Request for Qualifications: Construction Manager at Risk Services SMF Taxiway A, A3, and A13 Pavement Rehabilitation Project

Agency: Sacramento County
State: California
Type of Government: State & Local
NAICS Category:
  • 236220 - Commercial and Institutional Building Construction
  • 237310 - Highway, Street, and Bridge Construction
  • 237990 - Other Heavy and Civil Engineering Construction
  • 541330 - Engineering Services
  • 541611 - Administrative Management and General Management Consulting Services
Posted Date: Jun 25, 2026
Due Date: Jul 30, 2026
Solicitation No: 4712
Original Source: Please Login to View Page
Contact information: Please Login to View Page
Bid Documents: Please Login to View Page

Description


Project ID: 4712

Title: Request for Qualifications: Construction Manager at Risk Services SMF Taxiway A, A3, and A13 Pavement Rehabilitation Project

Addenda: 0

Release Date: 6/25/2026

Due Date: 7/30/2026

Follow
Request for Qualifications: Construction Manager at Risk Services SMF Taxiway A, A3, and A13 Pavement Rehabilitation Project
Solicitation
Airports
30500 , 90610 , 90625 , 90735 , 90740 ... show all
Project ID: 4712
Release Date: Thursday, June 25, 2026
· Due Date: Thursday, July 30, 2026 2:00pm
Posted Thursday, June 25, 2026 8:00am
All dates & times in Pacific Time
Draft Response Events RSVP No Bid34 days, 20 hours, 3 minutes


Post Information

Posted At:Thu, Jun 25, 2026 8:00 AM
Sealed Bid Process:Yes (Bids Sealed / Pricing Sealed)
Private Bid:No
Overview


Summary

The County of Sacramento ("County") Department of Airports ("Airports") is seeking Statements of Qualifications (SOQs) from a qualified firm, partnership, corporation, association, persons, or professional organizations as construction manager at-risk (“CMAR” or “Firm”) to reconstruct and rehabilitate Taxiways A, A3, and A13 at the Sacramento International Airport ("SMF").

Respondents interested in providing CMAR services will partner with the Department's Project Manager and Department’s Consultant Designer (RDM International, Inc.) to deliver the Project. As part of the Project team, the Construction Manager will be asked to provide input on schedule, phasing, constructability, cost and estimates, value engineering, and plan review throughout the design process. The Construction Manager will also be required to develop and submit to the Department one or more guaranteed maximum prices ("GMPs") for all labor, equipment, and materials to construct the Project.

The Department anticipates entering into a single contract (CMAR Contract) with the Construction Manager that contains a fee for preconstruction services (Phase 1) and sets forth an agreed-upon process for establishing one or more GMPs for the construction phase (Phase 2). If the Department accepts the GMPs, the Department will issue a Notice to Proceed to commence Phase 2. If the GMPs are not accepted by the Department, the Department reserves the right to terminate the CMAR Contract at the completion of Phase 1.

CMARs that intend to submit an SOQ must meet the following minimum requirements:

  • Ability to provide adequate bonds and insurance commensurate with the work to be performed, as more particularly described in the sample CMAR Contract attached as Exhibit 2 within the Request for Qualifications ("RFQ")
  • Hold a Class A California Contractors License which is current, valid, and in good standing with the California Contractors State License Board.
  • Be registered with the California Department of Industrial Relations ("DIR") and qualified to perform public work as required by California Labor Code sections 1771.5 and 1725.5.

In addition, experience in the following areas is desired:

  • Have delivered at least two (2) projects using CMAR delivery method of similar size and complexity as this Project and managed work through GMP contracts with proven ability to manage progressive GMPs with defined controls.
  • Delivered three (3) airfield construction projects on active airfield environments within the past ten (10) years.
  • Have experience working with government agencies and with public works projects, including applicable public contracting and labor compliance requirements.


Timeline

Release Project Date:
June 25, 2026
Pre-Bid Meeting (Optional) (Non-Mandatory):
July 7, 2026, 1:00pm
6705 Lindbergh Dr., Sacramento, CA, 95837
Question Submission Deadline:
July 17, 2026, 5:00pm
Submission Deadline:
July 30, 2026, 2:00pm
Interviews (Tentative) - "Week of":
August 24, 2026
Get Government Bids Like This by Email Receive daily bid alerts that match your keywords, business categories, and target regions.

See Also

Basic Information Title IFB 133887 Airfield South Perimeter Fence Replacement Agency California Military

State Government of California

Due by 11/24/2026

Basic Information Title Simpkins Stadium Center Roof & HV Replacement Agency CSU, San

State Government of California

Due by 12/10/2026

RFQ/P #26-27-12 Franklin High School Building "A" HVAC Project Franklin_HVAC_DSA_Approved_DRAWING_A Franklin_Building_A_HVAC_Project_Manual_LLB_Documents_and_SPECS A

Stockton Unified School District

Due by 11/19/2026

Project: FY2023-24 Culvert Replacements - Lincoln Rd at Snake River Ref. #: ST31002440N

Sutter County

Due by 11/10/2026

* Disclaimer: This website provides information about bids, requests for proposals (RFPs), or requests for qualifications (RFQs) for convenience only and does not serve as an official public notice. Individuals who wish to respond to or inquire about bids, RFPs, or RFQs should contact the relevant government department directly.