Request for Proposal for San Miguel County Road 58P Retaining Wall Construction

Agency: San Miguel County
State: Colorado
Type of Government: State & Local
NAICS Category:
  • 236220 - Commercial and Institutional Building Construction
  • 237310 - Highway, Street, and Bridge Construction
  • 237990 - Other Heavy and Civil Engineering Construction
  • 238910 - Site Preparation Contractors
Posted Date: Apr 28, 2026
Due Date: May 26, 2026
Original Source: Please Login to View Page
Contact information: Please Login to View Page
Bid Documents: Please Login to View Page
Bid Title: Request for Proposal for San Miguel County Road 58P Retaining Wall Construction
Category: Road & Bridge
Status: Open
Bid Recipient: Ryan Righetti, SMC Road & Bridge Director, ryanr@sanmiguelcountyco.gov
Description:
Request for Proposal for San Miguel County Road 58P Retaining Wall ConstructionRequest for Proposal

San Miguel County is requesting proposals for the design and construction of a mechanically stabilized earth (MSE) retaining wall on a portion of County Road (CR) 58P located north of the Town of Sawpit, Colorado.

Background

San Miguel County is seeking qualified contractors to design and construct a mechanically stabilized earth retaining wall to stabilize a roadway embankment along CR 58P. The project area includes existing infrastructure such as guardrail and utilities, which must be considered during design and construction.

Due to site constraints, minimizing disturbance and material loss is a priority. The selected solution should provide long-term roadway stability while maintaining a low-profile wall design.

Scope of Work and Devlierables

The selected contractor shall provide full design, engineering, permitting support (if required), and construction services for the retaining wall. At minimum, the scope includes:

  • Design of a mechanically stabilized earth (MSE) retaining wall system
  • Construction of a low-profile retaining wall supporting a roadway width of at least 20 feet
  • Structural design calculations prepared and stamped by a Professional Engineer licensed in the State of Colorado
    1. Detailed engineering drawings including:
    2. Wall geometry and dimensions
    3. Anchoring and reinforcement systems
    4. Drainage components (if applicable)
    5. Full material specifications and quantities
    6. Construction planning and execution, including:
      1. Mobilization and demobilization of personnel, equipment, and materials
      2. Construction sequencing and schedule
      3. Site safety and access management
    7. Traffic control plan due to roadway location and constrained width conditions
    8. Identification and mitigation of impacts to existing utilities and guardrail infrastructure
    9. Minimization of site disturbance and excavation
    10. Any required rock removal, if encountered, must be performed using non-explosive methods only, clearly described in the proposal
    11. Final deliverables shall include:
      1. Stamped engineering plans
      2. Construction schedule
      3. Traffic control plan
      4. Materials list and specifications
      5. As-built documentation upon completion
Milestone Proposed Dates
  • RFP Issued April 27 th , 2026
  • Pre-Bid mandatory on site meeting on May 7 th at 1:00 PM Mountain Time (Site location approximately 0.5 miles north of the town of Sawpit on County Road 58P)
  • Questions Deadline on May 14 th , 2026 at 5:00 PM Mountain Time
  • Questions Response deadline, May 19 th , 2026 at 5:00 PM Mountain Time
  • Proposal Due by May 26 th , 2026 at 5:00 PM Mountain Time
  • Notification of Selection (Tentative) May 28 th , 2026, 4:00 PM Mountain Time
  • Contract (Tentative)
  • Project Kickoff (TBD)
  • Project completion October 15 th , 2026.

All dates are subject to change at the discretion of the County.

Inquiries

Inquiries or questions on the contents and requirements of the RFP will be accepted in written electronic form only. Inquiries can be emailed to the attention of: Ryan Righetti to For security reasons, you must enable JavaScript to view this E-mail address. using the subject line “CR 58P Retaining Wall RFP Questions”. The deadline for inquiries is May 6 th at 4:00 PM Mountain Standard Time, after which no further inquiries will be addressed.

Substantive requests for information received may be responded to in writing by the County in the form of an addendum to this RFP and sent to all recipients of the RFP.

Publication Date/Time:
4/28/2026 8:00 AM
Closing Date/Time:
5/26/2026 5:00 PM
* Disclaimer: This website provides information about bids, requests for proposals (RFPs), or requests for qualifications (RFQs) for convenience only and does not serve as an official public notice. Individuals who wish to respond to or inquire about bids, RFPs, or RFQs should contact the relevant government department directly.

Sign-up for a Free Trial, Government Bid Alerts

With Free Trial, you can:

You will have a full access to bids, website, and receive daily bid report via email and web.

Try One Week FREE Now

See Also

Description: CTF LVCF Perimeter Fencing Equip DQ1 TBD CMS201387 Department: DOC - Corrections

State Government of Colorado

Bid Due: 6/30/2026

Follow Anderson Gravel Pit Rock Crushing Active Contract Opportunity Notice ID 1240LT26Q0086 Related

AGRICULTURE, DEPARTMENT OF

Bid Due: 7/06/2026

Description: Roxborough State Park Visitor Center Bathroom Remodel Department: DNR - Division of

State Government of Colorado

Bid Due: 6/30/2026

Bid Number: PW26-06 Bid Title: RFB Metal Building Rehab for Brook Forest Estates

Clear Creek County

Bid Due: 7/02/2026