
identifying professional qualifications, experience, capabilities, and relevant projects
each have completed.
2. Specific Relevant Projects. Include and describe projects of similar scope that the
proposed key personnel and/or team have participated in and completed in the past five
(5) years. Identify key personnel from the organizational chart.
3. Project Understanding and Approach. Demonstrate an understanding and familiarity of
this Project. Describe your approach to successfully completing the project, including
project administration, planning and design considerations, and construction
management and construction administration.
4. References. Provide a list of three (3) references that have specific knowledge of relevant
work performed by the consultant.
E. SOQ EVALUATION AND SELECTION
All SOQs received will be evaluated and ranked based upon the responsiveness to the RFQ. A
minimum of two (2) firms may be selected for further evaluation and requested to participate in
an interview as part of the selection process. Alternatively, the Airport may choose to select the
most qualified firm or team directly following the evaluation of the submitted SOQs. One
consultant will be selected for negotiation of a PSA.
The Board reserves the right to reject any and all SOQs, to waive any irregularities in the SOQs
received, and to accept the SOQs deemed most advantageous to the best interest of the Board.
All SOQs become the property of the Airport.
Spokane International Airport is an Equal Opportunity Employer and federal contractor or
subcontractor. As such, the Airport and all tiers of its consultants will abide by the requirements
of 41 CFR 60-1.4(a), 41 CFR 60-300.5(a), 41 CFR 60-741.5(a) and Executive Order 13496 (29 CFR
Part 471, Appendix A to Subpart A).
Page 3 of 4
Flightline Boulevard Rehabilitation, #26-20-1878
F. SCOPE OF WORK AND FEE PROPOSAL
Following the selection process, the Airport will enter into contract negotiations with the
selected consultant. The Airport and consultant will meet to discuss the proposed services and
scoping of work. The selected consultant will be expected to prepare and submit a detailed
breakdown proposal identifying hourly rates, markups, anticipated reimbursable expenses,
direct salary costs, labor, general and administrative overhead, and profit data for the project.
Work will be performed on a negotiated lump sum amount, based on the specific identified
tasks of the Scope of Work associated with design services. Construction management and
construction administration services may be amended to the PSA and will be performed on a
negotiated not-to-exceed amount, based on time and materials (specific rates of
compensation). Negotiations and an independent cost analysis will be performed prior to
approval and execution of the PSA. If scope and fee cannot be agreed upon between the Airport
and the consultant, negotiations will be terminated. The Airport will then enter into negotiations
with the next highest qualified consultant.
G. PUBLIC RECORDS AND DISCLOSURE OF SOQs
3. Property of Board: SOQs submitted to the Board shall become the property of the Board
and shall not be returned to the consultant.
4. SOQs are Public Records: Pursuant to Chapter 42.56 RCW, SOQs submitted to the
Board shall be considered public records and with limited exceptions will be available
for inspection and copying by the public. Except to the extent protected by state and/or
federal laws, SOQs shall be considered public documents and available for review and
copying by the public after the award of an Agreement is made by the Board.
5. Process for Disclosing Information: If a request is made for disclosure of all or any
portion of a SOQ, the Board will determine whether the material should be made
available under the law. If the Board determines that the material is not exempt and may
be disclosed, the Board will notify the consultant of the request and allow the consultant
five (5) business days to take appropriate action pursuant to RCW 42.56.540. If the
consultant fails or neglects to take such action within said period, the Board may release
the portions of the SOQ deemed subject to disclosure.
6. Indemnification: To the extent that the Board withholds from disclosure all or any portion
of consultant’s documents at a consultant’s request, such consultant agrees to fully
indemnify, defend and hold harmless the Board, the City and County of Spokane, their
elected officials, agents and employees, from all damages, penalties, attorneys’ fees
and costs related to withholding information from public disclosure.
7. No Claim Against Airport: By submitting a SOQ, the consultant consents to the process
outlined in this RFQ and shall have no claim against the Board because of actions taken.
Page 4 of 4
This page summarizes the opportunity, including an overview and a preview of the attached documents.
* Disclaimer: This website provides information about bids, requests for proposals (RFPs), or requests for qualifications (RFQs) for convenience only and does not serve as an official public notice. Individuals who wish to respond to or inquire about bids, RFPs, or RFQs should contact the relevant government department directly.

Sign-up for a Free Trial, Government Bid Alerts

With Free Trial, you can:

You will have a full access to bids, website, and receive daily bid report via email and web.

Try One Week FREE Now

See Also

On-Call Architectural and Engineering Services Solicitation # 6186 Category Consulting and professional services

Seattle Housing Authority

Bid Due: 6/11/2026

Bid Title: RFP New Wastewater Treatment Plant Design Category: Tribal Employment Rights Ordinance

Quinault Indian Nation

Bid Due: 7/03/2026

Project ID: CTY-CR-2025-06 Title: CITYWIDE CONSULTANT ROSTER: Engineering, Surveying, and Design Consulting Addenda:

City of Seattle

Bid Due: 12/30/2030

2026 Courthouse Roof Membrane Bid/RFP Status Open - accepting bids and proposals Bid/RFP

County of Pend Oreille

Bid Due: 6/09/2026