Request for Proposals for Water Loss Control Program Design & Technical Services

Agency: City of Santa Cruz
State: California
Type of Government: State & Local
NAICS Category:
  • 541330 - Engineering Services
  • 541611 - Administrative Management and General Management Consulting Services
  • 541690 - Other Scientific and Technical Consulting Services
  • 541990 - All Other Professional, Scientific, and Technical Services
Posted Date: Apr 5, 2026
Due Date: Apr 24, 2026
Solicitation No: RFP No. WT-0243
Original Source: Please Login to View Page
Contact information: Please Login to View Page
Bid Documents: Please Login to View Page


Project ID: RFP No. WT-0243

Title: Request for Proposals for Water Loss Control Program Design & Technical Services

Addenda: 0

Release Date: 4/3/2026

Due Date: 4/24/2026

Follow
Request for Proposals for Water Loss Control Program Design & Technical Services
Request For Proposal
Water
94600 , 95800 , 96800 , 96891 , 96892 , 96896
Project ID: RFP No. WT-0243
Release Date: Friday, April 3, 2026
ยท Due Date: Friday, April 24, 2026 4:00pm
Posted Friday, April 3, 2026 2:31pm
All dates & times in Pacific Time
Draft Response No Bid18 days, 21 hours, 51 minutes


Post Information

Posted At:Fri, Apr 3, 2026 2:31 PM
Sealed Bid Process:No
Private Bid:No
Overview


Summary

The City of Santa Cruz Water Department (SCWD) is soliciting professional and technical services to assist with the update of its Water Loss Control Program. The focus of the scope of work is on conducting a thorough evaluation of the current regulatory environment with an emphasis on evaluating the feasibility of achieving the customized Water Loss Performance Standard by 2028 as defined by the California State Water Resources Control Board (SWRCB) per CA Water Code 10608.34 and Executive Orders B-37-16 and B-40-17 and California Senate Bill (SB) 555. SB 555 establishes Annual Reporting and Water Loss Standards for water service providers.

Proposals must include the application of standardized principles and techniques as outlined in the American Water Works Association (AWWA) M36 standard: Water Audits and Loss Control Programs in addition to the integration of innovative tools and approaches to leveraging new technologies and related data now available to SCWD.

The categorial and prioritized areas of focus and the related tasks shall be completed within calendar year 2026. Any work plans and related projects that require further professional and technical support may be evaluated and considered for continued, contractual support and implementation in Fiscal Year 2027 and 2028.



Background

The City of Santa Cruz Water Department (SCWD) owns, operates and maintains a large public water system (i.e. 200+ connections) per SWRCB permit. The treated water distribution system is composed of 270 miles of water mains with approximately 25,000 service connections.

CWD produces approximately 2.6 billion gallons of water annually from local sources composed of both surface and ground water supplies.

In 2015 and in accordance with California SWRCB and AWWA M36 standards, SCWD initiated the development of a Water Loss Control Program with an emphasis on enhancing the understanding of both the quantity and types of water loss occurring in the distribution system. In coordination with consultant support, the early phases of program development were designed to enhance water auditing methodology and data collection procedures with the goal of accomplishing Level 1 Validation certification per the 2016 Water Research Foundation Guidance Manual.

The consultant supported work on Water Loss Control Program development through 2019, resulting in a robust management program including annual routine activities and work plans that collectively contribute to significant improvements in data validity of the annual water audit and achieving a high level of confidence in the reported volumes of water losses.
Since 2020, multiple new technologies have been implemented at the utility level such as the completion of an Advanced Metering Infrastructure (AMI) meter replacement
program and the implementation of an asset-based Computerized Maintenance Management System (CMMS). Additionally, other utility improvements are in process such as a billing system software replacement and the installation of a new treated water effluent master meter.



Timeline

Release Project Date:
April 3, 2026
RFP Questions and Clarification Due Date:
April 17, 2026, 5:00pm
Proposal Submission Deadline:
April 24, 2026, 4:00pm
* Disclaimer: This website provides information about bids, requests for proposals (RFPs), or requests for qualifications (RFQs) for convenience only and does not serve as an official public notice. Individuals who wish to respond to or inquire about bids, RFPs, or RFQs should contact the relevant government department directly.

Sign-up for a Free Trial, Government Bid Alerts

With Free Trial, you can:

You will have a full access to bids, website, and receive daily bid report via email and web.

Try One Week FREE Now

See Also

Project ID: Informal Bidding Process for Contractors (2026) Title: Notice Inviting Applications From

City Of Tustin

Bid Due: 12/31/2026

RFx Name: BPM013253 RFx Begin Date (UTC+0): RFSQ - AS NEEDED WATER AND

County of San Diego

Bid Due: 8/31/2026

Bid Title: Architectural and Engineering Professional Services New Fire Station No. 27 Category:

City of San Mateo

Bid Due: 9/17/2026

RFP 25-26-46 Professional Design Services for Manuel Hernandez Community Center Gymnasium HVAC System

City of Visalia

Bid Due: 8/26/2026