Request For Qualifications: East Morris Corridor Improvements Project

Agency: City of Dalton
State: Georgia
Type of Government: State & Local
NAICS Category:
  • 236220 - Commercial and Institutional Building Construction
  • 541330 - Engineering Services
  • 541611 - Administrative Management and General Management Consulting Services
Posted Date: May 27, 2026
Due Date: Jul 10, 2026
Original Source: Please Login to View Page
Contact information: Please Login to View Page
Bid Documents: Please Login to View Page
Bid Title: Request For Qualifications: East Morris Corridor Improvements Project
Category: Bid & RFP Notification
Status: Open
Description:

Request for Qualifications for Engineering Services – E Morris St Corridor Improvements

The City of Dalton has issued a Request for Qualifications (RFQ) to obtain qualifications packet & design proposal from a qualified engineering & design firm, to design a 1.92 mile corridor improvements project along E Morris Street from Green St. to Walnut Avenue. The firm shall prepare a highly detailed proposal based upon the conditions and requirements specified within the request for qualifications packet which can be obtained through the City’s website at https://www.daltonga.gov/rfps. Qualifications & proposal packets shall be submitted by close of business on Friday, July 10, 2026 as described in the RFQ packet. The RFQ documents are open to public inspection at the City of Dalton Public Works Department located at 535 Elm Street, Dalton, Georgia 30721. Public Works may be contacted at (706) 278-7077 or by mail at P.O. Box 1205, Dalton, Georgia 30722. Questions shall be addressed to Jackson Sheppard, by phone at 706-278-7077 or by email For security reasons, you must enable JavaScript to view this E-mail address. .

Publication Date/Time:
5/27/2026 3:00 PM
Closing Date/Time:
7/10/2026 5:00 PM
Related Documents:

Attachment Preview

East Morris Street Corridor Improvements
RFQ Released: 05/27/2026
City of Dalton Public Works Department
RFQ East Morris St. Corridor Improvements
General: The City of Dalton is seeking the services of a qualified engineering
consultant to perform analysis and design for sidewalk connectivity and transportation
infrastructure improvements on East Morris Street located within the City of Dalton.
Responding firms shall have a strong record providing design services to local
governments in Georgia and experience in working on Federally Assisted Projects. The
City of Dalton will select a design engineer from the respondents to this request using
the selection criteria provided within this request for qualifications packet.
Proposal Scope Statement: The proposed project spans approximately 1.92 miles
along E. Morris Street from Green Street to Walnut Avenue. The project scope is for
providing engineering design, analysis, recommendations, and professional services
otherwise noted for the elements enumerated within this packet. Based on the
direction provided by the Public Works Department as the project progresses, the
consultant should be expected to prioritize value engineered considerations to
maximize returns on investment of taxpayer funds while meeting objectives specified
within the RFQ packet. The final designed hardscape improvement’s theme and
mobility accommodations are intended to reflect continuity of corridor improvements
recently completed by the City on East Morris Street from Glenwood Avenue to Green
Street.
Submission Deadline: The Department requests submissions be provided by Friday,
July 10th, 2026. Submissions are requested to be provided to the Public Works
Department Project Manager Jackson Sheppard via email at jsheppard@daltonga.gov,
or by mail addressed “ATTN: Public Works Jackson Sheppard” to PO Box 1205 Dalton,
GA 30722. Open lines of communication will be maintained for any specific inquiries
through the requested submission date.
Program Delivery: The engineering firm will work closely with the Public Works
Department throughout the life of the project. The engineering firm shall provide cost
provisions for field visits with City staff and community stakeholders throughout the
course of the project. Consultant shall provide incremental design iteration milestones
(30%, 60%, 90%, IFP/IFC). The engineering firm may propose different design
milestones at their discretion. Through issuance for construction, the awarded firm
shall accompany each design iteration with a technical memorandum noting any
changes from previous iterations, and pertinent explanations of design rationale. Final
construction plan sets shall incorporate all necessary sections to construct the project
through procurement of a general contractor. The design firm shall produce a right-of-
way (ROW) plan set delineating existing ROW boundaries, and required ROW for
corridor improvements reflected within plan set deliverables issued for construction.
Engineering firms shall be required to provide monthly status updates for the
contracted services via written memorandum until final construction plans, and any
associated contract documents or required permitting have been delivered whichever
is last. This project may be let for construction in phases depending on total cost to
2|Page
City of Dalton Public Works Department
RFQ East Morris St. Corridor Improvements
construct the final design. Contingencies associated with cost are requested to be
incorporated by the engineer to provide multiple quantity takeoffs within incremental
stations of the full design for each predetermined phase of the improvements to be
individually let for construction. The engineering firm shall deliver all technical
specifications incorporated within the construction bid package for the full
construction plans. With the exception of directed incremental quantity takeoffs and
bid package technical specifications, the consultant shall only be required to provide
services for bid package production for the first construction phase of the project
once determined as the design progresses.
Program Delivery Exclusions:
Consultant is not requested to provide the following services:
1. Procurement Oversight – Procurement Administration (Anything Beyond Bid
Package Production with the Exception of Assistance with RFI’s as Requested
by the City)
REQUESTED QUALIFICATIONS SUBMITTAL:
o Statement of firm qualifications and portfolio of completed projects of a
similar scope illustrating a proven record of experience and technical
expertise.
PROPOSAL REQUIRED SCOPE OF SERVICES
Streetscape Design Elements
o Sidewalk Design and ADA Compliance:
1. Design and analysis of the sidewalk network to ensure compliance
with the Americans with Disabilities Act (ADA).
2. Ensure connectivity and continuity of sidewalks throughout the
project area, particularly addressing gaps in pedestrian routes.
3. Evaluate existing pedestrian infrastructure and design upgrades to
existing infrastructure if needed.
4. Evaluate and propose necessary modifications to ensure ease of
access for individuals with disabilities, including crosswalks, ramps,
and curb extensions.
3|Page
City of Dalton Public Works Department
RFQ East Morris St. Corridor Improvements
5. Sidewalk to include continuity on both sides of the corridor with a
grassed beauty strip where feasible.
o Curb and Gutter Design:
1. Incorporate curb and gutter enhancements necessary for urban
streetscape traffic safety and stormwater management best
practices.
o Driveway Alterations
1. Incorporate alterations to existing driveways as needed for meeting
objectives within the project scope.
o Intersection Enhancements, Traffic Signal & Pavement Markings
1. Inclusive of all other associated elements required for the corridor
improvements design.
o On-Street Parking
1. Incorporate on-street parking where conducive to do so.
2. At appropriate preliminary design stages, consultant shall propose
recommendations for conducive on-street parking locations for the
City to review.
o Mid-Block Pedestrian Crossings
1. Evaluate the feasibility of including mid-block pedestrian crossings in
areas warranted within the corridor limits.
2. At an appropriate preliminary design stage, consultant shall propose
recommendations for conducive mid-block crossing locations for
consideration of incorporating into final design.
o Center Island & Raised Medians
1. Center islands and raised medians shall be incorporated where
deemed appropriate for best transportation design practices, and any
applicable objectives specified within the project scope.
o Minimum Required Landscaping Elements
1. The intent is to provide the minimum landscaping elements associated
with identification and incorporation of grassed beauty strips, and
grassed islands that are potentially conducive for installing shrubs &
trees to be completed at a later date. The City intends to involve its
Arborist during the design development to provide feedback
regarding landscaped areas.
o Stormwater Management
1. Design services for new stormwater infrastructure required to
construct hardscape elements within the corridor.
2. Evaluate performance of existing stormwater infrastructure, and
incorporate necessary drainage improvements to mitigate hydraulic
deficiencies for specified minimum storm event levels of service as
4|Page
City of Dalton Public Works Department
RFQ East Morris St. Corridor Improvements
specified within the Whitfield-Dalton Stormwater Local Design
Manual.
Other Required Services
1. Traffic Studies
o Consultant shall be responsible for conducting all required traffic count data
collection and interpretation services when necessary to meet objectives
specified within the project scope.
2. Utility Conflict Adjustments and Coordination:
o Coordination with local utility providers for conflict resolution of proposed
improvements.
o Incorporate utility conflict adjustments within construction plans.
o The intent of this project is only to require underground relocations or
additions as necessary for meeting specified objectives within the project
scope.
3. Field Survey
o Consultant shall be responsible for obtaining all field survey data.
4. Construction Plans
o Provide plan set iterations and accompanied documents outlined within the
program delivery narrative.
5. Right-of-Way Plans
o Develop right of way plans reflecting the existing, and required right-of-way
as applicable for the entirety of the study corridor.
6. CAD Drawings
o Provide survey & final design CAD files to the city in .dwg format compatible
with current Autodesk Civil3D applications.
7. Procurement Documentation Production
o Provide procurement assistance inclusive of bid package production utilizing
the City’s standard bid package and contract documents.
o Provide any technical specifications necessary for construction of proposed
improvements.
o Assistance with contractor RFI’s as needed by the City during procurement &
through construction.
8. Engineer’s Estimate
5|Page
This page summarizes the opportunity, including an overview and a preview of the attached documents.
* Disclaimer: This website provides information about bids, requests for proposals (RFPs), or requests for qualifications (RFQs) for convenience only and does not serve as an official public notice. Individuals who wish to respond to or inquire about bids, RFPs, or RFQs should contact the relevant government department directly.

Sign-up for a Free Trial, Government Bid Alerts

With Free Trial, you can:

You will have a full access to bids, website, and receive daily bid report via email and web.

Try One Week FREE Now

See Also

Follow 508-22-104 | Upgrade PACS System Active Contract Opportunity Notice ID 36C24726R0096 Related

VETERANS AFFAIRS, DEPARTMENT OF

Bid Due: 8/19/2026

Follow Market Research - Design-Build General Construction Multiple Award Task Order Contract -

DEPT OF DEFENSE

Bid Due: 8/21/2026

VARIOUS PAVING FY26 INVITATION TO BID CITY OF RINGGOLD PURCHASING P.O. BOX 579

City of Ringgold

Bid Due: 9/07/2026

26-026-LH Walnut Street Improvement Project-IFB (12/29/25) November 24, 2025 Published by ntharpe 1.

Macon Bibb County

Bid Due: 12/29/2026