Request for Qualifications: City Public Works Shops Schematic Design

Agency: City of Port Townsend, WA
State: Washington
Type of Government: State & Local
NAICS Category:
  • 236220 - Commercial and Institutional Building Construction
  • 541310 - Architectural Services
  • 541330 - Engineering Services
Posted Date: May 19, 2025
Due Date: May 30, 2025
Original Source: Please Login to View Page
Contact information: Please Login to View Page
Bid Documents: Please Login to View Page

Description

Request for Qualifications: City Public Works Shops Schematic Design
Bid/RFP Status:
Open - accepting bids and proposals
Bid/RFP Due Date:
Friday, May 30, 2025 - 5:00pm

Schematic Design for a new Municipal Service Center – Public Works Shops

The City of Port Townsend is requesting qualifications for architecture and engineering consulting services to work with designated staff to develop schematic design for a new City Maintenance Facility.

The existing Public Works shops located on Beach St. currently houses our Public Works
Department/ Fleet Department/ Storm and Water distribution crews. This site consists of older portable units that have reached their useful life expectancy and is undersized for such a large crew. The new proposed facility would be expanded to include other functions of city maintenance.

This first step in this project will be to hire a consultant to develop a schematic design towards building a new Municipal Service Center adjacent to our water filtration and reservoir property.
Key square footage evaluations are anticipated under the following areas, all of which would need to be verified through the schematic design process and space analysis:

ESTIMATED SQ FT NEEDED
Water Distribution: 2,000 SQFT
Waste Water Collection: 2,000 SQFT Storm Water: 1825 SQFT
Streets: 1825 SQFT
Fleet: 5,200 SQFT
Facilities: 1,500 SQFT
Parks: 3,500 SQFT
Non Building Open Space: 6,500 SQFT
Total SQFT NEEDED: 24,350 SQFT

SCHEMATIC DESIGN
1. The Designer shall confirm prepare Schematic Design consisting of drawings and other
documents illustrating the scale and relationship of Project components for approval by the City. Schematic design will include preliminary environmental analysis to ensure permitting is possible.
2. The Designer will be required to prepare detailed room data sheets and diagrams establishing necessary adjacencies and proximities, as appropriate. The Designer will facilitate tours of other similar facilities to establish level of improvement and appropriate cost boundaries.
3. Deliverables and services of the Designer in connection with Phase 1 will include but not be
limited to:
A. Develop design to illustrate general issues of layout, rough elevation, volumes, accessibility,
site impact, etc. Identify any cost premiums that may be associated with the proposed design.
B. Evaluation of any state or municipal zoning or regulations including local design guidelines
that might impact the concept.
C. Engineering analysis to include structural, soil, subsurface and site prep analysis, etc.
D. Site plan, floor plans, building elevations, and typical building sections.
E. Floor plans with proposed furniture and equipment layout.
F. One construction planning level cost estimate
G. Tabulations of square footage called for in the Space Needs Assessment and comparison to square footage shown on architectural plans.
H. Site plan (1″ = 40 ft. or larger) identifying any impacts to existing parking, grading, building
location, construction phasing (as applicable) and designation of utilities. Indicate areas for
potential future expansion.
I. Color renderings of the proposed Project for display and presentation purposes and other
materials if required by local design guidelines.
J. Assistance in the preparation for and presentation to the City Council. FUTURE PHASES
Future phases of work could include all design services up to and through construction. The City has not yet funded the entire project, so proceeding with future phases depends on available funding.

BUDGET
The budget for this work is $210,000 for services rendered.

Qualifications will be evaluated based on experience with completed public construction projects of similar size and complexity of the project. The submitter’s ability to provide the opportunity for fast track design options. Submitter’s prior experience in working with staff and community involvement groups during the design and construction phases. Submitter’s understanding of the project goals and proposed design solutions. The Owner’s assessment of the availability to provide subsequent final design and construction service. Submitter’s immediate availability to begin the project after the Notice to Proceed is executed. The Owner’s assessment of the suggested procedures and timetable to carry out the work as described in the scope of services and project timing as described in the proposal. The proposal shall clearly demonstrate the ability to complete the work in the allotted time frame. Submitter’s financial Stability: Credit references, annual reports, recent financial statements, and bonding capacity may be requested.

PROJECT TIMING

The tentative Project schedule, which is subject to change as determined by the Owner, is as follows:
Project Advertisement: 5/12/25

Designer Submissions: 5/30/25

Interviews Conducted (If Required): 6/2/25

Negotiation and Award: 6/9/25

Project Completed By: 11/1/25

EQUAL OPPORTUNITY: It is City of Port Townsend's policy to ensure full compliance with Title VI of the Civil Rights Act of 1964 by prohibiting discrimination against any person on the basis of race, color, national origin or sex in the provision of benefits and services.

For additional information, refer to the following documents on the City’s website at https://cityofpt.us/citycouncil/page/city-plans-
• 2025 Annual City Budget
• 2025 Capital Facilities Plan
• 2019 Facilities Condition Assessment

Please submit all questions to Michael Todd mtodd@cityofpt.us .

Firms and/or individuals are requested to submit a short statement of qualifications by 5:00 PM May 30th, 2025, via email or by mail to:
City of Port Townsend
Attn: Michael Todd, Facilities and Parks Manager
250 Madison St.
Port Townsend, WA 98368

Supporting Documents
Michael Todd Facilities and Parks Manager (360) 379-5081 x5081 mtodd@cityofpt.us
Get Government Bids Like This by Email Receive daily bid alerts that match your keywords, business categories, and target regions.

See Also

Bid Title: Overlake Accessibility Improvements Request for Qualifications Category: Bidding & Contracting Opportunities

City of Redmond

Due by 9/23/2026

Bid Title: Traffic Calming and Pedestrian Safety Measures in Redmond, Washington Category: Bidding

City of Redmond

Due by 10/09/2026

2026-057-RSOQ-FAC-Water Intrusion Diagnostic Engineering Services Event ID: 1238908 Event Type: RSOQ Published Date:

Clark County Public Transportation Benefit Area Authority (C-Tran)

Due by 9/25/2026

Basic Information Solicitation Number MC-0322761 Title Building 161E Renovation and Systems Retrofit_ Status

Port of Seattle

Due by 10/22/2026

* Disclaimer: This website provides information about bids, requests for proposals (RFPs), or requests for qualifications (RFQs) for convenience only and does not serve as an official public notice. Individuals who wish to respond to or inquire about bids, RFPs, or RFQs should contact the relevant government department directly.