REQUEST FOR PROPOSAL: NORTH GREEN STREET CORRIDOR PROJECT
| Agency: |
Brownsburg town |
| State: |
Indiana |
| Type of Government: |
State & Local |
| NAICS Category: |
- 236220 - Commercial and Institutional Building Construction
- 237310 - Highway, Street, and Bridge Construction
- 237990 - Other Heavy and Civil Engineering Construction
|
| Posted Date: |
Aug 5, 2025 |
| Due Date: |
Sep 10, 2025 |
| Original Source: |
Please Login to View Page |
| Contact information: |
Please Login to View Page |
| Bid Documents: |
Please Login to View Page |
Description
|
Bid Title:
|
REQUEST FOR PROPOSAL: NORTH GREEN STREET CORRIDOR PROJECT
|
|
Category:
|
Capital Projects
|
|
Status:
|
Open
|
|
Description:
|
|
The Town of Brownsburg (TOB) is seeking turn-key professional Engineering services necessary for improvements along the North Green Street Corridor.
Earlier this year, First Group Engineering performed a traffic impact analysis of the corridor. The results of this study are attached for reference purposes only. The finalized recommended improvements approach is as follows:
“Alternative 2: Traffic Warrants + Additional Lane Improvements. This improvement was found to have the lowest overall delay and the second lowest cost. It should be noted that the intersections of Green St and the I-74 ramps fall under INDOT jurisdiction and thus any improvements to these intersections will require coordination with the INDOT Crawfordsville District.
The existing traffic signals along Green Street operate as part of a coordinated system. Any proposed signal installations in this study are intended to integrate with that system to support efficient corridor-wide traffic flow and minimize delay during peak periods. This coordinated system will help closely spaced signalized intersections operate in a way to avoid traffic queues from one signalized intersection backing up into another signalized intersection.”
The agreed upon final intersection improvements are below:
-
Green St & Loraine Dr
-
Green St & Kroger Entrance
-
Right In – Right Out Intersection, Restricted Left Turn
-
Green St & Northfield Dr
-
Green St & WB Ramps to I-74
-
Change the Eastbound Thru Lane to an Eastbound Left Thru Lane
-
Green St & Maplehurst Dr
-
Green St & Whittington Dr
-
Right In – Right Out Intersection, Northbound Right Turn Lane
|
|
Publication Date/Time:
|
|
8/5/2025 8:00 AM
|
|
Closing Date/Time:
|
|
9/10/2025 2:00 PM
|
|
Submittal Information:
|
|
Proposal shall be electronically submitted by 2:00 PM on 9/10/25
|
|
Contact Person:
|
RFP questions shall be submitted via email only. Response to questions shall
be distributed by addendum via email only. Emails shall be submitted to as
follows:
Sarah Craft sarah@kramercorporation.com
Shawn Pabst spabst@brownsburg.org
Aaron Kaytar akaytar@brownsburg.org
|
|
Related Documents:
|
|
|
|
Get Government Bids Like This by Email
Receive daily bid alerts that match your keywords, business categories, and target regions.
See Also
Project: IndyGo 1501-Emergency Generator Replacement Project-PR#179 Ref. #: IFB 26-10-595 Type: IFB Status:
Indianapolis Public Transportation Corporation
Due by 11/25/2026
Post Date 10/29/2026 Quest Number 10422339 Category Code Sidewalks/Curbs/Gutters Bid/Request Name 0482S -
City of Fort Wayne
Due by 11/12/2026
Post Date 11/03/2026 Quest Number 10385947 Category Code Bridge (Replacement or Rehabilitation) Bid/Request
Allen County
Due by 11/17/2026
Post Date 10/29/2026 Quest Number 10393524 Category Code Street/Roadway Reconstruction Bid/Request Name 0914S
City of Fort Wayne
Due by 11/12/2026
* Disclaimer: This website provides information about bids, requests for proposals (RFPs), or requests for qualifications (RFQs) for convenience only and does not serve as an official public notice. Individuals who wish to respond to or inquire about bids, RFPs, or RFQs should contact the relevant government department directly.