REQUEST FOR PROPOSAL: NORTH GREEN STREET CORRIDOR PROJECT

Agency: Brownsburg town
State: Indiana
Type of Government: State & Local
NAICS Category:
  • 236220 - Commercial and Institutional Building Construction
  • 237310 - Highway, Street, and Bridge Construction
  • 237990 - Other Heavy and Civil Engineering Construction
Posted Date: Aug 5, 2025
Due Date: Sep 10, 2025
Original Source: Please Login to View Page
Contact information: Please Login to View Page
Bid Documents: Please Login to View Page

Description

Bid Title: REQUEST FOR PROPOSAL: NORTH GREEN STREET CORRIDOR PROJECT
Category: Capital Projects
Status: Open
Description:

The Town of Brownsburg (TOB) is seeking turn-key professional Engineering services necessary for improvements along the North Green Street Corridor.

Earlier this year, First Group Engineering performed a traffic impact analysis of the corridor. The results of this study are attached for reference purposes only. The finalized recommended improvements approach is as follows:

“Alternative 2: Traffic Warrants + Additional Lane Improvements. This improvement was found to have the lowest overall delay and the second lowest cost. It should be noted that the intersections of Green St and the I-74 ramps fall under INDOT jurisdiction and thus any improvements to these intersections will require coordination with the INDOT Crawfordsville District.

The existing traffic signals along Green Street operate as part of a coordinated system. Any proposed signal installations in this study are intended to integrate with that system to support efficient corridor-wide traffic flow and minimize delay during peak periods. This coordinated system will help closely spaced signalized intersections operate in a way to avoid traffic queues from one signalized intersection backing up into another signalized intersection.”

The agreed upon final intersection improvements are below:

  • Green St & Loraine Dr
    • Traffic Signal
  • Green St & Kroger Entrance
    • Right In – Right Out Intersection, Restricted Left Turn
  • Green St & Northfield Dr
    • Westbound Thru Lane
  • Green St & WB Ramps to I-74
    • Change the Eastbound Thru Lane to an Eastbound Left Thru Lane
  • Green St & Maplehurst Dr
    • Traffic Signal
  • Green St & Whittington Dr
    • Right In – Right Out Intersection, Northbound Right Turn Lane
Publication Date/Time:
8/5/2025 8:00 AM
Closing Date/Time:
9/10/2025 2:00 PM
Submittal Information:
Proposal shall be electronically submitted by 2:00 PM on 9/10/25
Contact Person:
RFP questions shall be submitted via email only. Response to questions shall
be distributed by addendum via email only. Emails shall be submitted to as
follows:
Sarah Craft sarah@kramercorporation.com
Shawn Pabst spabst@brownsburg.org
Aaron Kaytar akaytar@brownsburg.org
Related Documents:
Get Government Bids Like This by Email Receive daily bid alerts that match your keywords, business categories, and target regions.

See Also

Post Date 09/17/2026 Quest Number 10364705 Category Code Stormwater Improvements Bid/Request Name 83779

City of Fort Wayne

Due by 10/15/2026

Wade Utility Plant Condensate Polisher Installation - 2026 (Re-Bid) C.40.11947 Purdue University Project

Purdue University

Due by 10/15/2026

project name company name pre-bid date bid date bids in BL000B Multi Building

Indiana University

Due by 10/01/2026

113-9-1-26-4 - Fire Station #5 Quest Number: 10370944 Closing Date: Thu, 10/22/2026 02:00

City of Fort Wayne

Due by 10/22/2026

* Disclaimer: This website provides information about bids, requests for proposals (RFPs), or requests for qualifications (RFQs) for convenience only and does not serve as an official public notice. Individuals who wish to respond to or inquire about bids, RFPs, or RFQs should contact the relevant government department directly.