712 Brook Street, Suite 103, Rocky Hill, CT 06067
Tel: 860.513.1473
Addendum #2
DATE:
March 5, 2026
SUBJECT:
Merwin Meadows Pond Dredging & Beach Restoration
W&S PROJECT #: ENG25-0462
To be considered as part of the contract drawings and specifications and all other contract
documents for the project referenced above; superseding previously issued Drawings,
Specifications, Bidding Requirements, Contract Documents and Addenda, to the extent
modified by this Addendum. Bidders are advised that this Addendum must be
acknowledged in the appropriate space provided on the bid form.
The following items are listed in this Addendum:
A. Information Bulletin
B. Specification Edits
A. INFORMATION BULLETIN
1. Please note, the deadline for sealed bids has been moved to Wednesday, March
11 at 4:00 p.m. prevailing time per the specification edits below. This date has
been revised in anticipation of receipt of prevailing wage rates. Another
addendum shall be issued with wage rates to be included under Section 00 43
43.
B. SEPCIFICATION EDITS
1. In the invitation to bid, replace the first sentence of the first paragraph as follows:
“Sealed bids for the Merwin Meadows Pond Dredging and Beach Restoration,
RFP # 2026-02 will be received by the Town of Wilton until 4:00 P.M. on
Wednesday, March 11, 2026 (the “Submission Deadline”).”
2. In the ADVERTISEMENT FOR BIDS”, SECTION 00 11 13, replace the first
sentence of the first paragraph as follows: “Sealed bids for construction of Merwin
Meadows Pond Dredging & Beach Restoration Project for the Town of Wilton, will
be received at the Wilton Town Hall First Selectman’s Office, 238 Danbury Road,
westonandsampson.com
Page 2
Wilton, Connecticut 06897, Attention: Steve Pierce, Parks & Recreation Director
on or before Wednesday, March 11, 2026, at 4:00 p.m., at which time and place
said bids will be publicly opened and read aloud.”
3. In the INSTRUCTION TO BIDDERS”, SECTION 00 21 13, replace the third
paragraph under item “10. CONTRACT TIME”, as follows: “The Owner wishes to
proceed with this project as soon as possible. Bidders should be prepared to
commence work on or about March 23, 2026 , and should not bid for this
contract if they will be unable to meet the Owner’s project schedule.”
END OF ADDENDUM #2
westonandsampson.com