REQUEST FOR PROPOSAL: NORTH GREEN STREET CORRIDOR PROJECT

Agency: Brownsburg town
State: Indiana
Type of Government: State & Local
NAICS Category:
  • 236220 - Commercial and Institutional Building Construction
  • 237310 - Highway, Street, and Bridge Construction
  • 237990 - Other Heavy and Civil Engineering Construction
Posted Date: Aug 5, 2025
Due Date: Sep 10, 2025
Original Source: Please Login to View Page
Contact information: Please Login to View Page
Bid Documents: Please Login to View Page
Bid Title: REQUEST FOR PROPOSAL: NORTH GREEN STREET CORRIDOR PROJECT
Category: Capital Projects
Status: Open
Description:

The Town of Brownsburg (TOB) is seeking turn-key professional Engineering services necessary for improvements along the North Green Street Corridor.

Earlier this year, First Group Engineering performed a traffic impact analysis of the corridor. The results of this study are attached for reference purposes only. The finalized recommended improvements approach is as follows:

“Alternative 2: Traffic Warrants + Additional Lane Improvements. This improvement was found to have the lowest overall delay and the second lowest cost. It should be noted that the intersections of Green St and the I-74 ramps fall under INDOT jurisdiction and thus any improvements to these intersections will require coordination with the INDOT Crawfordsville District.

The existing traffic signals along Green Street operate as part of a coordinated system. Any proposed signal installations in this study are intended to integrate with that system to support efficient corridor-wide traffic flow and minimize delay during peak periods. This coordinated system will help closely spaced signalized intersections operate in a way to avoid traffic queues from one signalized intersection backing up into another signalized intersection.”

The agreed upon final intersection improvements are below:

  • Green St & Loraine Dr
    • Traffic Signal
  • Green St & Kroger Entrance
    • Right In – Right Out Intersection, Restricted Left Turn
  • Green St & Northfield Dr
    • Westbound Thru Lane
  • Green St & WB Ramps to I-74
    • Change the Eastbound Thru Lane to an Eastbound Left Thru Lane
  • Green St & Maplehurst Dr
    • Traffic Signal
  • Green St & Whittington Dr
    • Right In – Right Out Intersection, Northbound Right Turn Lane
Publication Date/Time:
8/5/2025 8:00 AM
Closing Date/Time:
9/10/2025 2:00 PM
Submittal Information:
Proposal shall be electronically submitted by 2:00 PM on 9/10/25
Contact Person:
RFP questions shall be submitted via email only. Response to questions shall
be distributed by addendum via email only. Emails shall be submitted to as
follows:
Sarah Craft sarah@kramercorporation.com
Shawn Pabst spabst@brownsburg.org
Aaron Kaytar akaytar@brownsburg.org
Related Documents:
* Disclaimer: This website provides information about bids, requests for proposals (RFPs), or requests for qualifications (RFQs) for convenience only and does not serve as an official public notice. Individuals who wish to respond to or inquire about bids, RFPs, or RFQs should contact the relevant government department directly.

Sign-up for a Free Trial, Government Bid Alerts

With Free Trial, you can:

You will have a full access to bids, website, and receive daily bid report via email and web.

Try One Week FREE Now

See Also

Project Number: 48003016-2026-034-C1 Notice To Bidder: New Salt Building in Fortville, IN Project

State Government of Indiana

Bid Due: 6/25/2026

Follow Unmanned Fusion Warfare Laboratory at NSWC Crane IN Active Contract Opportunity Notice

DEPT OF DEFENSE

Bid Due: 6/15/2026

Army National Guard - Stout Field Building 7 Location: 2002 South Holt Rd

Weddle Bros.

Bid Due: 6/11/2026

Ensign Graham Edward Martin Park Playground and Splash Pad Project RFB-17DPR-343 Dept of

City of Indianapolis and Marion County

Bid Due: 7/02/2026