Request for Proposal - Housing First Flooring Replacement

Agency: Tanana Chiefs Conference
State: Alaska
Type of Government: State & Local
NAICS Category:
  • 238330 - Flooring Contractors
Posted Date: May 27, 2026
Due Date: Jun 19, 2026
Original Source: Please Login to View Page
Contact information: Please Login to View Page
Bid Documents: Please Login to View Page
Request for Proposal – Housing First Flooring Replacement
May 27, 2026
I. Solicitation

Tanana Chiefs Conference (TCC) is soliciting bids from qualified contractors for a floor replacement project at the Housing First Facility located at 1521 South Cushman Street, Fairbanks, Alaska.

Registration / Questions:

Each IDIQ contractor must declare their intent to propose on this project by May 29, 2026 via email to
Project Manager Jeffry Coghill at jeffry.coghill@tananachiefs.org .

Please include firm name, address, telephone number, email address, and name of contact person.

Site Visit:

A non-mandatory site visit will be held at 10:00 AM on June 4, 2026 on site.

Written Questions and Addenda Publication:

All questions must be submitted in writing to
jeffry.coghill@tananachiefs.org
on or before June 11, 2026, by 2:00 PM Alaska Time (AKT).

Bid Submission Deadline:

Bids must be received by email no later than
June 19, 2026, at 2:00 PM Alaska Time (AKT), sent to
jeffry.coghill@tananachiefs.org .

Bids received after the time announced will not be considered, unless otherwise determined by TCC.

Additional Bid Submission Details:
  • Only emailed electronic bids will be accepted. A delivery and read receipt is recommended.
  • Bids will not be opened publicly.
  • Faxed bids will not be accepted.
II. Project Overview

Tanana Chiefs Conference is a non-profit Tribal Organization that provides health services, education, training,
and workforce development opportunities to more than 10,000 Alaska Natives located in 42 villages throughout Interior Alaska.

Project Team: Project Delivery:

Method: Design-Bid-Build

III. Scope of Work

Each bidder shall thoroughly examine the work area and be familiar with the contract documents. The failure or neglect of a bidder to receive or examine any contract document, or any part thereof, shall in no way relieve it from any obligations with respect to its bid or to the contract. No claim for additional compensation shall be allowed which is based upon a lack of knowledge of any contract document.

The scope of work includes the following activities:

A. Demolition: Reference Appendix B #1 for site-specific drawings and demolition parameters.

B. New Construction: Reference Appendix B #2 for site-specific drawings and specified replacement flooring and cove base.

C. Inspections: A substantial completion inspection shall be carried out by TCC at the approval of the TCC Project Manager, with 5 days’ notice from the Contractor.

D. Work Plan & Schedule: Immediately after the Notice of Intent to Award, the Contractor is responsible for developing and submitting a formal Work Plan & Schedule based on procurement of the required materials and phasing of the project. Contractor shall also submit product data for approval for all products incorporated into the work. The Work Plan & Schedule will be used by TCC to notify building users of upcoming activities and coordination. The Contractor will provide 2-week look ahead schedules as work progresses and update the document weekly during construction activities. The Work Plan & Schedule shall be submitted to TCC for review within seven working days of the NOITA.

E. Close-Out: Contractor will provide as-built drawings denoting variation from design, O&M data as applicable to equipment, and any on-site owner training required to operate and maintain the equipment safely and effectively.

Attachment Preview

HOUSING FIRST
FLOORING
REPLACEMENT
May 21, 2026
HOUSING FIRST FLOORING REPLACEMENT
TABLE OF CONTENTS
May 21, 2026
I.
SOLICITATION .................................................................................................................................... 3
II.
PROJECT OVERVIEW .......................................................................................................................... 3
III. SCOPE OF WORK................................................................................................................................ 4
IV. SCHEDULE ......................................................................................................................................... 6
V.
WORK CONSIDERATIONS/RESTRICTIONS ............................................................................................ 6
VI. PREVAILING WAGE ............................................................................................................................ 7
VII. BID SUBMISSION REQUIREMENTS ...................................................................................................... 8
VIII. BID EVALUATION ............................................................................................................................... 8
IX. TERMS AND CONDITIONS................................................................................................................... 9
X.
APPENDICES ...................................................................................................................................... 9
APPENDIX A - Bid Form
APPENDIX B - Drawings & Supporting Documents
Appendix C - Insurance Requirments
2
HOUSING FIRST FLOORING REPLACEMENT
May 21, 2026
I. Solicitation
Tanana Chiefs Conference (TCC) is soliciting bids from qualified contractors for a floor replacement project at
the Housing First Facility located at 1521 South Cushman Street, Fairbanks Alaska.
Registration/Questions: Each IDIQ contractor must declare their intent to propose on project by May 29, 2026
via an email to Project Manager, Jeffry Coghill; jeffry.coghil@tananachiefs.org. Include firm name, address,
telephone, email address, and name of contact person.
Site Visit: A non-mandatory site visit will be held at 10:00am June 4, 2026 on site.
Written Questions and Addenda Publication: All questions must be submitted in writing
to jeffry.coghill2tananachiefs.org on or before June 11, 2026,
2026 by 2:00 PM Alaska Time (AKT).
Bid Submission Deadline: Bids must be received by email no later than June 19, 2026, 2:00 PM (AKT), sent
to jeffry.coghill@tananachiefs.org. Bids received after the time announced will not be considered, unless
otherwise determined by TCC.
Additional bid submission details:
Only emailed electronic bids will be accepted - recommend setting a delivery and read receipt
Bids will not be opened publicly
Faxed bids will not be accepted
II. Project Overview
Tanana Chiefs Conference is a non-profit Tribal Organization who provides health services, education, training,
and work force development opportunities to more than 10,000 Alaska Natives located in 42 Villages throughout
Interior Alaska.
3
HOUSING FIRST FLOORING REPLACEMENT
Project Team:
Owner:
Project Manager:
Project Engineer:
Designer:
Tanana Chiefs Conference
Jeffry Coghill jeffry.coghill@tananachiefs.org
May 21, 2026
Project Delivery
Method:
Design-Bid-Build
III. Scope of Work
Each bidder shall thoroughly examine the work area and be familiar with the contract documents. The failure or
neglect of a bidder to receive or examine any contract document or any part thereof shall in no way relieve it from
any obligations with respect to its Bid or to the contract. No claim for additional compensation shall be allowed
which is based upon a lack of knowledge of any contract document.
The scope of work includes the following activities:
A. Demolition: Reference Appendix B #1 for site specific drawings, and demo parameters.
B. New Construction: Reference Appendix B #2 for site specific drawings and specified replacement
flooring and cove base.
4
HOUSING FIRST FLOORING REPLACEMENT
May 21, 2026
C. Inspections
A substantial completion inspection shall be carried out by TCC. At approval of TCC project manager,
with 5 days notice from Contractor.
D. Work Plan & Schedule: Immediately after the Notice of Intent to Award, the Contractor is responsible
for developing and submitting a formal Work Plan & Schedule based on procurement of the required
materials and phasing of the project. Contractor shall also submit for approval, product data for all
products incorporated into the work. The Work Plan & Schedule will be used by TCC to notify building
users of upcoming activities and coordination. The Contractor will provide 2-week look ahead
schedules as work progresses and update the document weekly during construction activities. The
Work Plan & Schedule shall be submitted to TCC for review within 7 working days of the NOITA.
E. Close-Out: Contractor will provide as built drawings denoting variation from design, O&M data as
applicable to equipment, and provide any on site owner training required to operate and maintain
the equipment safely and effectively.
5
This page summarizes the opportunity, including an overview and a preview of the attached documents.
* Disclaimer: This website provides information about bids, requests for proposals (RFPs), or requests for qualifications (RFQs) for convenience only and does not serve as an official public notice. Individuals who wish to respond to or inquire about bids, RFPs, or RFQs should contact the relevant government department directly.

Sign-up for a Free Trial, Government Bid Alerts

With Free Trial, you can:

You will have a full access to bids, website, and receive daily bid report via email and web.

Try One Week FREE Now

See Also

Follow ACS Loan Closet Kitchen Equipment Replacement Active Contract Opportunity Notice ID W912D0-24-R-0019

DEPT OF DEFENSE

Bid Due: 8/27/2027

Dalton Highway MP 315.5 Permanent Repairs Plan Holders List Northern Region , North

State Government of Alaska

Bid Due: 6/23/2026

ITB#26-22-214614 Railroad Tie Disposal Services ITB #26-22-214614; Railroad Tie Disposal Services Posting Date:

Alaska Railroad

Bid Due: 6/30/2026