Request for Qualifications/Proposal PCH Wastewater Project

Agency: City of Mailbu
State: California
Type of Government: State & Local
NAICS Category:
  • 236220 - Commercial and Institutional Building Construction
  • 237110 - Water and Sewer Line and Related Structures Construction
  • 541330 - Engineering Services
  • 541690 - Other Scientific and Technical Consulting Services
Posted Date: Mar 24, 2026
Due Date: Apr 23, 2026
Original Source: Please Login to View Page
Contact information: Please Login to View Page
Bid Documents: Please Login to View Page
Bid Title: Request for Qualifications/Proposal PCH Wastewater Project
Category: Professional Consulting
Status: Open
Description:

The City of Malibu, California is requesting proposals from qualified firms to provide Professional Engineering Services for the design of the Pacific Coast Highway (PCH) Wastewater Project including Surveying, Geotechnical, Public Engagement, Subsurface Investigations, and Video Inspections for the new wastewater collection system connecting to the Los Angeles Sanitation & Environment (LASAN) Hyperion Water Reclamation Plant (Hyperion).

These services shall encompass and include all work, services, materials and equipment necessary to prepare and deliver Engineering services as described within this proposal.  All engineering work shall be in compliance with the City’s Local Coastal Plan (LCP) and Municipal Code, California Vehicle Code, Building Safety Codes, and other applicable regulations and standards.  All engineering services shall be conducted under the direction of a Registered Civil Engineer licensed in the State of California.

Project Background and Description

In January 2025, the City of Malibu (City) and surrounding areas were significantly impacted by the Palisades Fire which began in Santa Monica Mountains. The fires caused severe damage and destruction to residential and commercial properties, particularly areas near Sunset Mesa and in eastern Malibu.  On January 12, 2025, Governor Gavin Newsom signed an Executive Order N-1-26 to help communities rebuild faster and more affordably.  The Executive Order suspended permitting and review requirements under the California Environmental Quality Act (CEQA) and the California Coastal Act for the Palisades rebuilds.

As the recovery efforts commenced, the City contracted Woodard & Curran to evaluate the feasibility of construction of the new wastewater collection system on PCH connecting to Hyperion. The system would serve the waterfront properties along PCH within the areas of the City affected by the Palisades Fire. The new sewer collection system would replace the existing onsite wastewater disposal systems (OWDS) for these properties, which consist primarily of septic tanks and leach fields, and require seawalls for protection. Woodard & Curran completed the City of Malibu Wastewater Collection System on PCH to LASAN Connection Preliminary Design Report on February 9, 2026. The Report, which is provided as Attachment C, evaluated the required sewer collection system facilities on PCH to serve the affected properties and provides an overview of the Project implementation cost and schedule and included the following:

  • Estimated the sewershed flows based on the parcels to be connected to the new sewer collection system within the Project area.
  • Determined the size and preliminary locations of gravity sewers, lift stations, and force mains required to connect the parcels and convey sewage to the LASAN wastewater collection system.
  • Identified significant crossings for the sewer system along PCH and evaluated constructability.
  • Provided a preliminary capital cost estimate for the Project.
  • Provided a preliminary Project implementation schedule.
Publication Date/Time:
3/23/2026 6:00 PM
Closing Date/Time:
4/23/2026 4:00 PM
Submittal Information:
Electronic file to be submitted - mpublicworks@malibucity.org
Contact Person:
Tatiana Holden, Interim Public Works Director at 310-465-2489, ext. 338 or THolden@malibucity.org
Download Available:
Yes
Fee:
N/A
Plan & Spec Available:
None.
Special Requirements:
Electronical Technical Qualifications/Proposals shall be submitted by email to MPublicWorks@MalibuCity.org.
Miscellaneous:
All questions regarding the Request for Qualifications/Proposals (RFQ/P) must be submitted in writing to Tatiana Holden, Interim Public Works Director, at THolden@malibucity.org
Related Documents:
* Disclaimer: This website provides information about bids, requests for proposals (RFPs), or requests for qualifications (RFQs) for convenience only and does not serve as an official public notice. Individuals who wish to respond to or inquire about bids, RFPs, or RFQs should contact the relevant government department directly.

Sign-up for a Free Trial, Government Bid Alerts

With Free Trial, you can:

You will have a full access to bids, website, and receive daily bid report via email and web.

Try One Week FREE Now

See Also

Bid Number: 26-101 Bid Title: 26-101 Bidwell Park & Community Center Renovation_2-113-01/CAP18006 Category:

Hayward Area Recreation and Park District

Bid Due: 7/16/2026

RFP 25-26-14 Engineering Design Services for the Air Conditioning and Boiler Replacement Project

City of Visalia

Bid Due: 7/16/2026

Bid Solicitation # ANE223-ANE2C-6392 Bid Solicitation # ANE223-ANE2C-6392 Organization Name Architecture and Engineering

San Bernardino County

Bid Due: 7/01/2026

RFP - On-Call Geotechnical Services during Construction The Marin Municipal Water District (District)

Marin Water

Bid Due: 6/26/2026